JOHNSON -A-

Operated by BCE-MACH III LLC (P-5 40209) in the PANHANDLE GRAY COUNTY FIELD field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 8455District 10Field 68873001OilCasinghead gasSaveExport
Value, all time
$163 k
Mar 2008 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
219
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 837 leases and 6,360 wells, and the rule below applies to all of them.

Discovered
1921-12-31
as the register files it
Field class
Oil
the register's own label
Between wells
467 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 1989-05-01.

The Commission's schedule remark for this field reads: UNTIL THE FLUID MIGRATION FROM SUCH STRATA IS ELIMINATED.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition1,832 bbl$146,446
Casinghead gasProduction4,056 Mcf$16,860
Total$163,306

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.2497, -100.7793. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

35.24966, -100.77931 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
3,280 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,280 ft.

Completions filed
Mar 2008
1 of 1 wells

1 well

42-1793235123,280 ftMar 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (219)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

219 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 2023075172.852.39$1,797
Feb 2023070175.112.47$1,728
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 201912059.012.30$708
Nov 201904055.302.75$110
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 2019167058.482.74$9,766
Apr 20190062.632.75$0
Mar 201901356.803.06$40
Feb 201901050.852.79$28
Jan 201901246.033.23$39
Dec 201801246.594.19$50
Nov 201801152.934.24$47
Oct 201801261.443.40$41
Sep 20180959.543.11$28
Aug 201801059.403.07$31
Jul 201801065.142.93$29
Jun 201801160.183.08$34
May 201801065.382.90$29
Apr 201801063.842.90$29
Mar 201801061.222.79$28
Feb 20180861.782.77$22
Jan 201801162.874.01$44
Dec 201701057.272.92$29
Nov 201701055.423.12$31
Oct 201701049.292.98$30
Sep 201701447.523.09$43
Aug 201701145.373.00$33
Jul 201701043.873.09$31
Jun 20170942.493.09$28
May 201701045.373.26$33
Apr 201701147.933.21$35
Mar 201701146.772.98$33
Feb 201701250.452.95$35
Jan 201701149.413.42$38
Dec 201601248.763.72$45
Nov 20161711342.492.64$7,300
Oct 201601246.193.09$37
Sep 201602141.553.10$65
Aug 201602141.442.92$61
Jul 201602241.622.92$64
Jun 201602145.352.69$56
May 201602342.521.99$46
Apr 201602136.561.99$42
Mar 201602033.011.79$36
Feb 201602126.472.06$43
Jan 201602327.352.36$54
Dec 201502332.362.00$46
Nov 201502338.792.17$50
Oct 201502443.552.43$58
Sep 201502342.992.76$63
Aug 201501240.162.87$34
Jul 201501348.152.95$38
Jun 201501256.152.88$35
May 201501455.212.96$41
Apr 201501349.822.71$35
Mar 201501242.892.93$35
Feb 201501244.662.98$36
Jan 201501443.433.10$43
Dec 20141511454.693.59$8,308
Nov 201401170.464.25$47
Oct 201401078.303.90$39
Sep 201401086.164.05$40
Aug 201401089.394.04$40
Jul 20140696.564.18$25
Jun 20140998.164.74$43
May 201401094.734.73$47
Apr 20140995.944.81$43
Mar 201401095.895.06$51
Feb 20140997.406.19$56
Jan 20140990.404.86$44
Dec 20130991.824.35$39
Nov 201301088.853.74$37
Oct 201301197.423.78$42
Sep 2013013104.113.72$48
Aug 201315816104.253.52$16,528
Jul 2013013102.523.72$48
Jun 201301294.403.93$47
May 201301194.834.15$46
Apr 201301493.964.28$60
Mar 20130893.623.91$31
Feb 201301491.233.42$48
Jan 201301491.603.42$48
Dec 201201386.773.42$44
Nov 201201286.953.62$44
Oct 201201089.383.40$34
Sep 20120994.672.92$26
Aug 20120992.662.91$26
Jul 201201285.133.02$36
Jun 201201079.822.52$25
May 20120991.612.49$22
Apr 20121680101.652.00$17,077
Mar 201201105.052.22$2
Feb 2012013101.102.57$33
Jan 201201198.092.73$30
Dec 20110896.873.24$26
Nov 201101195.723.31$36
Oct 20110284.983.65$7
Sep 20110583.623.99$20
Aug 20110083.404.15$0
Jul 201103594.144.52$158
Jun 201103792.904.64$172
May 20110298.134.40$9
Apr 201101105.964.33$4
Mar 20110096.364.06$0
Feb 20110685.644.18$25
Jan 201103086.504.59$138
Dec 201004285.734.35$183
Nov 20101655080.843.80$13,528
Oct 201001178.103.51$39
Sep 20100072.633.98$0
Aug 201001573.684.42$66
Jul 201003472.554.74$161
Jun 20100370.364.91$15
May 201001571.124.24$64
Apr 201003981.694.12$161
Mar 201001878.394.39$79
Feb 20101664173.585.44$12,437
Jan 201003074.365.96$179
Dec 200904071.445.48$219
Nov 200904274.593.75$158
Oct 200902272.544.11$90
Sep 200901465.543.06$43
Aug 20090667.423.22$19
Jul 200904261.133.46$146
Jun 20091684966.163.90$11,306
May 200903954.743.93$153
Apr 200902146.773.59$75
Mar 200904642.144.06$187
Feb 200904132.814.63$190
Jan 200905635.865.37$301
Dec 200806237.105.98$371
Nov 20081694755.496.86$9,700
Oct 200805575.246.92$381
Sep 2008026101.767.88$205
Aug 2008043114.228.48$365
Jul 2008069131.0811.39$786
Jun 200817585131.3313.03$24,091
May 2008083123.1711.57$961
Apr 200816284110.3110.45$18,748
Mar 2008073101.909.66$705

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2023 — as filed, then multipliedworked
Oil                    0 bbl  × $ 72.85 =         $0
Casinghead gas       751 Mcf  × $  2.39 =     $1,797

────────────────────────────────────────────────────
Month total                                   $1,797

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/O/8455 is the state's own key, not one this site invented.