WHITEHEAD

Operated by MOSAIC OIL LLC (P-5 589978) in the COCKRELL (STRAWN) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 148149District 7BField 192807002 tax incentive programmesGasSaveExport
Value, all time
$45 k
Jan 1994 – Mar 2024
Value, last 12 filed months
$0
at the published price for each month
Months reported
363
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 92 leases and 92 wells, and the rule below applies to all of them.

Discovered
1982-02-24
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111994-04-06129974
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction39,087 Mcf$45,413
Total$45,413

21,076 Mcf of this lease's gas, across 34 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.5853, -97.8729. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.58526, -97.87293 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,087 ft
1 wells filed one
Completion to plug
30.2 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,087 ft.

Completions filed
Jan 1994
1 of 1 wells
Plug dates filed
Mar 2024
1 of 1 wells

Last completion to plug: a median of 30.2 years across the 1 well that filed both dates, with the middle half between 30.2 years and 30.2 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3673115115,087 ftJan 1994Mar 2024Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (363)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

363 months

Mar 2024080.301.55$0
Feb 2024076.091.78$0
Jan 2024073.023.30$0
Dec 2023071.262.61$0
Nov 2023077.892.81$0
Oct 2023085.443.09$0
Sep 2023089.042.74$0
Aug 2023080.522.67$0
Jul 2023074.852.64$0
Jun 2023068.962.26$0
May 2023070.622.23$0
Apr 2023078.122.24$0
Mar 2023072.852.39$0
Feb 2023075.112.47$0
Jan 2023076.533.39$0
Dec 2022076.415.73$0
Nov 2022085.005.65$0
Oct 2022087.185.86$0
Sep 2022084.888.16$0
Aug 2022094.529.13$0
Jul 20220101.587.54$0
Jun 20220115.097.98$0
May 20220109.378.43$0
Apr 20220104.226.84$0
Mar 20220108.885.08$0
Feb 2022091.054.86$0
Jan 2022081.844.54$0
Dec 2021071.323.90$0
Nov 2021077.435.24$0
Oct 2021079.795.71$0
Sep 2021069.865.35$0
Aug 2021066.024.22$0
Jul 2021070.783.98$0
Jun 2021069.493.38$0
May 2021063.483.02$0
Apr 2021060.362.76$0
Mar 2021061.302.72$0
Feb 2021057.805.55$0
Jan 2021050.412.81$0
Dec 2020044.642.68$0
Nov 2020038.772.71$0
Oct 2020036.972.48$0
Sep 2020037.091.99$0
Aug 2020039.982.39$0
Jul 2020038.371.83$0
Jun 2020034.901.69$0
May 2020016.921.81$0
Apr 2020014.751.80$0
Mar 2020030.341.86$0
Feb 2020049.881.98$0
Jan 2020057.252.09$0
Dec 2019059.012.30$0
Nov 2019055.302.75$0
Oct 2019053.472.42$0
Sep 2019055.052.66$0
Aug 2019053.112.30$0
Jul 2019056.272.46$0
Jun 2019052.782.49$0
May 2019058.482.74$0
Apr 2019062.632.75$0
Mar 2019056.803.06$0
Feb 2019050.852.79$0
Jan 2019046.033.23$0
Dec 2018046.594.19$0
Nov 2018052.934.24$0
Oct 2018061.443.40$0
Sep 2018059.543.11$0
Aug 2018059.403.07$0
Jul 2018065.142.93$0
Jun 2018060.183.08$0
May 2018065.382.90$0
Apr 2018063.842.90$0
Mar 2018061.222.79$0
Feb 2018061.782.77$0
Jan 2018062.874.01$0
Dec 2017057.272.92$0
Nov 2017055.423.12$0
Oct 2017049.292.98$0
Sep 2017047.523.09$0
Aug 2017045.373.00$0
Jul 2017043.873.09$0
Jun 2017042.493.09$0
May 2017045.373.26$0
Apr 2017047.933.21$0
Mar 2017046.772.98$0
