GLIDEWELL

Operated by AMERICAN WEST RESOURCES, INC (P-5 19739) in the J. V. T. (CONGL. 4250) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 127179District 7BField 45214250CondensateGasSaveExport
Value, all time
$12 k
Jan 1993 – Feb 2008
Value, last 12 filed months
$0
at the published price for each month
Months reported
182
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 25 leases and 25 wells, and the rule below applies to all of them.

Discovered
1974-03-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 160 acres. The field rule took effect on 2015-01-27.

The Commission's schedule remark for this field reads: BE NOTIFIED PURSUANT TO SWR 31 (J).

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition83 bbl$1,340
GasProduction17,365 Mcf$10,462
Total$11,802

13,063 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.7676, -98.2115. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.76759, -98.21147 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,100 ft
1 wells filed one
Completion to plug
19.9 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,100 ft.

Completions filed
Apr 1988
1 of 1 wells
Plug dates filed
Mar 2008
1 of 1 wells

Last completion to plug: a median of 19.9 years across the 1 well that filed both dates, with the middle half between 19.9 years and 19.9 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3633389734,100 ftApr 1988Mar 2008Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (182)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

182 months

Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 20010016.932.36$0
Nov 20010018.072.41$0
Oct 20010019.782.53$0
Sep 20010024.262.25$0
Aug 20010024.873.05$0
Jul 20010023.933.20$0
Jun 20010024.563.82$0
May 20010025.524.31$0
Apr 20010024.685.34$0
Mar 20010024.545.38$0
Feb 20010027.755.77$0
Jan 20010027.478.40$0
Dec 20000026.889.12$0
Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 20000031.875.19$0
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 200008629.304.40$378
May 2000012627.263.68$464
Apr 200008224.513.12$256
Mar 200006828.422.86$194
Feb 200007427.622.73$202
Jan 200007425.272.48$184
Dec 199908724.282.42$211
Nov 199905623.192.43$136
Oct 199906220.982.80$174
Sep 199909921.752.62$259
Aug 199907419.262.88$213
Jul 199907717.892.37$183
Jun 199908415.942.36$198
May 1999011015.792.32$255
Apr 199909315.102.21$205
Mar 1999011912.471.84$219
Feb 199901169.981.82$211
Jan 1999012110.381.90$230
Dec 199801339.201.77$236
Nov 199809010.892.19$197
Oct 1998012912.421.97$254
Sep 1998011412.592.08$237
Aug 1998013611.301.91$259
Jul 1998011311.742.24$253
Jun 1998013611.242.24$304
May 1998013412.622.21$296
Apr 1998013313.042.51$333
Mar 1998013212.802.31$305
Feb 1998010013.952.30$230
Jan 1998010414.702.15$224
Dec 1997011916.322.41$287
Nov 199708218.193.09$253
Oct 199705319.253.15$167
Sep 1997010017.742.95$295
Aug 1997013117.862.55$335
Jul 1997012217.582.25$274
Jun 1997010017.242.26$226
May 1997010318.972.31$238
Apr 1997011617.882.08$242
Mar 1997015918.951.94$308
Feb 19970820.492.21$18
Jan 1997014723.483.54$520
Dec 1996013523.32$0
Nov 1996012621.97$0
Oct 1996013123.31$0
Sep 1996015522.22$0
Aug 1996032420.26$0
Jul 1996752419.55$137
Jun 1996023318.73$0
May 1996023819.43$0
Apr 1996020721.51$0
Mar 1996026419.38$0
Feb 1996014816.98$0
Jan 1996013317.07$0
Dec 1995115817.19$17
Nov 1995018216.00$0
Oct 1995041115.43$0
Sep 1995413516.18$65
Aug 199501515.92$0
Jul 199502415.24$0
Jun 199505416.41$0
May 199505217.56$0
Apr 199507017.73$0
Mar 1995029416.44$0
Feb 1995031316.58$0
Jan 19955619415.92$892
Dec 1994621615.03$90
Nov 1994023315.90$0
Oct 1994026915.58$0
Sep 1994035715.29$0
Aug 1994023116.13$0
Jul 1994040617.56$0
Jun 1994027317.09$0
May 1994022615.88$0
Apr 1994029214.14$0
Mar 1994023112.46$0
Feb 1994031812.50$0
Jan 1994035612.66$0
Dec 1993038212.33$0
Nov 1993335114.49$43
Oct 1993038115.85$0
Sep 1993036615.03$0
Aug 1993552915.66$78
Jul 1993037615.46$0
Jun 1993042516.79$0
May 1993172317.68$18
Apr 1993037918.05$0
Mar 1993041918.14$0
Feb 1993037717.90$0
Jan 1993042716.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2000 — as filed, then multipliedworked
Condensate             0 bbl  × $ 29.30 =         $0
Gas                   86 Mcf  × $  4.40 =       $378

────────────────────────────────────────────────────
Month total                                     $378

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/127179 is the state's own key, not one this site invented.