THOMPSON 75

Operated by SNW OPERATING COMPANY (P-5 799856) in the PANHANDLE (RED CAVE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 9295District 10Field 68825800OilSaveExport
Value, all time
$378 k
Jun 2015 – May 2026
Value, last 12 filed months
$64 k
at the published price for each month
Months reported
132
no gaps in the span
Streams
1
oil

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 114 leases and 1,481 wells, and the rule below applies to all of them.

Discovered
1960-10-11
as the register files it
Field class
Oil
the register's own label
Between wells
330 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 10 acres. The field rule took effect on 1985-04-15.

The Commission's schedule remark for this field reads: 10 ACRES UNITS W/DIAG OF 1100 AND ALLOW OF 53

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition7,037 bbl$378,109
Total$378,109

Wells on this lease (2)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.6394, -101.9523. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.8 miles.

35.63940, -101.95229 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 2 wells
With a plug date
0.0%
0 of 2 wells
Median depth
2,458 ft
2 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
2100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 2,384 and 2,531 ft, median 2,458 ft, over the 2 wells that filed a depth.

Completions filed
Dec 1971 – Oct 2015
2 of 2 wells

2 wells

42-3413336975142,531 ftOct 2015
42-3418159375012,384 ftDec 1971

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (132)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

132 months

May 20260106.413.05$0
Apr 202618498.932.87$18,203
Mar 2026089.753.15$0
Feb 2026063.503.75$0
Jan 202617959.138.00$10,584
Dec 2025056.664.41$0
Nov 202518758.593.93$10,956
Oct 2025059.383.30$0
Sep 2025062.743.08$0
Aug 2025063.933.01$0
Jul 202519066.743.32$12,681
Jun 202517666.483.13$11,700
May 2025060.553.23$0
Apr 2025062.363.54$0
Mar 2025067.704.27$0
Feb 2025070.884.34$0
Jan 2025074.324.28$0
Dec 2024068.993.12$0
Nov 202413269.052.20$9,115
Oct 2024071.372.28$0
Sep 2024069.612.36$0
Aug 2024075.632.06$0
Jul 2024079.932.15$0
Jun 2024078.082.63$0
May 2024078.812.20$0
Apr 2024084.451.66$0
Mar 2024080.301.55$0
Feb 2024076.091.78$0
Jan 2024073.023.30$0
Dec 2023071.262.61$0
Nov 2023077.892.81$0
Oct 2023085.443.09$0
Sep 2023089.042.74$0
Aug 2023080.522.67$0
Jul 2023074.852.64$0
Jun 2023068.962.26$0
May 2023070.622.23$0
Apr 2023078.122.24$0
Mar 2023072.852.39$0
Feb 2023075.112.47$0
Jan 2023076.533.39$0
Dec 202216476.415.73$12,531
Nov 2022085.005.65$0
Oct 2022087.185.86$0
Sep 2022084.888.16$0
Aug 2022094.529.13$0
Jul 2022162101.587.54$16,456
Jun 20220115.097.98$0
May 20220109.378.43$0
Apr 20220104.226.84$0
Mar 20220108.885.08$0
Feb 2022091.054.86$0
Jan 2022081.844.54$0
Dec 202116371.323.90$11,625
Nov 2021077.435.24$0
Oct 2021079.795.71$0
Sep 2021069.865.35$0
Aug 2021066.024.22$0
Jul 2021070.783.98$0
Jun 2021069.493.38$0
May 2021063.483.02$0
Apr 2021060.362.76$0
Mar 2021061.302.72$0
Feb 2021057.805.55$0
Jan 2021050.412.81$0
Dec 2020044.642.68$0
Nov 2020038.772.71$0
Oct 2020036.972.48$0
Sep 2020037.091.99$0
Aug 2020039.982.39$0
Jul 2020038.371.83$0
Jun 2020034.901.69$0
May 2020016.921.81$0
Apr 2020014.751.80$0
Mar 2020030.341.86$0
Feb 2020049.881.98$0
Jan 2020057.252.09$0
Dec 2019059.012.30$0
Nov 2019055.302.75$0
Oct 2019053.472.42$0
Sep 201916155.052.66$8,863
Aug 2019053.112.30$0
Jul 201916256.272.46$9,116
Jun 201910552.782.49$5,542
May 2019058.482.74$0
Apr 2019062.632.75$0
Mar 201917156.803.06$9,713
Feb 2019050.852.79$0
Jan 2019046.033.23$0
Dec 2018046.594.19$0
Nov 2018052.934.24$0
Oct 2018061.443.40$0
Sep 201815759.543.11$9,348
Aug 2018059.403.07$0
Jul 2018065.142.93$0
Jun 201813460.183.08$8,064
May 2018065.382.90$0
Apr 201813563.842.90$8,618
Mar 201830161.222.79$18,427
Feb 2018061.782.77$0
Jan 201814162.874.01$8,865
Dec 201716457.272.92$9,392
Nov 201711555.423.12$6,373
Oct 2017049.292.98$0
Sep 201712647.523.09$5,988
Aug 2017045.373.00$0
Jul 201714243.873.09$6,230
Jun 201729142.493.09$12,365
May 2017045.373.26$0
Apr 201711747.933.21$5,608
Mar 201718046.772.98$8,419
Feb 201728650.452.95$14,429
Jan 201727949.413.42$13,785
Dec 201610948.763.72$5,315
Nov 2016042.492.64$0
Oct 201629246.193.09$13,487
Sep 201613841.553.10$5,734
Aug 2016041.442.92$0
Jul 201612941.622.92$5,369
Jun 201632545.352.69$14,739
May 2016042.521.99$0
Apr 201616636.561.99$6,069
Mar 201633333.011.79$10,992
Feb 201614226.472.06$3,759
Jan 201616227.352.36$4,431
Dec 2015032.362.00$0
Nov 2015038.792.17$0
Oct 201515843.552.43$6,881
Sep 201513342.992.76$5,718
Aug 2015040.162.87$0
Jul 201514948.152.95$7,174
Jun 20159756.152.88$5,447

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Oil                  184 bbl  × $ 98.93 =    $18,203

────────────────────────────────────────────────────
Month total                                  $18,203

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/O/9295 is the state's own key, not one this site invented.