HARRELL, J.C.

Operated by NORTH RIDGE CORPORATION (P-5 614120) in the RANGER (BLACK LIME WEST) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 122491District 7BField 74657250CondensateGasSaveExport
Value, all time
$73 k
Jan 1993 – Dec 2003
Value, last 12 filed months
$10 k
at the published price for each month
Months reported
132
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 78 leases and 109 wells, and the rule below applies to all of them.

Discovered
1981-10-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres.

The Commission's schedule remark for this field reads: NET GOR 400 MCF/DAY PER WELL

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition23 bbl$674
GasProduction48,362 Mcf$72,522
Total$73,196

26,762 Mcf of this lease's gas, across 47 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.4941, -98.7717. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.49405, -98.77171 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
3,905 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,905 ft.

Completions filed
Jul 2003
1 of 1 wells

1 well

42-1333443113,905 ftJul 2003Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (132)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

132 months

Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 200322029.765.13$655
Jul 20030029.415.17$0
Jun 2003025028.565.98$1,496
May 2003026526.595.97$1,583
Apr 2003025826.675.41$1,395
Mar 2003024431.146.10$1,487
Feb 2003022133.487.93$1,752
Jan 2003027630.315.58$1,541
Dec 2002027126.914.85$1,315
Nov 2002029124.664.14$1,204
Oct 2002029926.464.23$1,265
Sep 2002027427.443.64$996
Aug 2002026525.963.16$839
Jul 2002027424.583.06$839
Jun 2002024023.733.34$801
May 2002030724.663.58$1,100
Apr 2002026323.653.51$924
Mar 2002027522.003.10$853
Feb 2002015618.222.38$371
Jan 200203217.172.38$76
Dec 200108316.932.36$196
Nov 200107218.072.41$173
Oct 2001027419.782.53$693
Sep 2001025024.262.25$563
Aug 2001022324.873.05$681
Jul 2001027523.933.20$879
Jun 2001027424.563.82$1,048
May 2001029525.524.31$1,271
Apr 2001027324.685.34$1,457
Mar 2001028624.545.38$1,538
Feb 2001027827.755.77$1,603
Jan 2001031727.478.40$2,662
Dec 2000027626.889.12$2,518
Nov 2000026132.215.66$1,477
Oct 2000028331.235.15$1,456
Sep 2000024831.875.19$1,286
Aug 2000027829.644.54$1,262
Jul 2000023128.534.09$945
Jun 2000021729.304.40$954
May 2000024427.263.68$898
Apr 2000027624.513.12$860
Mar 2000026528.422.86$758
Feb 2000025127.622.73$684
Jan 2000026525.272.48$657
Dec 1999026424.282.42$640
Nov 1999028823.192.43$701
Oct 1999028220.982.80$791
Sep 1999026321.752.62$689
Aug 1999127619.262.88$813
Jul 1999029617.892.37$702
Jun 1999025415.942.36$600
May 1999027715.792.32$643
Apr 1999024115.102.21$532
Mar 1999029012.471.84$533
Feb 199902439.981.82$442
Jan 1999028810.381.90$547
Dec 199802859.201.77$505
Nov 1998027610.892.19$603
Oct 1998034912.421.97$687
Sep 1998033212.592.08$691
Aug 1998034311.301.91$654
Jul 1998031011.742.24$694
Jun 1998032911.242.24$736
May 1998030412.622.21$671
Apr 1998031413.042.51$787
Mar 1998032312.802.31$746
Feb 1998032913.952.30$756
Jan 1998033814.702.15$728
Dec 1997034616.322.41$834
Nov 1997025318.193.09$781
Oct 1997032619.253.15$1,027
Sep 1997036117.742.95$1,067
Aug 1997034817.862.55$889
Jul 1997038517.582.25$865
Jun 1997035117.242.26$792
May 1997033318.972.31$769
Apr 1997033117.882.08$689
Mar 1997034518.951.94$669
Feb 1997034720.492.21$765
Jan 1997032423.483.54$1,147
Dec 1996033723.32$0
Nov 1996037221.97$0
Oct 1996040223.31$0
Sep 1996039222.22$0
Aug 1996037920.26$0
Jul 1996039619.55$0
Jun 1996038618.73$0
May 1996043019.43$0
Apr 1996040521.51$0
Mar 1996036619.38$0
Feb 1996034316.98$0
Jan 1996040317.07$0
Dec 1995029617.19$0
Nov 1995035816.00$0
Oct 1995041315.43$0
Sep 1995043116.18$0
Aug 1995047215.92$0
Jul 1995042015.24$0
Jun 1995043016.41$0
May 1995045517.56$0
Apr 1995045617.73$0
Mar 1995049316.44$0
Feb 1995048116.58$0
Jan 1995056615.92$0
Dec 1994054815.03$0
Nov 1994059015.90$0
Oct 1994068115.58$0
Sep 1994069615.29$0
Aug 1994078716.13$0
Jul 1994089417.56$0
Jun 1994088917.09$0
May 1994091615.88$0
Apr 199401,00014.14$0
Mar 199401,11512.46$0
Feb 199401,00712.50$0
Jan 199401,12812.66$0
Dec 199301,54212.33$0
Nov 199301,33914.49$0
Oct 199301,35115.85$0
Sep 199301,23915.03$0
Aug 199301,12315.66$0
Jul 19930315.46$0
Jun 19930216.79$0
May 19930217.68$0
Apr 19930018.05$0
Mar 19930318.14$0
Feb 19930317.90$0
Jan 199302216.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2003 — as filed, then multipliedworked
Condensate            22 bbl  × $ 29.76 =       $655
Gas                    0 Mcf  × $  5.13 =         $0

────────────────────────────────────────────────────
Month total                                     $655

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/122491 is the state's own key, not one this site invented.