Feb 2017050.452.95$0
Jan 2017049.413.42$0
Dec 2016048.763.72$0
Nov 2016042.492.64$0
Oct 2016046.193.09$0
Sep 2016041.553.10$0
Aug 2016041.442.92$0
Jul 2016041.622.92$0
Jun 2016045.352.69$0
May 2016042.521.99$0
Apr 2016036.561.99$0
Mar 2016033.011.79$0
Feb 2016026.472.06$0
Jan 2016027.352.36$0
Dec 2015132.362.00$2
Nov 2015138.792.17$2
Oct 2015143.552.43$2
Sep 2015142.992.76$3
Aug 2015140.162.87$3
Jul 2015148.152.95$3
Jun 2015156.152.88$3
May 2015155.212.96$3
Apr 2015149.822.71$3
Mar 2015142.892.93$3
Feb 2015144.662.98$3
Jan 2015143.433.10$3
Dec 2014154.693.59$4
Nov 2014170.464.25$4
Oct 2014178.303.90$4
Sep 2014186.164.05$4
Aug 2014189.394.04$4
Jul 2014196.564.18$4
Jun 2014198.164.74$5
May 2014194.734.73$5
Apr 2014195.944.81$5
Mar 2014195.895.06$5
Feb 2014197.406.19$6
Jan 2014190.404.86$5
Dec 2013191.824.35$4
Nov 2013188.853.74$4
Oct 2013197.423.78$4
Sep 20131104.113.72$4
Aug 20131104.253.52$4
Jul 20131102.523.72$4
Jun 2013194.403.93$4
May 2013194.834.15$4
Apr 2013193.964.28$4
Mar 2013193.623.91$4
Feb 2013191.233.42$3
Jan 2013191.603.42$3
Dec 2012186.773.42$3
Nov 2012186.953.62$4
Oct 2012189.383.40$3
Sep 2012194.672.92$3
Aug 2012192.662.91$3
Jul 2012185.133.02$3
Jun 2012179.822.52$3
May 2012191.612.49$2
Apr 20121101.652.00$2
Mar 20121105.052.22$2
Feb 20121101.102.57$3
Jan 2012198.092.73$3
Dec 2011196.873.24$3
Nov 2011195.723.31$3
Oct 2011184.983.65$4
Sep 2011183.623.99$4
Aug 2011183.404.15$4
Jul 2011194.144.52$5
Jun 2011192.904.64$5
May 2011198.134.40$4
Apr 20111105.964.33$4
Mar 2011196.364.06$4
Feb 2011185.644.18$4
Jan 2011186.504.59$5
Dec 2010185.734.35$4
Nov 2010180.843.80$4
Oct 2010178.103.51$4
Sep 2010172.633.98$4
Aug 2010173.684.42$4
Jul 2010172.554.74$5
Jun 2010170.364.91$5
May 2010171.124.24$4
Apr 2010181.694.12$4
Mar 2010178.394.39$4
Feb 2010173.585.44$5
Jan 2010174.365.96$6
Dec 2009171.445.48$5
Nov 2009174.593.75$4
Oct 2009172.544.11$4
Sep 2009165.543.06$3
Aug 2009167.423.22$3
Jul 2009161.133.46$3
Jun 2009166.163.90$4
May 2009154.743.93$4
Apr 2009146.773.59$4
Mar 2009142.144.06$4
Feb 2009132.814.63$5
Jan 2009135.865.37$5
Dec 2008137.105.98$6
Nov 2008155.496.86$7
Oct 2008175.246.92$7
Sep 20081101.767.88$8
Aug 20081114.228.48$8
Jul 20081131.0811.39$11
Jun 20081131.3313.03$13
May 20081123.1711.57$12
Apr 20081110.3110.45$10
Mar 20081101.909.66$10
Feb 2008192.538.77$9
Jan 2008190.388.21$8
Dec 2007188.337.30$7
Nov 2007191.677.29$7
Oct 2007182.856.92$7
Sep 2007175.846.24$6
Aug 2007169.066.39$6
Jul 2007170.906.39$6
Jun 2007162.007.55$8
May 2007158.747.85$8
Apr 2007159.617.81$8
Mar 2007156.927.30$7
Feb 2007155.108.22$8
Jan 2007150.306.73$7
Dec 2006156.656.92$7
Nov 2006154.207.62$8
Oct 2006154.906.01$6
Sep 2006160.085.04$5
Aug 2006168.717.34$7
Jul 2006169.376.34$6
Jun 2006166.286.38$6
May 2006166.016.42$6
Apr 2006164.397.36$7
Mar 2006156.707.08$7
Feb 2006157.597.75$8
Jan 2006160.598.93$9
Dec 2005154.9413.42$13
Nov 2005154.6910.59$11
Oct 2005158.3413.80$14
Sep 2005161.4512.08$12
Aug 2005161.519.80$10
Jul 2005155.697.84$8
Jun 2005152.337.38$7
May 2005145.226.65$7
Apr 2005149.207.36$7
Mar 2005150.377.15$7
Feb 2005145.226.31$6
Jan 2005143.166.32$6
Dec 2004139.866.75$7
Nov 2004145.286.33$6
Oct 2004149.706.52$7
Sep 2004143.245.28$5
Aug 2004142.375.55$6
