Operated by NORTH RIDGE CORPORATION (P-5 614120) in the RANGER (BLACK LIME WEST) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 122494District 7BField 74657250CondensateGasSaveExport
Value, all time
$68 k
Jan 1993 – Aug 2008
Value, last 12 filed months
$0
at the published price for each month
Months reported
188
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 78 leases and 109 wells, and the rule below applies to all of them.

Discovered
1981-10-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres.

The Commission's schedule remark for this field reads: NET GOR 400 MCF/DAY PER WELL

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition43 bbl$734
GasProduction33,817 Mcf$67,161
Total$67,895

13,418 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.4987, -98.7579. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.49870, -98.75792 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
3,843 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,843 ft.

Completions filed
Jun 2003
1 of 1 wells

1 well

42-1333425923,843 ftJun 2003Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (188)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

188 months

Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 2003049826.595.97$2,974
Apr 2003047226.675.41$2,552
Mar 2003048731.146.10$2,969
Feb 2003025833.487.93$2,045
Jan 2003029330.315.58$1,636
Dec 2002027226.914.85$1,320
Nov 2002019824.664.14$819
Oct 2002032326.464.23$1,366
Sep 2002023627.443.64$858
Aug 2002025625.963.16$810
Jul 2002028624.583.06$876
Jun 2002028123.733.34$938
May 2002028524.663.58$1,021
Apr 2002028123.653.51$987
Mar 2002016222.003.10$503
Feb 2002024318.222.38$577
Jan 2002034617.172.38$822
Dec 2001035216.932.36$832
Nov 2001029018.072.41$698
Oct 2001024419.782.53$617
Sep 2001016924.262.25$380
Aug 2001023524.873.05$717
Jul 2001026623.933.20$850
Jun 2001025924.563.82$990
May 2001028125.524.31$1,210
Apr 2001026424.685.34$1,409
Mar 2001023224.545.38$1,247
Feb 2001029627.755.77$1,707
Jan 2001028227.478.40$2,368
Dec 20000926.889.12$82
Nov 20000932.215.66$51
Oct 2000028331.235.15$1,456
Sep 20000031.875.19$0
Aug 20000029.644.54$0
Jul 2000031128.534.09$1,272
Jun 2000022129.304.40$972
May 2000025427.263.68$935
Apr 2000022124.513.12$689
Mar 2000032028.422.86$915
Feb 2000027827.622.73$758
Jan 2000033925.272.48$841
Dec 1999024824.282.42$601
Nov 1999030923.192.43$752
Oct 1999027020.982.80$757
Sep 1999021521.752.62$563
Aug 1999024519.262.88$705
Jul 1999028117.892.37$667
Jun 1999023415.942.36$553
May 1999025315.792.32$587
Apr 1999029015.102.21$640
Mar 1999025012.471.84$460
Feb 199902289.981.82$414
Jan 1999028610.381.90$543
Dec 199802369.201.77$419
Nov 1998025010.892.19$546
Oct 1998026012.421.97$512
Sep 1998028312.592.08$589
Aug 1998029411.301.91$561
Jul 1998034011.742.24$761
Jun 1998025911.242.24$579
May 1998032012.622.21$706
Apr 1998027513.042.51$689
Mar 1998027912.802.31$644
Feb 199808813.952.30$202
Jan 1998027014.702.15$582
Dec 1997024916.322.41$600
Nov 1997028318.193.09$874
Oct 1997031619.253.15$995
Sep 1997030517.742.95$901
Aug 1997025917.862.55$662
Jul 1997028117.582.25$631
Jun 1997029617.242.26$668
May 1997029518.972.31$681
Apr 1997031717.882.08$660
Mar 1997035018.951.94$679
Feb 1997029520.492.21$651
Jan 1997029823.483.54$1,055
Dec 1996032923.32$0
Nov 1996026221.97$0
Oct 1996026823.31$0
Sep 1996026022.22$0
Aug 1996029120.26$0
Jul 1996929619.55$176
Jun 1996029118.73$0
May 1996027619.43$0
Apr 1996023021.51$0
Mar 1996032419.38$0
Feb 1996026516.98$0
Jan 1996029417.07$0
Dec 1995030917.19$0
Nov 1995025416.00$0
Oct 1995026715.43$0
Sep 1995021716.18$0
Aug 1995026615.92$0
Jul 1995021115.24$0
Jun 1995024716.41$0
May 1995022617.56$0
Apr 1995026017.73$0
Mar 1995024416.44$0
Feb 1995021516.58$0
Jan 1995026415.92$0
Dec 1994025115.03$0
Nov 1994013915.90$0
Oct 19941317715.58$203
Sep 1994023415.29$0
Aug 1994022016.13$0
Jul 1994021417.56$0
Jun 1994020617.09$0
May 1994029015.88$0
Apr 1994026914.14$0
Mar 1994028712.46$0
Feb 1994025912.50$0
Jan 1994026312.66$0
Dec 1993026012.33$0
Nov 1993030314.49$0
Oct 1993035915.85$0
Sep 1993045715.03$0
Aug 1993031615.66$0
Jul 1993037015.46$0
Jun 1993043716.79$0
May 1993034717.68$0
Apr 1993029018.05$0
Mar 1993037918.14$0
Feb 1993038517.90$0
Jan 19932134016.93$356

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2003 — as filed, then multipliedworked
Condensate             0 bbl  × $ 26.59 =         $0
Gas                  498 Mcf  × $  5.97 =     $2,974

────────────────────────────────────────────────────
Month total                                   $2,974

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/122494 is the state's own key, not one this site invented.