HOLLIFIELD

Operated by WATSON OIL & GAS, INC. (P-5 901174) in the MITTIE (MARBLE FALLS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 117411District 7BField 62229666Hydrogen sulphide fieldNGPA filingCondensateGasSaveExport
Value, all time
$113 k
Jan 1993 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 134 leases and 152 wells, and the rule below applies to all of them.

Discovered
1978-03-05
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: OPT ACREAGE 160 PLUT 10 TOL W/4500' DIAG/LAST WELL 20 AC

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition519 bbl$18,808
GasProduction25,247 Mcf$94,208
Total$113,016

4,465 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.1978, -98.6880. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.19782, -98.68795 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
3,143 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,143 ft.

Completions filed
Jun 1985
1 of 1 wells

1 well

42-1333304513,143 ftJun 1985

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 202401869.052.20$40
Oct 20240071.372.28$0
Sep 202402769.612.36$64
Aug 2024574175.632.06$4,396
Jul 202401979.932.15$41
Jun 202403878.082.63$100
May 202403978.812.20$86
Apr 202405284.451.66$86
Mar 202405380.301.55$82
Feb 202405376.091.78$95
Jan 202401673.023.30$53
Dec 202303571.262.61$91
Nov 202303877.892.81$107
Oct 202303485.443.09$105
Sep 202303589.042.74$96
Aug 202303380.522.67$88
Jul 202303474.852.64$90
Jun 202303268.962.26$72
May 202303270.622.23$71
Apr 202303778.122.24$83
Mar 202303572.852.39$84
Feb 202303475.112.47$84
Jan 202302876.533.39$95
Dec 202203076.415.73$172
Nov 202203985.005.65$220
Oct 202203787.185.86$217
Sep 202202784.888.16$220
Aug 202202994.529.13$265
Jul 2022031101.587.54$234
Jun 2022027115.097.98$215
May 2022030109.378.43$253
Apr 2022033104.226.84$226
Mar 2022043108.885.08$218
Feb 202203291.054.86$155
Jan 202201881.844.54$82
Dec 202105771.323.90$222
Nov 202103977.435.24$204
Oct 202103179.795.71$177
Sep 202103269.865.35$171
Aug 202103566.024.22$148
Jul 202104170.783.98$163
Jun 202104869.493.38$162
May 202103763.483.02$112
Apr 202104660.362.76$127
Mar 202105161.302.72$139
Feb 202103557.805.55$194
Jan 202104050.412.81$112
Dec 202004444.642.68$118
Nov 202005138.772.71$138
Oct 202004736.972.48$116
Sep 202005137.091.99$102
Aug 202004639.982.39$110
Jul 202003838.371.83$69
Jun 202004334.901.69$73
May 202004616.921.81$83
Apr 202004514.751.80$81
Mar 202005430.341.86$100
Feb 202005649.881.98$111
Jan 202005757.252.09$119
Dec 201906759.012.30$154
Nov 201906655.302.75$182
Oct 201907253.472.42$174
Sep 2019013955.052.66$369
Aug 201902953.112.30$67
Jul 201903956.272.46$96
Jun 201904152.782.49$102
May 201905458.482.74$148
Apr 201907162.632.75$195
Mar 201905756.803.06$175
Feb 201908150.852.79$226
Jan 201905946.033.23$190
Dec 201806146.594.19$255
Nov 201806352.934.24$267
Oct 201806861.443.40$231
Sep 201805959.543.11$183
Aug 201807159.403.07$218
Jul 201806465.142.93$188
Jun 201807660.183.08$234
May 201808465.382.90$244
Apr 201808063.842.90$232
Mar 201807761.222.79$215
Feb 201806261.782.77$172
Jan 201804362.874.01$172
Dec 20170657.272.92$18
Nov 201705055.423.12$156
Oct 201707849.292.98$233
Sep 2017634547.523.09$3,133
Aug 201704845.373.00$144
Jul 201703643.873.09$111
Jun 20170042.493.09$0
May 201702145.373.26$69
Apr 201701547.933.21$48
Mar 20170046.772.98$0
Feb 201702050.452.95$59
Jan 201703549.413.42$120
Dec 201602548.763.72$93
Nov 201604542.492.64$119
Oct 201604246.193.09$130
Sep 201606241.553.10$192
Aug 201604541.442.92$132
Jul 20160141.622.92$3
Jun 20160145.352.69$3
May 20160142.521.99$2
