WISHBONE 915

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the KIOWA CREEK (CLEVELAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 7916District 10Field 49563111OilCasinghead gasSaveExport
Value, all time
$6.1 M
Sep 2008 – May 2026
Value, last 12 filed months
$129 k
at the published price for each month
Months reported
213
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 71 leases and 75 wells, and the rule below applies to all of them.

Discovered
1960-12-11
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-12-05.

The Commission's schedule remark for this field reads: THE FORM OR ATTACHMENT LISTING THE WELLS.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition51,346 bbl$3,504,167
Casinghead gasProduction622,966 Mcf$2,608,101
Total$6,112,268

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 36.3413, -100.6296. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

36.34135, -100.62958 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,115 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,115 ft.

Completions filed
Sep 2008
1 of 1 wells

1 well

42-357327433H7,115 ftSep 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (213)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

213 months

May 202601,743106.413.05$5,309
Apr 20261821,61698.932.87$22,643
Mar 202601,74789.753.15$5,502
Feb 202601,51863.503.75$5,693
Jan 20261751,55959.138.00$22,817
Dec 202501,77956.664.41$7,851
Nov 20251041,67758.593.93$12,678
Oct 2025621,60959.383.30$8,999
Sep 20251091,60662.743.08$11,780
Aug 20251281,50963.933.01$12,732
Jul 2025097366.743.32$3,226
Jun 2025651,80466.483.13$9,965
May 2025951,88060.553.23$11,829
Apr 20252441,81762.363.54$21,654
Mar 20251791,97667.704.27$20,553
Feb 202501,49370.884.34$6,481
Jan 2025084074.324.28$3,594
Dec 20241791,81368.993.12$18,008
Nov 202401,73769.052.20$3,819
Oct 2024802,10971.372.28$10,521
Sep 20241882,00369.612.36$17,822
Aug 202432,00175.632.06$4,356
Jul 20241811,98779.932.15$18,733
Jun 202401,99178.082.63$5,244
May 20241451,54578.812.20$14,824
Apr 20241821,78184.451.66$18,325
Mar 2024033580.301.55$518
Feb 20241872,01176.091.78$17,816
Jan 202401,94673.023.30$6,417
Dec 20231702,04971.262.61$17,464
Nov 202301,21177.892.81$3,400
Oct 20231911,95085.443.09$22,339
Sep 202301,91789.042.74$5,243
Aug 20231891,94980.522.67$20,428
Jul 20231752,07074.852.64$18,567
Jun 202301,92568.962.26$4,348
May 20231852,19670.622.23$17,956
Apr 20231871,59478.122.24$18,175
Mar 202301,80472.852.39$4,317
Feb 20231811,72675.112.47$17,851
Jan 202302,05876.533.39$6,972
Dec 20221881,70376.415.73$24,122
Nov 202201,50685.005.65$8,503
Oct 202201,99287.185.86$11,681
Sep 20221771,92784.888.16$30,755
Aug 20221881,93394.529.13$35,413
Jul 202201,321101.587.54$9,963
Jun 20221841,679115.097.98$34,570
May 20221841,723109.378.43$34,654
Apr 202201,660104.226.84$11,350
Mar 202201,605108.885.08$8,148
Feb 20221851,57991.054.86$24,516
Jan 20221921,72681.844.54$23,545
Dec 202101,19571.323.90$4,659
Nov 20211801,45777.435.24$21,567
Oct 20211831,54079.795.71$23,401
Sep 202101,68369.865.35$9,006
Aug 20211781,73966.024.22$19,091
Jul 20211841,61770.783.98$19,463
Jun 202101,51669.493.38$5,125
May 20211851,76963.483.02$17,082
Apr 20211881,16660.362.76$14,564
Mar 202116258361.302.72$11,515
Feb 2021038357.805.55$2,125
Jan 202118947550.412.81$10,862
Dec 202018439844.642.68$9,279
Nov 2020070738.772.71$1,914
Oct 2020057936.972.48$1,435
Sep 2020187037.091.99$6,936
Aug 20200039.982.39$0
Jul 2020155038.371.83$5,947
Jun 202018464334.901.69$7,508
May 202001,07616.921.81$1,953
Apr 202018292314.751.80$4,350
Mar 2020080030.341.86$1,485
Feb 20201901,06049.881.98$11,577
Jan 20201941,11357.252.09$13,438
Dec 20191981,05759.012.30$14,120
Nov 201901,09255.302.75$3,004
Oct 20191831,23953.472.42$12,782
Sep 20191881,18155.052.66$13,488
Aug 201901,01653.112.30$2,341
Jul 20191861,39756.272.46$13,903
Jun 20191781,23652.782.49$12,474
May 20191901,02858.482.74$13,928
Apr 20191831,00962.632.75$14,237
Mar 2019074656.803.06$2,284
Feb 20191821,16150.852.79$12,496
Jan 201901,15846.033.23$3,738
Dec 20181711,17446.594.19$12,881
Nov 201816691952.934.24$12,680
Oct 20181221,50461.443.40$12,606
Sep 20181601,42659.543.11$13,958
Aug 20181851,38759.403.07$15,242
