KREEK MCCRAE 1

Operated by HADAWAY CONSULT AND ENGINEER,LLC (P-5 342392) in the LARD RANCH (GRANITE WASH -C-) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 9826District 10Field 52019750OilCasinghead gasSave
Value, all time
$9.4 M
Jun 2023 – May 2026
Value, last 12 filed months
$1.1 M
at the published price for each month
Months reported
36
no gaps in the span
Streams
2
oil, casinghead gas

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition109,548 bbl$8,271,223
Casinghead gasProduction391,220 Mcf$1,124,232
Total$9,395,455

Wells on this lease (2)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 35.9420, -100.8080. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.4 miles.

35.94196, -100.80797 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 2 wells
With a plug date
0.0%
0 of 2 wells
Median depth
8,463 ft
2 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
2100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 8,445 and 8,480 ft, median 8,463 ft, over the 2 wells that filed a depth.

Completions filed
Oct 2023
2 of 2 wells

2 wells

42-393327732H8,445 ftOct 2023
42-393327721H8,480 ftOct 2023

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (36)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

36 months

May 20261,3217,989106.413.05$164,901
Apr 20267525,28498.932.87$89,559
Mar 20269505,63289.753.15$103,000
Feb 20267506,74563.503.75$72,921
Jan 20261,3037,99459.138.00$140,982
Dec 20257488,63756.664.41$80,500
Nov 20257315,51658.593.93$64,488
Oct 20259435,55159.383.30$74,341
Sep 20257646,00762.743.08$66,416
Aug 20251,1386,65163.933.01$92,804
Jul 20257727,89666.743.32$77,700
Jun 20257526,46966.483.13$70,233
May 20251,6946,57760.553.23$123,831
Apr 20251,2997,74362.363.54$108,440
Mar 20251,1188,31367.704.27$111,171
Feb 20251,5198,27370.884.34$143,578
Jan 20252,0389,01374.324.28$190,028
Dec 20241,7449,84968.993.12$151,061
Nov 20241,7469,03769.052.20$140,429
Oct 20241,6999,49571.372.28$142,920
Sep 20242,2238,98169.612.36$175,977
Aug 20242,38610,71775.632.06$202,569
Jul 20242,85712,55579.932.15$255,310
Jun 20243,06712,52178.082.63$272,451
May 20243,78915,84078.812.20$333,434
Apr 20244,58318,12984.451.66$417,114
Mar 20246,07923,02080.301.55$523,713
Feb 20247,07026,21976.091.78$584,722
Jan 202410,70234,74973.023.30$896,050
Dec 202315,30039,57771.262.61$1,193,602
Nov 202320,10031,80877.892.81$1,654,892
Oct 20237,6118,43385.443.09$676,319
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Oil                1,321 bbl  × $106.41 =   $140,568
Casinghead gas     7,989 Mcf  × $  3.05 =    $24,333

────────────────────────────────────────────────────
Month total                                 $164,901

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 10/O/9826 is the state's own key, not one this site invented.