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 201604126.472.06$85
Jan 201605427.352.36$128
Dec 201505132.362.00$102
Nov 201503938.792.17$85
Oct 20150143.552.43$2
Sep 201504542.992.76$124
Aug 201505440.162.87$155
Jul 201506448.152.95$188
Jun 201506356.152.88$182
May 201505155.212.96$151
Apr 201503249.822.71$87
Mar 201505342.892.93$156
Feb 201505044.662.98$149
Jan 201505843.433.10$180
Dec 201406854.693.59$244
Nov 201403670.464.25$153
Oct 201407378.303.90$285
Sep 201405786.164.05$231
Aug 201404889.394.04$194
Jul 201402396.564.18$96
Jun 201405498.164.74$256
May 201406094.734.73$284
Apr 201406395.944.81$303
Mar 201406595.895.06$329
Feb 201405897.406.19$359
Jan 201406290.404.86$301
Dec 20130091.824.35$0
Nov 201306588.853.74$243
Oct 201306397.423.78$238
Sep 2013048104.113.72$178
Aug 2013062104.253.52$218
Jul 2013048102.523.72$178
Jun 201306994.403.93$271
May 201307094.834.15$290
Apr 201306993.964.28$296
Mar 201308093.623.91$313
Feb 201304291.233.42$144
Jan 201307791.603.42$263
Dec 201205986.773.42$202
Nov 201207386.953.62$265
Oct 201207889.383.40$265
Sep 201206494.672.92$187
Aug 201207092.662.91$204
Jul 201206885.133.02$205
Jun 201207379.822.52$184
May 201209291.612.49$229
Apr 20120106101.652.00$212
Mar 2012067105.052.22$149
Feb 2012061101.102.57$157
Jan 201208498.092.73$230
Dec 201106996.873.24$224
Nov 201106495.723.31$212
Oct 201108284.983.65$299
Sep 201107583.623.99$299
Aug 201105683.404.15$232
Jul 201106594.144.52$294
Jun 201105192.904.64$237
May 201107398.134.40$322
Apr 2011069105.964.33$299
Mar 201106996.364.06$280
Feb 2011013685.644.18$568
Jan 201109486.504.59$431
Dec 201005885.734.35$252
Nov 2010011580.843.80$436
Oct 201007678.103.51$267
Sep 201006772.633.98$267
Aug 201007873.684.42$345
Jul 201008172.554.74$384
Jun 201007070.364.91$344
May 201008271.124.24$347
Apr 201007481.694.12$305
Mar 201007878.394.39$342
Feb 201007073.585.44$381
Jan 201006874.365.96$406
Dec 200907771.445.48$422
Nov 2009597674.593.75$4,686
Oct 200907272.544.11$296
Sep 200907665.543.06$233
Aug 200909167.423.22$293
Jul 200909761.133.46$336
Jun 200907666.163.90$296
May 2009011054.743.93$432
Apr 20090046.773.59$0
Mar 200908042.144.06$325
Feb 200909032.814.63$417
Jan 200909435.865.37$505
Dec 200809737.105.98$580
Nov 2008010755.496.86$734
Oct 200806875.246.92$471
Sep 2008060101.767.88$473
Aug 2008091114.228.48$772
Jul 20080103131.0811.39$1,173
Jun 2008095131.3313.03$1,238
May 20080106123.1711.57$1,227
Apr 20080100110.3110.45$1,045
Mar 20080106101.909.66$1,024
Feb 2008011092.538.77$965
Jan 2008010390.388.21$845
Dec 200706288.337.30$453
Nov 200705891.677.29$423
Oct 200709982.856.92$685
Sep 200708475.846.24$525
Aug 200709669.066.39$613
Jul 200708970.906.39$569
Jun 200705262.007.55$393
May 200705558.747.85$432
Apr 200705059.617.81$390
Mar 200705356.927.30$387
Feb 200704155.108.22$337
Jan 200706750.306.73$451
Dec 200606356.656.92$436
Nov 200608654.207.62$655
Oct 200608854.906.01$529
Sep 200605860.085.04$292
Aug 200607768.717.34$565
Jul 200608969.376.34$565
Jun 200609566.286.38$606
May 200608066.016.42$514
Apr 200608564.397.36$626
Mar 200608756.707.08$616
Feb 200606857.597.75$527
Jan 2006010160.598.93$902
Dec 2005012154.9413.42$1,623
Nov 200509454.6910.59$995
Oct 200506458.3413.80$883
Sep 200507061.4512.08$846
Aug 2005010461.519.80$1,019
Jul 200509355.697.84$729
Jun 2005011152.337.38$819
May 2005016345.226.65$1,084
Apr 200505049.207.36$368
Mar 200508750.377.15$622
Feb 200505545.226.31$347
Jan 200506043.166.32$379
Dec 200406539.866.75$439
Nov 2004010345.286.33$652
Oct 2004010449.706.52$678
Sep 200405543.245.28$291
Aug 200407242.375.55$400
Jul 200407338.286.08$444
Jun 200403036.106.43$193