Jul 20181661,34265.142.93$14,748
Jun 201801,39860.183.08$4,302
May 20183451,55365.382.90$27,061
Apr 20181781,15163.842.90$14,702
Mar 20181781,73661.222.79$15,735
Feb 2018096061.782.77$2,655
Jan 20181761,25462.874.01$16,093
Dec 20171811,61157.272.92$15,072
Nov 20171821,81355.423.12$15,740
Oct 20171841,72249.292.98$14,207
Sep 20171751,78347.523.09$13,821
Aug 20171922,00145.373.00$14,723
Jul 20171793,76243.873.09$19,467
Jun 20171923,25842.493.09$18,216
May 20171814,37945.373.26$22,502
Apr 201703,30047.933.21$10,598
Mar 20171912,05446.772.98$15,062
Feb 20171901,75050.452.95$14,753
Jan 201718176649.413.42$11,562
Dec 201618699148.763.72$12,759
Nov 20161951,65442.492.64$12,659
Oct 20161832,04246.193.09$14,763
Sep 20161792,15041.553.10$14,104
Aug 20161692,31741.442.92$13,779
Jul 20161782,32541.622.92$14,207
Jun 20163612,29645.352.69$22,538
May 20161571,92442.521.99$10,506
Apr 20161821,47336.561.99$9,587
Mar 20161811,73533.011.79$9,087
Feb 20163561,65226.472.06$12,832
Jan 201619962827.352.36$6,927
Dec 20151928632.362.00$6,385
Nov 201517974338.792.17$8,554
Oct 20151801,68143.552.43$11,918
Sep 20153701,67142.992.76$20,516
Aug 201537186340.162.87$17,378
Jul 201505548.152.95$162
Jun 20153641256.152.88$20,473
May 2015087355.212.96$2,580
Apr 2015076049.822.71$2,057
Mar 201507542.892.93$220
Feb 20151861444.662.98$8,348
Jan 201509643.433.10$298
Dec 20142029754.693.59$11,396
Nov 2014187070.464.25$13,176
Oct 2014093978.303.90$3,663
Sep 20143695586.164.05$32,016
Aug 2014040489.394.04$1,630
Jul 201418189796.564.18$21,226
Jun 2014184398.164.74$18,076
May 201418412,75694.734.73$77,722
Apr 201418212,72295.944.81$78,643
Mar 201454416,04795.895.06$133,311
Feb 201418214,50297.406.19$107,523
Jan 201418615,10990.404.86$90,255
Dec 2013014,39491.824.35$62,678
Nov 201337013,48688.853.74$83,289
Oct 201355312,49097.423.78$101,077
Sep 2013012,076104.113.72$44,895
Aug 201318513,724104.253.52$67,631
Jul 20133611,825102.523.72$43,795
Jun 201335811,28394.403.93$78,176
May 201335914,51294.834.15$94,255
Apr 20133626,34093.964.28$61,165
Mar 20133532,13793.623.91$41,410
Feb 20133752,45491.233.42$42,604
Jan 20131821,56291.603.42$22,013
Dec 20121851,10486.773.42$19,828
Nov 20123411,31786.953.62$34,424
Oct 201218247289.383.40$17,872
Sep 201235471494.672.92$35,597
Aug 2012089892.662.91$2,612
Jul 201218188985.133.02$18,094
Jun 201254656079.822.52$44,992
May 201201,35391.612.49$3,367
Apr 201201,800101.652.00$3,594
Mar 20127233,260105.052.22$83,195
Feb 201201,720101.102.57$4,421
Jan 20123633,06198.092.73$43,976
Dec 20113563,10996.873.24$44,558
Nov 201103,27195.723.31$10,831
Oct 20117084,29484.983.65$75,833
Sep 20111803,99983.623.99$30,991
Aug 20115325,39883.404.15$66,767
Jul 20111784,50994.144.52$37,125
Jun 20115322,26492.904.64$59,927
May 201102,44398.134.40$10,761
Apr 20117142,227105.964.33$85,306
Mar 20111742,91396.364.06$28,586
Feb 20113612,86685.644.18$42,896
Jan 20113562,34186.504.59$41,536
Dec 201002,71385.734.35$11,795
Nov 20103602,45080.843.80$38,401
Oct 20105312,62478.103.51$50,678
Sep 20103552,79972.633.98$36,922
Aug 20103552,95773.684.42$39,224
Jul 20105373,14972.554.74$53,875
Jun 20103523,36370.364.91$41,280
May 20103593,59071.124.24$40,737
Apr 20103554,08481.694.12$45,837
Mar 20105354,14178.394.39$60,112
Feb 20105285,07573.585.44$66,470
Jan 20107156,36574.365.96$91,129
Dec 20097197,17271.445.48$90,695
Nov 20095404,51874.593.75$57,228
Oct 20095384,99272.544.11$59,545
Sep 20095396,35265.543.06$54,793
Aug 20097297,24267.423.22$72,458
Jul 20095536,87761.133.46$57,630
Jun 20097207,35366.163.90$76,275
May 20091,0768,74354.743.93$93,223
Apr 20099188,61246.773.59$73,830
Mar 20095669,11442.144.06$60,845
Feb 20091,09210,82032.814.63$85,958
Jan 20091,27511,34435.865.37$106,650
Dec 20081,6609,14437.105.98$116,241
Nov 20081,84414,16855.496.86$199,521
Oct 20082,50617,88975.246.92$312,379
Sep 20087449,651101.767.88$151,731

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Oil                    0 bbl  × $106.41 =         $0
Casinghead gas     1,743 Mcf  × $  3.05 =     $5,309

────────────────────────────────────────────────────
Month total                                   $5,309

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/O/7916 is the state's own key, not one this site invented.