CARAWAY-LOWE

Operated by CHANCE OIL CO., INC. (P-5 144170) in the LIBERTY OAK (BIG SALINE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 126772District 7BField 53505500GasSaveExport
Value, all time
$39 k
Jan 1993 – Jul 2006
Value, last 12 filed months
$0
at the published price for each month
Months reported
163
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 32 leases and 32 wells, and the rule below applies to all of them.

Discovered
1978-10-04
as the register files it
Field class
Gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 160 acres. The field rule took effect on 1985-07-01.

The Commission's schedule remark for this field reads: FIELD RETURNED TO 100% AOF EFFECTIVE 4/1/95.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction60,231 Mcf$38,845
Total$38,845

44,973 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.5072, -98.2358. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.50717, -98.23583 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,100 ft
1 wells filed one
Completion to plug
15.1 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,100 ft.

Completions filed
Jun 1991
1 of 1 wells
Plug dates filed
Jul 2006
1 of 1 wells

Last completion to plug: a median of 15.1 years across the 1 well that filed both dates, with the middle half between 15.1 years and 15.1 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1433086134,100 ftJun 1991Jul 2006Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (163)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

163 months

Jul 2006069.376.34$0
Jun 2006066.286.38$0
May 2006066.016.42$0
Apr 2006064.397.36$0
Mar 2006056.707.08$0
Feb 2006057.597.75$0
Jan 2006060.598.93$0
Dec 2005054.9413.42$0
Nov 2005054.6910.59$0
Oct 2005058.3413.80$0
Sep 2005061.4512.08$0
Aug 2005061.519.80$0
Jul 2005055.697.84$0
Jun 2005052.337.38$0
May 2005045.226.65$0
Apr 2005049.207.36$0
Mar 2005050.377.15$0
Feb 2005045.226.31$0
Jan 2005043.166.32$0
Dec 2004039.866.75$0
Nov 2004045.286.33$0
Oct 2004049.706.52$0
Sep 2004043.245.28$0
Aug 2004042.375.55$0
Jul 2004038.286.08$0
Jun 2004036.106.43$0
May 2004037.486.49$0
Apr 2004034.475.86$0
Mar 2004034.365.53$0
Feb 2004032.455.51$0
Jan 2004032.036.30$0
Dec 2003030.266.30$0
Nov 2003028.804.60$0
Oct 2003028.174.76$0
Sep 2003026.314.75$0
Aug 2003029.765.13$0
Jul 2003029.415.17$0
Jun 2003028.565.98$0
May 2003026.595.97$0
Apr 2003026.675.41$0
Mar 2003031.146.10$0
Feb 2003033.487.93$0
Jan 2003030.315.58$0
Dec 2002026.914.85$0
Nov 2002024.664.14$0
Oct 2002026.464.23$0
Sep 2002027.443.64$0
Aug 2002025.963.16$0
Jul 2002024.583.06$0
Jun 2002023.733.34$0
May 2002024.663.58$0
Apr 2002023.653.51$0
Mar 2002022.003.10$0
Feb 2002018.222.38$0
Jan 2002017.172.38$0
Dec 2001016.932.36$0
Nov 2001018.072.41$0
Oct 2001019.782.53$0
Sep 2001024.262.25$0
Aug 2001024.873.05$0
Jul 2001023.933.20$0
Jun 2001024.563.82$0
May 2001025.524.31$0
Apr 2001024.685.34$0
Mar 2001024.545.38$0
Feb 2001027.755.77$0
Jan 2001027.478.40$0
Dec 2000026.889.12$0
Nov 2000032.215.66$0
Oct 2000031.235.15$0
Sep 2000031.875.19$0
Aug 200023729.644.54$1,076
Jul 200034828.534.09$1,423
Jun 200045829.304.40$2,014
May 200023527.263.68$865
Apr 200024824.513.12$773
Mar 200030228.422.86$864
Feb 200024227.622.73$660
Jan 200029325.272.48$727
Dec 199927924.282.42$676
Nov 199926423.192.43$643
Oct 199930220.982.80$847
Sep 199928621.752.62$749
Aug 199932219.262.88$926
Jul 199932917.892.37$781
Jun 199931715.942.36$749
May 199931915.792.32$740
Apr 199933015.102.21$729
Mar 199936312.471.84$667
Feb 19993439.981.82$624
Jan 199934710.381.90$659
Dec 19982799.201.77$495
Nov 199826810.892.19$586
Oct 199829012.421.97$571
Sep 199830712.592.08$639
Aug 199835511.301.91$677
Jul 199873511.742.24$1,644
Jun 199838411.242.24$859
May 199833912.622.21$748
Apr 199848713.042.51$1,220
Mar 199857012.802.31$1,316
Feb 199866613.952.30$1,531
Jan 199852114.702.15$1,123
Dec 199763616.322.41$1,533
Nov 199778618.193.09$2,427
Oct 199728719.253.15$904
Sep 199718717.742.95$553
Aug 199717717.862.55$452
Jul 199722417.582.25$503
Jun 199710017.242.26$226
May 199727418.972.31$633
Apr 199730017.882.08$625
Mar 199729818.951.94$578
Feb 199729820.492.21$657
Jan 199732623.483.54$1,154
Dec 199628323.32$0
Nov 19969221.97$0
Oct 199616123.31$0
Sep 199637722.22$0
Aug 199631920.26$0
Jul 199630719.55$0
Jun 199620218.73$0
May 199623319.43$0
Apr 199630321.51$0
Mar 199635819.38$0
Feb 199638916.98$0
Jan 199669317.07$0
Dec 199560617.19$0
Nov 199576216.00$0
Oct 199576715.43$0
Sep 199571116.18$0
Aug 199568815.92$0
Jul 199576515.24$0
Jun 19951,13016.41$0
May 199560717.56$0
Apr 199567417.73$0
Mar 199570116.44$0
Feb 199584916.58$0
Jan 19951,19915.92$0
Dec 199485315.03$0
Nov 199479715.90$0
Oct 199492515.58$0
Sep 199495815.29$0
Aug 199490516.13$0
Jul 199499817.56$0
Jun 19941,21717.09$0
May 19941,11715.88$0
Apr 19941,18314.14$0
Mar 19941,17912.46$0
Feb 19941,45712.50$0
Jan 19941,13412.66$0
Dec 19931,02412.33$0
Nov 19931,35914.49$0
Oct 19931,36915.85$0
Sep 19931,42215.03$0
Aug 19931,65915.66$0
Jul 19931,86015.46$0
Jun 19931,69516.79$0
May 19931,89517.68$0
Apr 19931,46018.05$0
Mar 19931,79318.14$0
Feb 19931,59117.90$0
Jan 19931,94716.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2000 — as filed, then multipliedworked
Gas                  237 Mcf  × $  4.54 =     $1,076

────────────────────────────────────────────────────
Month total                                   $1,076

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/126772 is the state's own key, not one this site invented.