BROOKS, R. W. "B"

Operated by MCCLYMOND, LTD. (P-5 541455) in the BLOOMQUIST (LAKE SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 152261District 7BField 09689500CondensateGasSaveExport
Value, all time
$253 k
Nov 1994 – Mar 2009
Value, last 12 filed months
$1 k
at the published price for each month
Months reported
173
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 25 leases and 34 wells, and the rule below applies to all of them.

Discovered
1951-10-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1990-07-09.

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 09/01/2006.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition504 bbl$22,065
GasProduction69,602 Mcf$230,457
Total$252,522

18,928 Mcf of this lease's gas, across 26 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.5509, -99.0676. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.55092, -99.06756 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,221 ft
1 wells filed one
Completion to plug
20.5 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,221 ft.

Completions filed
Jul 1988
1 of 1 wells
Plug dates filed
Jan 2009
1 of 1 wells

Last completion to plug: a median of 20.5 years across the 1 well that filed both dates, with the middle half between 20.5 years and 20.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4293497914,221 ftJul 1988Jan 2009Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (173)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

173 months

Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 2008016131.3313.03$209
May 2008061123.1711.57$706
Apr 2008043110.3110.45$450
Mar 20080198101.909.66$1,913
Feb 2008024392.538.77$2,131
Jan 2008027090.388.21$2,216
Dec 200714722688.337.30$14,635
Nov 2007025291.677.29$1,838
Oct 2007025382.856.92$1,751
Sep 2007025375.846.24$1,580
Aug 2007026469.066.39$1,686
Jul 2007027570.906.39$1,757
Jun 2007029362.007.55$2,212
May 2007028258.747.85$2,213
Apr 2007028159.617.81$2,193
Mar 2007026156.927.30$1,906
Feb 2007025455.108.22$2,087
Jan 2007028250.306.73$1,897
Dec 2006029556.656.92$2,041
Nov 2006026954.207.62$2,049
Oct 2006030854.906.01$1,852
Sep 2006030160.085.04$1,516
Aug 2006032668.717.34$2,393
Jul 2006035569.376.34$2,252
Jun 2006035166.286.38$2,241
May 2006033366.016.42$2,140
Apr 2006031364.397.36$2,304
Mar 2006030056.707.08$2,125
Feb 2006027557.597.75$2,132
Jan 2006030260.598.93$2,698
Dec 2005030454.9413.42$4,078
Nov 2005030454.6910.59$3,219
Oct 2005032558.3413.80$4,484
Sep 2005027361.4512.08$3,298
Aug 2005032361.519.80$3,164
Jul 2005031255.697.84$2,447
Jun 2005028652.337.38$2,111
May 2005028645.226.65$1,902
Apr 2005031249.207.36$2,296
Mar 2005033350.377.15$2,383
Feb 2005035645.226.31$2,247
Jan 2005012343.166.32$778
Dec 2004025039.866.75$1,688
Nov 2004030445.286.33$1,924
Oct 2004029949.706.52$1,948
Sep 2004031043.245.28$1,638
Aug 2004030142.375.55$1,671
Jul 2004030838.286.08$1,874
Jun 2004031236.106.43$2,007
May 2004034237.486.49$2,221
Apr 2004031234.475.86$1,828
Mar 2004032534.365.53$1,797
Feb 2004029532.455.51$1,625
Jan 2004030332.036.30$1,909
Dec 2003034230.266.30$2,155
Nov 2003031728.804.60$1,457
Oct 2003033428.174.76$1,590
Sep 2003029126.314.75$1,382