May 200402537.486.49$162
Apr 2004844634.475.86$3,165
Mar 200405734.365.53$315
Feb 200405932.455.51$325
Jan 200406032.036.30$378
Dec 2003011630.266.30$731
Nov 2003011228.804.60$515
Oct 2003012828.174.76$609
Sep 200309426.314.75$446
Aug 2003011329.765.13$580
Jul 200306529.415.17$336
Jun 200306728.565.98$401
May 200309826.595.97$585
Apr 2003014026.675.41$757
Mar 200309631.146.10$585
Feb 200305433.487.93$428
Jan 200305130.315.58$285
Dec 200202726.914.85$131
Nov 200202324.664.14$95
Oct 200206526.464.23$275
Sep 200205827.443.64$211
Aug 200202425.963.16$76
Jul 200203124.583.06$95
Jun 2002010023.733.34$334
May 200207024.663.58$251
Apr 200208123.653.51$285
Mar 200205522.003.10$171
Feb 200205518.222.38$131
Jan 200205417.172.38$128
Dec 200105616.932.36$132
Nov 20010918.072.41$22
Oct 200102219.782.53$56
Sep 200104724.262.25$106
Aug 200105124.873.05$156
Jul 200105423.933.20$173
Jun 200107424.563.82$283
May 200107525.524.31$323
Apr 200108524.685.34$454
Mar 200107724.545.38$414
Feb 200105727.755.77$329
Jan 200107327.478.40$613
Dec 200008626.889.12$785
Nov 200008232.215.66$464
Oct 200006131.235.15$314
Sep 200004531.875.19$233
Aug 200005929.644.54$268
Jul 200006528.534.09$266
Jun 200005829.304.40$255
May 200006627.263.68$243
Apr 200006824.513.12$212
Mar 200007028.422.86$200
Feb 200007127.622.73$194
Jan 200004525.272.48$112
Dec 199906424.282.42$155
Nov 199906723.192.43$163
Oct 199908820.982.80$247
Sep 199908021.752.62$210
Aug 199905519.262.88$158
Jul 199906017.892.37$142
Jun 199907115.942.36$168
May 1999608615.792.32$1,147
Apr 199908515.102.21$188
Mar 199905012.471.84$92
Feb 199955769.981.82$687
Jan 199908610.381.90$163
Dec 19980849.201.77$149
Nov 199808410.892.19$184
Oct 199809212.421.97$181
Sep 199808512.592.08$177
Aug 199808611.301.91$164
Jul 199809111.742.24$204
Jun 199807211.242.24$161
May 199807312.622.21$161
Apr 199806713.042.51$168
Mar 199807512.802.31$173
Feb 199807613.952.30$175
Jan 199807414.702.15$159
Dec 199704716.322.41$113
Nov 199706818.193.09$210
Oct 199707419.253.15$233
Sep 199708217.742.95$242
Aug 199708617.862.55$220
Jul 199708917.582.25$200
Jun 199708317.242.26$187
May 199708618.972.31$199
Apr 199708517.882.08$177
Mar 199708918.951.94$173
Feb 199707720.492.21$170
Jan 199706823.483.54$241
Dec 199609423.32$0
Nov 199608021.97$0
Oct 1996438223.31$1,002
Sep 199606622.22$0
Aug 199607720.26$0
Jul 199607919.55$0
Jun 199608318.73$0
May 199608919.43$0
Apr 199608821.51$0
Mar 199608919.38$0
Feb 199608516.98$0
Jan 199608917.07$0
Dec 199509217.19$0
Nov 199509216.00$0
Oct 199508915.43$0
Sep 199509816.18$0
Aug 199508415.92$0
Jul 1995010815.24$0
Jun 199506616.41$0
May 199504417.56$0
Apr 199509517.73$0
Mar 199509916.44$0
Feb 199509216.58$0
Jan 199509315.92$0
Dec 199409215.03$0
Nov 1994012315.90$0
Oct 1994013915.58$0
Sep 1994011315.29$0
Aug 1994015416.13$0
Jul 1994011217.56$0
Jun 199403017.09$0
May 199403515.88$0
Apr 199405114.14$0
Mar 199406312.46$0
Feb 199408712.50$0
Jan 199407912.66$0
Dec 199307612.33$0
Nov 1993199014.49$275
Oct 199308815.85$0
Sep 1993010915.03$0
Aug 199309515.66$0
Jul 1993010315.46$0
Jun 1993012716.79$0
May 1993011517.68$0
Apr 1993013018.05$0
Mar 19937913318.14$1,433
Feb 1993012217.90$0
Jan 1993014616.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2024 — as filed, then multipliedworked
Condensate             0 bbl  × $ 69.05 =         $0
Gas                   18 Mcf  × $  2.20 =        $40

────────────────────────────────────────────────────
Month total                                      $40

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/117411 is the state's own key, not one this site invented.