MORRISON

Operated by DAVIS OPERATING COMPANY, INC. (P-5 206036) in the MORRISON RANCH (MORROW UP. 9470) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 7668District 10Field 63066600OilCasinghead gasSaveExport
Value, all time
$1.4 M
Oct 2005 – May 2026
Value, last 12 filed months
$19 k
at the published price for each month
Months reported
248
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 20 leases and 46 wells, and the rule below applies to all of them.

Discovered
1966-02-27
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,867 ft
minimum
From a lease line
933 ft
minimum

A drilling unit in this field needs at least 160 acres.

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 06/01/2008.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition14,794 bbl$1,321,730
Casinghead gasProduction19,964 Mcf$97,466
Total$1,419,196

Wells on this lease (9)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.0037, -100.6724. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.9 miles.

36.00598, -100.67250 · centre of 7 wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
22.2%
2 of 9 wells
With a plug date
0.0%
0 of 9 wells
Median depth
9,725 ft
9 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
222.2%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
777.8%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Total depth in feet, 9 of 9 wells. Median 9,725 ft, with the middle half between 9,673 and 9,800 ft; the shallowest is 9,542 ft and the deepest 10,766 ft. The median is published rather than the mean, because a single mis-keyed depth moves a mean and cannot move a median.

When they were last completed

Last completion by decade, 9 of 9 wells, Dec 2011 – Sep 2023. This is the LAST completion filed on each wellbore, not the first — a well recompleted in 2019 counts once, in the 2010s.

Completions filed
Dec 2011 – Sep 2023
9 of 9 wells

9 wells

42-3933166021839,958 ftSep 2023
42-3932004241839,616 ftJan 2019
42-3933240981839,542 ftJul 2018
42-39332444718310,766 ftJul 2015
42-3933239961839,800 ftDec 2014Yes
42-3932004331839,725 ftSep 2013
42-393322685183A9,673 ftJul 2013
42-393322423183A9,700 ftMay 2013
42-3933222411789,740 ftDec 2011Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (248)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

248 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 2025281066.483.13$18,681
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 2021175079.795.71$13,963
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 2019174055.052.66$9,579
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 2014176096.564.18$16,995
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 2014178595.895.06$17,094
Feb 201401897.406.19$111
Jan 20140390.404.86$15
Dec 20130091.824.35$0
Nov 2013186088.853.74$16,526
Oct 2013178097.423.78$17,341
Sep 201300104.113.72$0
Aug 20133520104.253.52$36,696
Jul 20131690102.523.72$17,326
Jun 2013337094.403.93$31,813
May 2013340094.834.15$32,242
Apr 20130093.964.28$0
Mar 2013167093.623.91$15,635
Feb 2013172091.233.42$15,692
Jan 2013513091.603.42$46,991
Dec 2012172086.773.42$14,924
Nov 2012705086.953.62$61,300
Oct 2012872089.383.40$77,939
Sep 2012718094.672.92$67,973
Aug 2012172092.662.91$15,938
Jul 2012549085.133.02$46,736
Jun 2012354079.822.52$28,256
May 2012539091.612.49$49,378
Apr 201200101.652.00$0
Mar 20125490105.052.22$57,672
Feb 20125400101.102.57$54,594
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 2011181095.723.31$17,325
Oct 2011542084.983.65$46,059
Sep 2011180083.623.99$15,052
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 2011354092.904.64$32,887
May 2011179098.134.40$17,565
Apr 201100105.964.33$0
Mar 2011707096.364.06$68,127
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 201001,41972.633.98$5,647
Aug 201001,64273.684.42$7,257
Jul 201002972.554.74$137
Jun 201001,46470.364.91$7,189
May 201001,60371.124.24$6,789
Apr 20101781,50681.694.12$20,750
Mar 20101821,47578.394.39$20,740
Feb 201017265873.585.44$16,237
Jan 20101821,02774.365.96$19,659
Dec 20093571,04171.445.48$31,213
Nov 200901,08874.593.75$4,082
Oct 200901,00472.544.11$4,127
Sep 2009056765.543.06$1,738
Aug 200902,81267.423.22$9,050
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20081246675.246.92$9,787
Sep 20080171101.767.88$1,347
Aug 2008190152114.228.48$22,991
Jul 2008185202131.0811.39$26,550
Jun 2008185208131.3313.03$27,007
May 2008185195123.1711.57$25,043
Apr 2008180149110.3110.45$21,414
Mar 20080188101.909.66$1,817
Feb 200817918092.538.77$18,142
Jan 20081809890.388.21$17,073
Dec 200730213088.337.30$27,625
Nov 2007018891.677.29$1,371
Oct 20070882.856.92$55
Sep 20070075.846.24$0
Aug 200704069.066.39$256
Jul 200704570.906.39$287
Jun 200704362.007.55$325
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 200704455.108.22$362
Jan 200706250.306.73$417
Dec 200605856.656.92$401
Nov 200605954.207.62$449
Oct 200604954.906.01$295
Sep 20060060.085.04$0
Aug 200603568.717.34$257
Jul 2006183069.376.34$12,695
Jun 2006011366.286.38$721
May 2006376066.016.42$24,820
Apr 2006186364.397.36$11,999
Mar 20063803956.707.08$21,822
Feb 20061774857.597.75$10,565
Jan 200603060.598.93$268
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2025 — as filed, then multipliedworked
Oil                  281 bbl  × $ 66.48 =    $18,681
Casinghead gas         0 Mcf  × $  3.13 =         $0

────────────────────────────────────────────────────
Month total                                  $18,681

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/O/7668 is the state's own key, not one this site invented.