JAKE 540

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the LIPSCOMB, S.E. (CLEVELAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 7867District 10Field 53878250OilCasinghead gasSaveExport
Value, all time
$8.0 M
Jan 2008 – May 2026
Value, last 12 filed months
$63 k
at the published price for each month
Months reported
221
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 468 leases and 529 wells, and the rule below applies to all of them.

Discovered
1983-12-21
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2011-11-22.

The Commission's schedule remark for this field reads: FIELD

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition45,372 bbl$3,802,952
Casinghead gasProduction910,827 Mcf$4,190,965
Total$7,993,917

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.2176, -100.2151. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.21763, -100.21511 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,019 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,019 ft.

Completions filed
Jan 2008
1 of 1 wells

1 well

42-295332463H8,019 ftJan 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (221)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

221 months

May 202601,422106.413.05$4,331
Apr 202601,40498.932.87$4,029
Mar 202601,44389.753.15$4,545
Feb 202601,28863.503.75$4,830
Jan 202601,44759.138.00$11,573
Dec 202501,45156.664.41$6,404
Nov 202501,34158.593.93$5,265
Oct 202501,38759.383.30$4,584
Sep 202501,32662.743.08$4,080
Aug 202501,36463.933.01$4,112
Jul 202501,39866.743.32$4,635
Jun 202501,35666.483.13$4,243
May 202501,34660.553.23$4,351
Apr 202501,35962.363.54$4,815
Mar 202501,68367.704.27$7,184
Feb 2025035170.884.34$1,524
Jan 2025053174.324.28$2,272
Dec 2024053168.993.12$1,657
Nov 2024098169.052.20$2,157
Oct 202401,13071.372.28$2,578
Sep 202401,23769.612.36$2,925
Aug 202401,34475.632.06$2,774
Jul 202401,45279.932.15$3,117
Jun 2024087378.082.63$2,299
May 202401,67978.812.20$3,691
Apr 202401,76284.451.66$2,924
Mar 2024070680.301.55$1,091
Feb 2024057576.091.78$1,026
Jan 202401,19573.023.30$3,941
Dec 202301,22671.262.61$3,201
Nov 202301,43677.892.81$4,032
Oct 202301,32985.443.09$4,103
Sep 202301,03689.042.74$2,834
Aug 2023095980.522.67$2,563
Jul 2023090974.852.64$2,401
Jun 2023074268.962.26$1,676
May 20234186870.622.23$4,829
Apr 202301,13078.122.24$2,529
Mar 20231521,04872.852.39$13,581
Feb 2023057175.112.47$1,408
Jan 202301,21276.533.39$4,106
Dec 202201,40176.415.73$8,026
Nov 202201,15285.005.65$6,504
Oct 20221451,52987.185.86$21,607
Sep 202201,36784.888.16$11,160
Aug 202201,81594.529.13$16,566
Jul 202201,807101.587.54$13,629
Jun 202201,351115.097.98$10,777
May 202201,479109.378.43$12,472
Apr 20221481,779104.226.84$27,589
Mar 20221332,018108.885.08$24,725
Feb 202201,83191.054.86$8,897
Jan 202202,10181.844.54$9,534
Dec 20211522,16671.323.90$19,286
Nov 202102,10977.435.24$11,045
Oct 202102,22779.795.71$12,725
Sep 202102,14269.865.35$11,462
Aug 20211502,25766.024.22$19,429
Jul 202102,20970.783.98$8,796
Jun 202102,18669.493.38$7,390
May 20211702,30463.483.02$17,744
Apr 202102,12160.362.76$5,851
Mar 202102,43261.302.72$6,608
Feb 202102,60457.805.55$14,447
Jan 2021622,27050.412.81$9,505
Dec 202002,54444.642.68$6,806
Nov 202002,17538.772.71$5,887
Oct 20202272,36236.972.48$14,246
Sep 20201951,35437.091.99$9,928
Aug 202001,69039.982.39$4,031
Jul 202002,01738.371.83$3,681
Jun 202002,24434.901.69$3,793
May 202002,35216.921.81$4,268
Apr 202002,19114.751.80$3,953
Mar 20201852,12530.341.86$9,557
Feb 202002,05149.881.98$4,062
Jan 202002,33457.252.09$4,889
Dec 201902,21859.012.30$5,111
Nov 201902,07055.302.75$5,694
Oct 201902,36853.472.42$5,727
Sep 201902,05455.052.66$5,458
Aug 20190053.112.30$0
Jul 201902,37556.272.46$5,843
Jun 201902,34652.782.49$5,844
May 201902,45958.482.74$6,738
Apr 201901,95562.632.75$5,378
Mar 201901,94156.803.06$5,944
Feb 20192281,85350.852.79$16,768
Jan 20191492,06046.033.23$13,509
Dec 201802,33446.594.19$9,769
Nov 201802,25252.934.24$9,542
Oct 201802,32761.443.40$7,907
Sep 201802,25759.543.11$7,015
Aug 201802,74459.403.07$8,415
Jul 201802,39865.142.93$7,031
Jun 201802,36160.183.08$7,265
May 20181832,51765.382.90$19,266
Apr 201802,49663.842.90$7,240
Mar 201802,77761.222.79$7,739
Feb 20181712,56261.782.77$17,651
Jan 201802,98362.874.01$11,960
