WHITTINGTON "B"

Operated by ARABIE, INC. (P-5 28678) in the GLEN COVE, E. (CAPPS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 100999District 7BField 35274150NGPA filingCondensateGasSaveExport
Value, all time
$193 k
Jan 1993 – Nov 2021
Value, last 12 filed months
$0
at the published price for each month
Months reported
347
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2 leases and 2 wells, and the rule below applies to all of them.

Discovered
1981-10-29
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition17 bbl$685
GasProduction45,267 Mcf$191,943
Total$192,627

7,102 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.8531, -99.6047. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.85315, -99.60470 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
3,500 ft
1 wells filed one
Completion to plug
39.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,500 ft.

Completions filed
Jul 1982
1 of 1 wells
Plug dates filed
Nov 2021
1 of 1 wells

Last completion to plug: a median of 39.3 years across the 1 well that filed both dates, with the middle half between 39.3 years and 39.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-0833306433,500 ftJul 1982Nov 2021Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (347)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

347 months

Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 201708557.272.92$248
Nov 201707855.423.12$243
Oct 201707649.292.98$227
Sep 201707047.523.09$216
Aug 201706245.373.00$186
Jul 201702543.873.09$77
Jun 201705642.493.09$173
May 201706345.373.26$206
Apr 201706047.933.21$193
Mar 201708446.772.98$251
Feb 201705950.452.95$174
Jan 201708249.413.42$280
Dec 201608048.763.72$298
Nov 201608142.492.64$214
Oct 201608446.193.09$260
Sep 201608241.553.10$254
Aug 201608441.442.92$246
Jul 201608541.622.92$249
Jun 201658245.352.69$447
May 201658542.521.99$382
Apr 201647836.561.99$302
Mar 201638333.011.79$248
Feb 201608026.472.06$165
Jan 201608527.352.36$201
Dec 201508532.362.00$170
Nov 201508238.792.17$178
Oct 201508543.552.43$206
Sep 201508342.992.76$229
Aug 201508640.162.87$247
Jul 201508648.152.95$253
Jun 201508356.152.88$239
May 201508655.212.96$254
Apr 201508349.822.71$225
Mar 201508642.892.93$252
Feb 201507844.662.98$232
Jan 201507243.433.10$223
Dec 201408454.693.59$302
Nov 201408470.464.25$357
Oct 201408478.303.90$328
Sep 201407486.164.05$299
Aug 201408389.394.04$335
Jul 201408696.564.18$359
Jun 201408198.164.74$384
May 201408794.734.73$411
Apr 201408495.944.81$404
Mar 201408695.895.06$435
Feb 201407897.406.19$483
Jan 201408090.404.86$389
Dec 201306791.824.35$292
Nov 201308288.853.74$307
Oct 201308697.423.78$325
Sep 2013084104.113.72$312
Aug 2013087104.253.52$306
Jul 2013087102.523.72$323
Jun 201308494.403.93$330
May 201308894.834.15$365
Apr 201308593.964.28$364
Mar 201308793.623.91$340
Feb 201307991.233.42$270
Jan 201308891.603.42$301
Dec 201208986.773.42$304
Nov 201208486.953.62$305
Oct 201207689.383.40$258
Sep 201207994.672.92$231
Aug 201208592.662.91$247
Jul 201208785.133.02$263
Jun 201208479.822.52$212
May 201208691.612.49$214
Apr 2012092101.652.00$184
