BLACKMON UNIT 2

Operated by KADANE CORPORATION (P-5 450038) in the BOB RICHARDS RANCH (CONGL.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 153994District 7BField 10028500CondensateGasSaveExport
Value, all time
$715 k
Mar 1995 – Aug 2015
Value, last 12 filed months
$9 k
at the published price for each month
Months reported
246
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 30 leases and 30 wells, and the rule below applies to all of them.

Discovered
1978-12-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres.

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 12/01/97.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition499 bbl$9,974
GasProduction378,542 Mcf$704,638
Total$714,612

211,317 Mcf of this lease's gas, across 21 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.5305, -98.2789. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.53047, -98.27893 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
3,740 ft
1 wells filed one
Completion to plug
20.1 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,740 ft.

Completions filed
Mar 1995
1 of 1 wells
Plug dates filed
Apr 2015
1 of 1 wells

Last completion to plug: a median of 20.1 years across the 1 well that filed both dates, with the middle half between 20.1 years and 20.1 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3633437253,740 ftMar 1995Apr 2015Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (246)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

246 months

Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 201540056.152.88$2,246
May 20150055.212.96$0
Apr 2015011849.822.71$319
Mar 2015031342.892.93$919
Feb 2015019844.662.98$589
Jan 2015021943.433.10$679
Dec 2014020854.693.59$747
Nov 2014019670.464.25$833
Oct 2014036178.303.90$1,408
Sep 2014031786.164.05$1,282
Aug 2014036489.394.04$1,469
Jul 2014031696.564.18$1,321
Jun 2014034298.164.74$1,620
May 2014030594.734.73$1,442
Apr 2014019795.944.81$947
Mar 2014042695.895.06$2,154
Feb 2014023597.406.19$1,455
Jan 2014038690.404.86$1,876
Dec 2013046091.824.35$2,003
Nov 2013034488.853.74$1,286
Oct 2013037197.423.78$1,402
Sep 20130438104.113.72$1,628
Aug 20130431104.253.52$1,518
Jul 20130382102.523.72$1,420
Jun 2013031394.403.93$1,231
May 2013030094.834.15$1,245
Apr 2013058593.964.28$2,505
Mar 2013064593.623.91$2,524
Feb 2013031591.233.42$1,077
Jan 2013038091.603.42$1,300
Dec 2012036486.773.42$1,245
Nov 2012041386.953.62$1,497
Oct 2012034689.383.40$1,176
Sep 2012031594.672.92$919
Aug 2012036992.662.91$1,073
Jul 2012027985.133.02$843
Jun 2012030879.822.52$776
May 2012028991.612.49$719
Apr 20120293101.652.00$585
Mar 20120334105.052.22$742
Feb 20120230101.102.57$591
Jan 2012016798.092.73$457
Dec 2011020696.873.24$667
Nov 2011027895.723.31$921
Oct 2011031284.983.65$1,138
Sep 2011022583.623.99$897
Aug 2011018383.404.15$759
Jul 2011034394.144.52$1,549
Jun 2011032492.904.64$1,503
May 2011033898.134.40$1,489
Apr 20110188105.964.33$815
Mar 2011016096.364.06$649
Feb 2011011685.644.18$485
Jan 2011024486.504.59$1,120
Dec 2010034885.734.35$1,513
Nov 2010035580.843.80$1,347
Oct 2010046578.103.51$1,632
Sep 2010042472.633.98$1,687
Aug 2010052373.684.42$2,311
Jul 2010065072.554.74$3,079
Jun 2010082270.364.91$4,036
May 2010095771.124.24$4,053
Apr 2010095881.694.12$3,950
Mar 2010051078.394.39$2,238
Feb 2010033973.585.44$1,845
Jan 2010079674.365.96$4,747
Dec 2009092371.445.48$5,062
Nov 2009068474.593.75$2,566
Oct 2009079972.544.11$3,284
Sep 2009094065.543.06$2,881
Aug 200901,28467.423.22$4,133
Jul 200901,42761.133.46$4,944
Jun 2009049266.163.90$1,916
May 2009056254.743.93$2,206
Apr 2009035246.773.59$1,263
Mar 2009073542.144.06$2,983
Feb 2009040232.814.63$1,862
Jan 2009058635.865.37$3,147
Dec 2008042537.105.98$2,540
Nov 2008057155.496.86$3,917
Oct 2008067175.246.92$4,645
Sep 20080728101.767.88$5,735
