BIVINS 52-17 EAST

Operated by PRESIDIO PETROLEUM LLC (P-5 676084) in the AMARILLO, NORTH (CANYON LIME) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 9532District 10Field 02252500OilCasinghead gasSave
Value, all time
$25.2 M
May 2017 – May 2026
Value, last 12 filed months
$749 k
at the published price for each month
Months reported
109
no gaps in the span
Streams
2
oil, casinghead gas

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition423,302 bbl$23,677,936
Casinghead gasProduction489,354 Mcf$1,566,507
Total$25,244,443

Wells on this lease (2)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.3964, -101.7992. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.4 miles.

35.39643, -101.79923 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 2 wells
With a plug date
0.0%
0 of 2 wells
Median depth
7,095 ft
2 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
2100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 6,996 and 7,194 ft, median 7,095 ft, over the 2 wells that filed a depth.

Completions filed
May 2017 – Mar 2019
2 of 2 wells

2 wells

42-375318832H7,194 ftMar 2019
42-375318661H6,996 ftMay 2017

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (109)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

109 months

May 20266411,843106.413.05$73,822
Apr 202693142498.932.87$93,321
Mar 20267371,97789.753.15$72,372
Feb 20268481,32863.503.75$58,828
Jan 20265691,58259.138.00$46,298
Dec 20258492,19256.664.41$57,778
Nov 20257491,44258.593.93$49,546
Oct 20251,0041,56159.383.30$64,776
Sep 20258631,19062.743.08$57,806
Aug 20258141,16363.933.01$55,545
Jul 20257231,60466.743.32$53,571
Jun 20258971,70666.483.13$64,970
May 20258481,80060.553.23$57,165
Apr 20251,2831,70662.363.54$86,052
Mar 20257691,73667.704.27$59,471
Feb 20257611,55770.884.34$60,698
Jan 20251,1751,73374.324.28$94,741
Dec 20248981,80668.993.12$67,590
Nov 20249511,78669.052.20$69,593
Oct 202467668871.372.28$49,816
Sep 20241,1501,85769.612.36$84,442
Aug 20249221,88675.632.06$73,623
Jul 20241,1422,25579.932.15$96,121
Jun 20244691,37678.082.63$40,244
May 20241,4281,91878.812.20$116,757
Apr 20248701,96784.451.66$76,735
Mar 20241,0632,00680.301.55$88,458
Feb 20241,2501,94276.091.78$98,576
Jan 20241,0432,06073.023.30$82,953
Dec 20231,1622,06671.262.61$88,198
Nov 20231,1412,04877.892.81$94,622
Oct 20231,2522,40285.443.09$114,387
Sep 20231,3122,43889.042.74$123,489
Aug 20239622,45580.522.67$84,022
Jul 20231,4072,63874.852.64$112,283
Jun 20239471,58468.962.26$68,883
May 20231,1412,13670.622.23$85,335
Apr 20231,3101,91878.122.24$106,629
Mar 20231,4522,14572.852.39$110,912
Feb 20231,1261,91875.112.47$89,303
Jan 20231,6252,03376.533.39$131,248
Dec 20221,1452,55376.415.73$102,116
Nov 20221,5952,76885.005.65$151,204
Oct 20221,5202,91387.185.86$149,595
Sep 20221,5063,02584.888.16$152,524
Aug 20221,8673,29194.529.13$206,506
Jul 20221,6733,478101.587.54$196,175
Jun 20221,6952,991115.097.98$218,937
May 20221,6013,630109.378.43$205,713
Apr 20221,7933,322104.226.84$209,581
Mar 20222,0723,053108.885.08$241,098
Feb 20221,7762,64291.054.86$174,542
Jan 20222,4313,47981.844.54$214,740
Dec 20211,7243,25071.323.90$135,628
Nov 20212,1003,45977.435.24$180,717
Oct 20212,4123,66979.795.71$213,418
Sep 20211,8603,61069.865.35$149,256
Aug 20212,5464,08966.024.22$185,345
Jul 20212,3794,10570.783.98$184,732
Jun 20212,2783,74369.493.38$170,952
May 20212,7474,24463.483.02$187,187
Apr 20213,0034,36160.362.76$193,291
Mar 20213,4754,04861.302.72$224,016
Feb 20212,3253,80257.805.55$155,478
Jan 20213,6694,63450.412.81$197,977
Dec 20202,9554,30044.642.68$143,416
Nov 20202,8384,83738.772.71$123,121
Oct 20203,6825,19536.972.48$148,999
Sep 20203,6775,99337.091.99$148,312
Aug 20204,8976,48139.982.39$211,240
Jul 20204,0586,81838.371.83$168,149
Jun 20204,5696,71734.901.69$170,812
May 20204,4057,49016.921.81$88,125
Apr 20206,1917,31414.751.80$104,514
Mar 20206,5678,16830.341.86$214,404
Feb 20206,2287,47049.881.98$325,448
Jan 20206,7707,85357.252.09$404,032
Dec 20198,7199,26359.012.30$535,853
Nov 20199,7109,29955.302.75$562,542
Oct 201910,7949,66153.472.42$600,521
Sep 201910,9358,85755.052.66$625,507
Aug 201911,2408,12453.112.30$615,677
Jul 20198,8567,32556.272.46$516,347
Jun 201914,0228,86852.782.49$762,173
May 201917,1228,53458.482.74$1,024,680
Apr 201913,1386,61662.632.75$841,032
Mar 20192,6741,30856.803.06$155,888
Feb 20191,3633,62850.852.79$79,439
Jan 20192,6334,98246.033.23$137,280
Dec 20182,6195,62246.594.19$145,550
Nov 20183,3966,22352.934.24$206,119
Oct 20182,6005,66761.443.40$179,001
Sep 20183,7437,20059.543.11$245,236
Aug 20184,0548,02259.403.07$265,408
Jul 20182,9646,56765.142.93$212,329
Jun 20183,7308,33260.183.08$250,108
May 20184,6818,33965.382.90$330,234
Apr 20184,6697,52463.842.90$319,895
Mar 20186,1748,39961.222.79$401,379
Feb 20184,3185,38261.782.77$281,653
Jan 20186,9807,72662.874.01$469,809
Dec 20178,27611,66757.272.92$508,052
Nov 20179,88113,47155.423.12$589,612
Oct 201712,12211,67449.292.98$632,325
Sep 201714,08311,98047.523.09$706,210
Aug 201719,60314,54145.373.00$933,075
Jul 201715,7635,85843.873.09$709,608
Jun 201719,7867,06542.493.09$862,519
May 201713,4654,96345.373.26$627,103

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Oil                  641 bbl  × $106.41 =    $68,209
Casinghead gas     1,843 Mcf  × $  3.05 =     $5,613

────────────────────────────────────────────────────
Month total                                  $73,822

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/O/9532 is the state's own key, not one this site invented.