SNYDER MINERAL TRUST "143"

Operated by L.C.S. PRODUCTION COMPANY (P-5 479574) in the SMT (STRAWN) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 108088District 7BField 79310800NGPA filingGasSaveExport
Value, all time
$3 k
Jan 1993 – Dec 2001
Value, last 12 filed months
$0
at the published price for each month
Months reported
108
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1 leases and 1 wells, and the rule below applies to all of them.

Discovered
1983-06-22
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction4,022 Mcf$2,667
Total$2,667

2,927 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.4435, -99.3391. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.44347, -99.33909 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,505 ft
1 wells filed one
Completion to plug
18.5 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,505 ft.

Completions filed
Jun 1983
1 of 1 wells
Plug dates filed
Dec 2001
1 of 1 wells

Last completion to plug: a median of 18.5 years across the 1 well that filed both dates, with the middle half between 18.5 years and 18.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-0593423524,505 ftJun 1983Dec 2001Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (108)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

108 months

Dec 2001016.932.36$0
Nov 2001018.072.41$0
Oct 2001019.782.53$0
Sep 2001024.262.25$0
Aug 2001024.873.05$0
Jul 2001023.933.20$0
Jun 2001024.563.82$0
May 2001025.524.31$0
Apr 2001024.685.34$0
Mar 2001024.545.38$0
Feb 2001027.755.77$0
Jan 2001027.478.40$0
Dec 2000026.889.12$0
Nov 2000032.215.66$0
Oct 2000031.235.15$0
Sep 2000031.875.19$0
Aug 2000029.644.54$0
Jul 2000028.534.09$0
Jun 2000029.304.40$0
May 2000027.263.68$0
Apr 2000024.513.12$0
Mar 2000028.422.86$0
Feb 2000027.622.73$0
Jan 2000025.272.48$0
Dec 1999024.282.42$0
Nov 1999023.192.43$0
Oct 1999020.982.80$0
Sep 1999021.752.62$0
Aug 1999019.262.88$0
Jul 1999417.892.37$9
Jun 1999015.942.36$0
May 1999115.792.32$2
Apr 1999815.102.21$18
Mar 1999212.471.84$4
Feb 1999239.981.82$42
Jan 19992510.381.90$48
Dec 1998249.201.77$43
Nov 19982310.892.19$50
Oct 19982612.421.97$51
Sep 19982712.592.08$56
Aug 1998911.301.91$17
Jul 19983611.742.24$81
Jun 19981311.242.24$29
May 19983012.622.21$66
Apr 19987913.042.51$198
Mar 19988112.802.31$187
Feb 19987313.952.30$168
Jan 19987614.702.15$164
Dec 19974716.322.41$113
Nov 19977318.193.09$225
Oct 19976519.253.15$205
Sep 19975417.742.95$160
Aug 19973417.862.55$87
Jul 19974517.582.25$101
Jun 19974617.242.26$104
May 19973118.972.31$72
Apr 19972817.882.08$58
Mar 19972918.951.94$56
Feb 19973020.492.21$66
Jan 19975323.483.54$188
Dec 19964223.32$0
Nov 19963921.97$0
Oct 19963723.31$0
Sep 19963622.22$0
Aug 19964320.26$0
Jul 19963719.55$0
Jun 19965018.73$0
May 19964019.43$0
Apr 19964421.51$0
Mar 1996419.38$0
Feb 1996416.98$0
Jan 19962617.07$0
Dec 19955517.19$0
Nov 19955916.00$0
Oct 19957915.43$0
Sep 19955716.18$0
Aug 19956815.92$0
Jul 19956115.24$0
Jun 19955916.41$0
May 19952817.56$0
Apr 19954117.73$0
Mar 19955716.44$0
Feb 19955716.58$0
Jan 19955115.92$0
Dec 19945115.03$0
Nov 19945515.90$0
Oct 19945615.58$0
Sep 19943115.29$0
Aug 19945016.13$0
Jul 19942017.56$0
Jun 19945917.09$0
May 19946015.88$0
Apr 19945014.14$0
Mar 19945512.46$0
Feb 19946112.50$0
Jan 19945412.66$0
Dec 19936512.33$0
Nov 19936114.49$0
Oct 19937615.85$0
Sep 19937815.03$0
Aug 199312015.66$0
Jul 199316415.46$0
Jun 199319216.79$0
May 199317217.68$0
Apr 199310418.05$0
Mar 19938518.14$0
Feb 19935217.90$0
Jan 19938216.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 1999 — as filed, then multipliedworked
Gas                    4 Mcf  × $  2.37 =         $9

────────────────────────────────────────────────────
Month total                                       $9

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/108088 is the state's own key, not one this site invented.