Aug 2003035429.765.13$1,816
Jul 2003036329.415.17$1,877
Jun 2003032728.565.98$1,956
May 2003034926.595.97$2,084
Apr 2003033126.675.41$1,790
Mar 20037135631.146.10$4,381
Feb 2003031133.487.93$2,465
Jan 2003035330.315.58$1,970
Dec 2002037226.914.85$1,806
Nov 2002035124.664.14$1,452
Oct 2002033226.464.23$1,404
Sep 2002034827.443.64$1,265
Aug 2002036825.963.16$1,164
Jul 2002036324.583.06$1,111
Jun 2002037523.733.34$1,252
May 2002036924.663.58$1,323
Apr 2002034923.653.51$1,226
Mar 2002036022.003.10$1,117
Feb 2002032418.222.38$770
Jan 2002035217.172.38$836
Dec 2001038316.932.36$906
Nov 200106018.072.41$144
Oct 2001024819.782.53$627
Sep 2001037424.262.25$842
Aug 2001040324.873.05$1,230
Jul 2001045123.933.20$1,442
Jun 2001041524.563.82$1,587
May 2001039525.524.31$1,701
Apr 2001040124.685.34$2,139
Mar 2001041324.545.38$2,220
Feb 2001035127.755.77$2,024
Jan 2001024827.478.40$2,083
Dec 2000036926.889.12$3,366
Nov 2000040732.215.66$2,303
Oct 2000044231.235.15$2,274
Sep 2000043431.875.19$2,251
Aug 2000046529.644.54$2,111
Jul 2000046228.534.09$1,889
Jun 2000045529.304.40$2,001
May 2000046827.263.68$1,722
Apr 2000045324.513.12$1,412
Mar 2000044728.422.86$1,278
Feb 200017642527.622.73$6,020
Jan 2000042325.272.48$1,049
Dec 1999043024.282.42$1,042
Nov 1999043723.192.43$1,064
Oct 1999044020.982.80$1,234
Sep 1999047021.752.62$1,231
Aug 1999047519.262.88$1,366
Jul 1999047617.892.37$1,129
Jun 1999046615.942.36$1,101
May 1999047215.792.32$1,096
Apr 1999050015.102.21$1,104
Mar 1999045812.471.84$842
Feb 199904259.981.82$773
Jan 1999049410.381.90$939
Dec 199805419.201.77$959
Nov 1998055210.892.19$1,207
Oct 1998026512.421.97$522
Sep 1998013812.592.08$287
Aug 1998056611.301.91$1,080
Jul 1998049211.742.24$1,101
Jun 1998052611.242.24$1,177
May 1998063512.622.21$1,401
Apr 1998060213.042.51$1,508
Mar 1998059812.802.31$1,381
Feb 1998049513.952.30$1,138
Jan 1998052914.702.15$1,140
Dec 1997051616.322.41$1,244
Nov 1997050618.193.09$1,563
Oct 1997045119.253.15$1,421
Sep 1997049317.742.95$1,457
Aug 1997052517.862.55$1,341
Jul 1997055117.582.25$1,238
Jun 1997050617.242.26$1,142
May 1997044918.972.31$1,037
Apr 1997064317.882.08$1,339
Mar 1997067618.951.94$1,311
Feb 1997059120.492.21$1,304
Jan 1997066923.483.54$2,368
Dec 1996065623.32$0
Nov 1996065821.97$0
Oct 1996070423.31$0
Sep 1996063822.22$0
Aug 1996067820.26$0
Jul 1996068319.55$0
Jun 19966668318.73$1,236
May 1996070019.43$0
Apr 1996067521.51$0
Mar 1996069919.38$0
Feb 1996064616.98$0
Jan 1996065217.07$0
Dec 1995072217.19$0
Nov 1995068416.00$0
Oct 1995074515.43$0
Sep 1995074016.18$0
Aug 1995079415.92$0
Jul 1995079815.24$0
Jun 1995077216.41$0
May 19954478717.56$773
Apr 1995077717.73$0
Mar 1995080816.44$0
Feb 1995074116.58$0
Jan 1995082215.92$0
Dec 1994084515.03$0
Nov 1994082115.90$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2008 — as filed, then multipliedworked
Condensate             0 bbl  × $131.33 =         $0
Gas                   16 Mcf  × $ 13.03 =       $209

────────────────────────────────────────────────────
Month total                                     $209

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/152261 is the state's own key, not one this site invented.