Mar 2012099105.052.22$220
Feb 2012081101.102.57$208
Jan 201208698.092.73$235
Dec 201108796.873.24$282
Nov 201108395.723.31$275
Oct 201108584.983.65$310
Sep 201108183.623.99$323
Aug 201108683.404.15$357
Jul 201108694.144.52$388
Jun 201108492.904.64$390
May 201108698.134.40$379
Apr 2011084105.964.33$364
Mar 201108796.364.06$353
Feb 201107885.644.18$326
Jan 201108686.504.59$395
Dec 201008685.734.35$374
Nov 201008480.843.80$319
Oct 201008778.103.51$305
Sep 201009072.633.98$358
Aug 201009373.684.42$411
Jul 2010021872.554.74$1,033
Jun 2010016170.364.91$791
May 2010022971.124.24$970
Apr 2010021881.694.12$899
Mar 2010022878.394.39$1,001
Feb 2010020473.585.44$1,110
Jan 2010022774.365.96$1,354
Dec 2009022171.445.48$1,212
Nov 2009022574.593.75$844
Oct 2009012672.544.11$518
Sep 2009019065.543.06$582
Aug 2009024367.423.22$782
Jul 2009024361.133.46$842
Jun 2009023966.163.90$931
May 2009024154.743.93$946
Apr 2009023646.773.59$847
Mar 2009024242.144.06$982
Feb 2009011432.814.63$528
Jan 2009012635.865.37$677
Dec 2008024637.105.98$1,470
Nov 2008023555.496.86$1,612
Oct 2008018575.246.92$1,281
Sep 20080237101.767.88$1,867
Aug 20080243114.228.48$2,061
Jul 20080249131.0811.39$2,836
Jun 20080242131.3313.03$3,154
May 20080241123.1711.57$2,789
Apr 20080242110.3110.45$2,530
Mar 20080257101.909.66$2,484
Feb 2008022192.538.77$1,938
Jan 2008021590.388.21$1,764
Dec 200709588.337.30$694
Nov 2007018491.677.29$1,342
Oct 2007019482.856.92$1,343
Sep 2007020275.846.24$1,261
Aug 2007013869.066.39$882
Jul 2007022070.906.39$1,405
Jun 2007021062.007.55$1,585
May 2007023458.747.85$1,836
Apr 2007024859.617.81$1,936
Mar 2007022356.927.30$1,628
Feb 2007020255.108.22$1,660
Jan 2007024850.306.73$1,668
Dec 2006025856.656.92$1,785
Nov 2006018154.207.62$1,379
Oct 2006017454.906.01$1,046
Sep 2006024260.085.04$1,219
Aug 2006028168.717.34$2,063
Jul 2006025469.376.34$1,611
Jun 2006025266.286.38$1,609
May 2006024866.016.42$1,593
Apr 2006025264.397.36$1,855
Mar 2006021756.707.08$1,537
Feb 2006021957.597.75$1,698
Jan 2006024860.598.93$2,215
Dec 2005025354.9413.42$3,394
Nov 2005028554.6910.59$3,018
Oct 2005014658.3413.80$2,014
Sep 200508161.4512.08$978
Aug 2005021561.519.80$2,106
Jul 2005022855.697.84$1,788
Jun 2005025252.337.38$1,860
May 2005027645.226.65$1,836
Apr 2005026949.207.36$1,980
Mar 2005021150.377.15$1,510
Feb 2005022445.226.31$1,414
Jan 2005029743.166.32$1,878
Dec 2004021839.866.75$1,472
Nov 2004025845.286.33$1,633
Oct 2004028949.706.52$1,883
Sep 2004024043.245.28$1,268
Aug 2004010142.375.55$561
Jul 2004010138.286.08$615
Jun 2004019236.106.43$1,235
May 2004028937.486.49$1,877
Apr 2004028034.475.86$1,640
Mar 2004011834.365.53$653
Feb 2004014132.455.51$777
Jan 2004014132.036.30$888
Dec 2003014830.266.30$933
Nov 2003015028.804.60$689
Oct 2003016528.174.76$785
Sep 20030026.314.75$0
Aug 2003016429.765.13$841
Jul 2003017729.415.17$915
Jun 2003020028.565.98$1,197
May 2003017926.595.97$1,069
Apr 2003018626.675.41$1,006
Mar 2003018331.146.10$1,116
Feb 2003018633.487.93$1,474
Jan 2003018730.315.58$1,044
Dec 2002018526.914.85$898
Nov 2002018524.664.14$765
Oct 2002018226.464.23$770
Sep 2002018027.443.64$654
Aug 2002017925.963.16$566