Jul 2004138.286.08$6
Jun 2004136.106.43$6
May 2004137.486.49$6
Apr 2004134.475.86$6
Mar 2004134.365.53$6
Feb 2004132.455.51$6
Jan 2004132.036.30$6
Dec 2003130.266.30$6
Nov 2003128.804.60$5
Oct 2003128.174.76$5
Sep 2003126.314.75$5
Aug 2003129.765.13$5
Jul 2003129.415.17$5
Jun 2003128.565.98$6
May 20031026.595.97$60
Apr 20031026.675.41$54
Mar 20031031.146.10$61
Feb 20031033.487.93$79
Jan 20031030.315.58$56
Dec 20021026.914.85$49
Nov 20021024.664.14$41
Oct 20021026.464.23$42
Sep 20021027.443.64$36
Aug 20021025.963.16$32
Jul 20021024.583.06$31
Jun 20021023.733.34$33
May 20021524.663.58$54
Apr 20022523.653.51$88
Mar 20021022.003.10$31
Feb 20021018.222.38$24
Jan 2002017.172.38$0
Dec 2001016.932.36$0
Nov 2001018.072.41$0
Oct 2001019.782.53$0
Sep 2001024.262.25$0
Aug 2001024.873.05$0
Jul 2001023.933.20$0
Jun 2001024.563.82$0
May 2001025.524.31$0
Apr 2001024.685.34$0
Mar 2001024.545.38$0
Feb 2001027.755.77$0
Jan 2001027.478.40$0
Dec 2000026.889.12$0
Nov 2000832.215.66$45
Oct 2000031.235.15$0
Sep 2000031.875.19$0
Aug 2000029.644.54$0
Jul 200011628.534.09$474
Jun 200039029.304.40$1,715
May 200040327.263.68$1,483
Apr 200042224.513.12$1,315
Mar 200038728.422.86$1,107
Feb 200039627.622.73$1,080
Jan 200047025.272.48$1,166
Dec 199930424.282.42$737
Nov 199941423.192.43$1,008
Oct 199947420.982.80$1,329
Sep 199942121.752.62$1,103
Aug 199938719.262.88$1,113
Jul 199950917.892.37$1,208
Jun 199936415.942.36$860
May 199940315.792.32$935
Apr 199942815.102.21$945
Mar 199948912.471.84$899
Feb 19994569.981.82$829
Jan 199926610.381.90$505
Dec 19985139.201.77$910
Nov 199838410.892.19$839
Oct 199844812.421.97$882
Sep 199865812.592.08$1,370
Aug 199825211.301.91$481
Jul 199852811.742.24$1,181
Jun 199836911.242.24$826
May 199833612.622.21$741
Apr 199837613.042.51$942
Mar 199835612.802.31$822
Feb 199835413.952.30$814
Jan 199841314.702.15$890
Dec 199739916.322.41$962
Nov 199725718.193.09$794
Oct 199730019.253.15$945
Sep 199771517.742.95$2,113
Aug 199734617.862.55$884
Jul 199748617.582.25$1,092
Jun 199745217.242.26$1,020
May 199742118.972.31$972
Apr 199733217.882.08$691
Mar 199752818.951.94$1,024
Feb 199743820.492.21$966
Jan 199751223.483.54$1,812
Dec 199654923.32$0
Nov 199648221.97$0
Oct 199669023.31$0
Sep 199640122.22$0
Aug 199628320.26$0
Jul 199629419.55$0
Jun 199639518.73$0
May 19961,19619.43$0
Apr 199640721.51$0
Mar 199651119.38$0
Feb 199645216.98$0
Jan 199656417.07$0
Dec 199550417.19$0
Nov 199565416.00$0
Oct 199569615.43$0
Sep 199563116.18$0
Aug 199536515.92$0
Jul 199569915.24$0
Jun 199560416.41$0
May 199558217.56$0
Apr 199552317.73$0
Mar 199572416.44$0
Feb 199575916.58$0
Jan 199563615.92$0
Dec 199452215.03$0
Nov 199472615.90$0
Oct 199477515.58$0
Sep 199497715.29$0
Aug 199444316.13$0
Jul 199496217.56$0
Jun 199480817.09$0
May 199483915.88$0
Apr 199487814.14$0
Mar 199454512.46$0
Feb 1994012.50$0
Jan 1994012.66$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2015 — as filed, then multipliedworked
Gas                    1 Mcf  × $  2.00 =         $2

────────────────────────────────────────────────────
Month total                                       $2

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/148149 is the state's own key, not one this site invented.