Dec 201703,05157.272.92$8,914
Nov 20171832,22255.423.12$17,071
Oct 201702,44949.292.98$7,307
Sep 201702,54747.523.09$7,863
Aug 20171812,93445.373.00$17,027
Jul 201703,06943.873.09$9,475
Jun 201702,52142.493.09$7,783
May 201702,86345.373.26$9,343
Apr 20171912,70747.933.21$17,848
Mar 201702,89246.772.98$8,629
Feb 20171892,91650.452.95$18,145
Jan 201702,99749.413.42$10,246
Dec 20163763,14548.763.72$30,042
Nov 201602,74842.492.64$7,267
Oct 201603,00246.193.09$9,277
Sep 201603,08241.553.10$9,556
Aug 201603,06441.442.92$8,960
Jul 20163323,49641.622.92$24,041
Jun 201603,20345.352.69$8,603
May 201603,40042.521.99$6,770
Apr 20163663,20436.561.99$19,760
Mar 201603,48133.011.79$6,245
Feb 201603,14426.472.06$6,488
Jan 201603,41427.352.36$8,072
Dec 20153573,36232.362.00$18,281
Nov 20151773,34438.792.17$14,113
Oct 201503,54743.552.43$8,607
Sep 20151923,25342.992.76$17,227
Aug 20151933,31140.162.87$17,262
Jul 201503,52648.152.95$10,384
Jun 20153853,46056.152.88$31,592
May 201503,20855.212.96$9,481
Apr 201503,32549.822.71$8,999
Mar 201503,64042.892.93$10,682
Feb 201503,27344.662.98$9,741
Jan 20152013,23843.433.10$18,769
Dec 20142003,60654.693.59$23,888
Nov 201403,23770.464.25$13,763
Oct 201403,63178.303.90$14,164
Sep 20141963,24286.164.05$30,003
Aug 20141943,02489.394.04$29,544
Jul 201403,09396.564.18$12,928
Jun 201402,96398.164.74$14,035
May 201402,95294.734.73$13,953
Apr 201402,94595.944.81$14,163
Mar 201402,68595.895.06$13,578
Feb 201402,35897.406.19$14,601
Jan 20141993,21590.404.86$33,617
Dec 201302,45591.824.35$10,690
Nov 201302,97788.853.74$11,129
Oct 201303,27097.423.78$12,359
Sep 201303,332104.113.72$12,388
Aug 201303,557104.253.52$12,530
Jul 201303,643102.523.72$13,544
Jun 20131943,82894.403.93$33,371
May 201304,08994.834.15$16,966
Apr 20131993,66593.964.28$34,394
Mar 201303,95693.623.91$15,479
Feb 201303,63591.233.42$12,431
Jan 20131994,17591.603.42$32,507
Dec 201204,28686.773.42$14,659
Nov 201204,73986.953.62$17,179
Oct 201204,62289.383.40$15,713
Sep 201204,50694.672.92$13,150
Aug 20121984,45892.662.91$31,311
Jul 201204,73785.133.02$14,310
Jun 20123554,56679.822.52$39,838
May 201204,83091.612.49$12,019
Apr 201204,917101.652.00$9,818
Mar 201204,255105.052.22$9,455
Feb 201205,116101.102.57$13,149
Jan 20121815,45698.092.73$32,671
Dec 201105,58296.873.24$18,084
Nov 201105,67295.723.31$18,782
Oct 201106,14384.983.65$22,413
Sep 20111755,58983.623.99$36,910
Aug 20111786,20283.404.15$40,579
Jul 201106,30994.144.52$28,499
Jun 20113116,54992.904.64$59,278
May 201107,12198.134.40$31,367
Apr 20111296,540105.964.33$42,008
Mar 201106,81096.364.06$27,630
Feb 201106,20985.644.18$25,954
Jan 20111767,31186.504.59$48,773
Dec 20101787,68685.734.35$48,677
Nov 20101727,13280.843.80$40,973
Oct 20101978,29978.103.51$44,506
Sep 201008,18172.633.98$32,556
Aug 20101958,13673.684.42$50,324
Jul 20101958,96572.554.74$56,610
Jun 20101958,91970.364.91$57,516
May 20101969,17771.124.24$52,806
Apr 201038111,65681.694.12$79,178
Mar 201068011,62978.394.39$104,341
Feb 201008,39773.585.44$45,700
Jan 2010648,76874.365.96$57,052
Dec 20091977,89971.445.48$57,390
Nov 200919712,09274.593.75$60,057
Oct 200967012,80972.544.11$101,250
Sep 200939312,44965.543.06$63,910
Aug 200938713,06367.423.22$68,135
Jul 200958113,30461.133.46$81,608
Jun 200977213,15866.163.90$102,326
May 200977913,68454.743.93$96,362
Apr 200958212,24346.773.59$71,142
Mar 200973713,95342.144.06$87,692
Feb 200973912,93432.814.63$84,170
Jan 200958810,39935.865.37$76,939
Dec 20081,28611,89637.105.98$118,815
Nov 200878012,96155.496.86$132,199
Oct 20081,29414,36375.246.92$196,781
Sep 20081,37414,941101.767.88$257,510
Aug 20082,10416,631114.228.48$381,400
Jul 20082,32113,548131.0811.39$458,541
Jun 20088202,213131.3313.03$136,532
May 20081,14314,163123.1711.57$304,710
Apr 20081,72514,686110.3110.45$343,825
Mar 20082,66617,215101.909.66$438,032
Feb 200810,57225,41192.538.77$1,201,096
Jan 20081,31414090.388.21$119,908

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Oil                    0 bbl  × $106.41 =         $0
Casinghead gas     1,422 Mcf  × $  3.05 =     $4,331

────────────────────────────────────────────────────
Month total                                   $4,331

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/O/7867 is the state's own key, not one this site invented.