Jul 2002018624.583.06$569
Jun 2002018023.733.34$601
May 2002018324.663.58$656
Apr 2002018523.653.51$650
Mar 2002018022.003.10$558
Feb 2002018118.222.38$430
Jan 2002018117.172.38$430
Dec 2001018116.932.36$428
Nov 2001017418.072.41$419
Oct 2001017019.782.53$430
Sep 2001018224.262.25$410
Aug 2001017924.873.05$547
Jul 2001017623.933.20$563
Jun 2001017924.563.82$685
May 2001017125.524.31$737
Apr 2001017024.685.34$907
Mar 2001017124.545.38$919
Feb 2001017527.755.77$1,009
Jan 2001017227.478.40$1,445
Dec 2000017126.889.12$1,560
Nov 2000017132.215.66$968
Oct 2000016931.235.15$870
Sep 2000017831.875.19$923
Aug 2000017629.644.54$799
Jul 2000017928.534.09$732
Jun 2000017929.304.40$787
May 2000016927.263.68$622
Apr 2000018024.513.12$561
Mar 2000018028.422.86$515
Feb 2000018027.622.73$491
Jan 2000017825.272.48$442
Dec 1999018224.282.42$441
Nov 1999017923.192.43$436
Oct 1999017920.982.80$502
Sep 1999018521.752.62$484
Aug 1999017819.262.88$512
Jul 1999018817.892.37$446
Jun 19990015.942.36$0
May 1999017215.792.32$399
Apr 1999017215.102.21$380
Mar 1999018012.471.84$331
Feb 199901759.981.82$318
Jan 1999012410.381.90$236
Dec 19980669.201.77$117
Nov 1998014410.892.19$315
Oct 1998020212.421.97$398
Sep 1998013512.592.08$281
Aug 1998015811.301.91$301
Jul 1998016511.742.24$369
Jun 1998017211.242.24$385
May 1998025412.622.21$560
Apr 1998017213.042.51$431
Mar 1998015712.802.31$363
Feb 1998010513.952.30$241
Jan 1998013514.702.15$291
Dec 1997012416.322.41$299
Nov 1997012418.193.09$383
Oct 1997013919.253.15$438
Sep 1997013817.742.95$408
Aug 1997015117.862.55$386
Jul 1997015417.582.25$346
Jun 1997015017.242.26$339
May 1997015018.972.31$346
Apr 1997015217.882.08$317
Mar 1997018618.951.94$361
Feb 1997012320.492.21$271
Jan 1997014023.483.54$496
Dec 1996013323.32$0
Nov 1996013621.97$0
Oct 1996014123.31$0
Sep 1996014022.22$0
Aug 1996014520.26$0
Jul 1996013919.55$0
Jun 1996013818.73$0
May 1996014119.43$0
Apr 1996014321.51$0
Mar 1996013119.38$0
Feb 1996012816.98$0
Jan 1996013317.07$0
Dec 1995014217.19$0
Nov 1995014316.00$0
Oct 1995015315.43$0
Sep 1995015116.18$0
Aug 1995015515.92$0
Jul 1995015715.24$0
Jun 1995015016.41$0
May 1995015117.56$0
Apr 1995014417.73$0
Mar 1995014716.44$0
Feb 1995013016.58$0
Jan 1995013815.92$0
Dec 1994014115.03$0
Nov 1994014015.90$0
Oct 1994020015.58$0
Sep 1994014015.29$0
Aug 1994015616.13$0
Jul 1994016117.56$0
Jun 1994015717.09$0
May 1994016915.88$0
Apr 1994015714.14$0
Mar 1994016112.46$0
Feb 1994013712.50$0
Jan 1994014912.66$0
Dec 1993014512.33$0
Nov 1993014014.49$0
Oct 1993014915.85$0
Sep 1993015815.03$0
Aug 1993017015.66$0
Jul 1993016215.46$0
Jun 1993015816.79$0
May 1993016117.68$0
Apr 1993014318.05$0
Mar 1993015318.14$0
Feb 1993013817.90$0
Jan 1993014816.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2017 — as filed, then multipliedworked
Condensate             0 bbl  × $ 57.27 =         $0
Gas                   85 Mcf  × $  2.92 =       $248

────────────────────────────────────────────────────
Month total                                     $248

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/100999 is the state's own key, not one this site invented.