Aug 20080127114.228.48$1,077
Jul 200802131.0811.39$23
Jun 20080186131.3313.03$2,424
May 20080576123.1711.57$6,667
Apr 2008092110.3110.45$962
Mar 20080148101.909.66$1,430
Feb 2008025492.538.77$2,228
Jan 2008023390.388.21$1,912
Dec 2007017288.337.30$1,256
Nov 2007034391.677.29$2,501
Oct 2007046782.856.92$3,233
Sep 2007024775.846.24$1,542
Aug 2007054169.066.39$3,456
Jul 2007048770.906.39$3,111
Jun 2007065262.007.55$4,922
May 2007083558.747.85$6,552
Apr 2007072459.617.81$5,651
Mar 2007057656.927.30$4,206
Feb 200701,01355.108.22$8,323
Jan 2007044350.306.73$2,980
Dec 2006097356.656.92$6,732
Nov 200601,03754.207.62$7,899
Oct 200601,08654.906.01$6,531
Sep 200601,11360.085.04$5,606
Aug 2006094968.717.34$6,966
Jul 200601,07169.376.34$6,793
Jun 200601,00966.286.38$6,441
May 2006091166.016.42$5,853
Apr 2006064064.397.36$4,711
Mar 2006053256.707.08$3,768
Feb 2006041357.597.75$3,201
Jan 2006052960.598.93$4,726
Dec 2005042254.9413.42$5,661
Nov 2005043054.6910.59$4,553
Oct 2005035658.3413.80$4,911
Sep 2005078761.4512.08$9,506
Aug 2005088661.519.80$8,680
Jul 2005035555.697.84$2,784
Jun 2005064752.337.38$4,776
May 2005061645.226.65$4,097
Apr 2005071249.207.36$5,241
Mar 2005074750.377.15$5,345
Feb 2005057045.226.31$3,598
Jan 2005064843.166.32$4,097
Dec 2004053939.866.75$3,639
Nov 2004081145.286.33$5,134
Oct 2004084649.706.52$5,512
Sep 2004063943.245.28$3,376
Aug 2004031042.375.55$1,721
Jul 2004027138.286.08$1,649
Jun 2004076336.106.43$4,908
May 2004082037.486.49$5,326
Apr 2004076234.475.86$4,464
Mar 2004033834.365.53$1,869
Feb 2004073732.455.51$4,061
Jan 2004075832.036.30$4,775
Dec 2003059530.266.30$3,749
Nov 2003090328.804.60$4,149
Oct 2003043228.174.76$2,056
Sep 2003054626.314.75$2,593
Aug 2003085429.765.13$4,381
Jul 2003069329.415.17$3,583
Jun 2003074828.565.98$4,475
May 2003069926.595.97$4,175
Apr 2003066026.675.41$3,569
Mar 2003051631.146.10$3,146
Feb 2003070533.487.93$5,588
Jan 2003094330.315.58$5,264
Dec 2002092726.914.85$4,499
Nov 200201,00624.664.14$4,162
Oct 200201,03926.464.23$4,394
Sep 200201,01127.443.64$3,675
Aug 200201,19525.963.16$3,781
Jul 200201,13524.583.06$3,475
Jun 200201,13223.733.34$3,779
May 2002076524.663.58$2,742
Apr 2002080423.653.51$2,824
Mar 2002099322.003.10$3,081
Feb 2002087518.222.38$2,079
Jan 2002097717.172.38$2,321
Dec 200101,00216.932.36$2,369
Nov 200101,07718.072.41$2,591
Oct 200101,19119.782.53$3,012
Sep 200101,18424.262.25$2,666
Aug 2001091424.873.05$2,791
Jul 2001089823.933.20$2,871
Jun 200101,08824.563.82$4,161
May 200101,02225.524.31$4,402
Apr 200101,04924.685.34$5,597
Mar 2001091324.545.38$4,909
Feb 2001071127.755.77$4,100
Jan 2001080127.478.40$6,727
Dec 2000063126.889.12$5,756
Nov 2000073532.215.66$4,159
Oct 2000093531.235.15$4,811
Sep 200001,03131.875.19$5,347
Aug 2000097429.644.54$4,423
Jul 2000096028.534.09$3,926
Jun 2000099329.304.40$4,366
May 200001,03627.263.68$3,812
Apr 200001,18224.513.12$3,683
Mar 2000077428.422.86$2,213
Feb 2000062527.622.73$1,704
Jan 2000055025.272.48$1,364
Dec 1999074424.282.42$1,803
Nov 1999083623.192.43$2,035
Oct 1999084720.982.80$2,375
Sep 1999098121.752.62$2,569
Aug 199901,50219.262.88$4,319
Jul 199901,40717.892.37$3,338
Jun 199914681115.942.36$4,243
May 199901,04315.792.32$2,421
Apr 199901,16115.102.21$2,564
Mar 199901,30912.471.84$2,406
Feb 199901,2519.981.82$2,274
Jan 199901,44610.381.90$2,747
Dec 199801,5139.201.77$2,683
Nov 1998083010.892.19$1,814
Oct 1998029112.421.97$573
Sep 199801,41712.592.08$2,951
Aug 199801,47611.301.91$2,815
Jul 199801,60711.742.24$3,595
Jun 199801,58611.242.24$3,548
May 199802,02112.622.21$4,459
Apr 1998084813.042.51$2,125
Mar 199801,05712.802.31$2,441
Feb 199801,61813.952.30$3,720
Jan 199801,76714.702.15$3,808
Dec 199702,00616.322.41$4,837
Nov 199702,19018.193.09$6,763
Oct 199702,39119.253.15$7,531
Sep 199702,29517.742.95$6,781
Aug 199702,61217.862.55$6,673
Jul 199702,99817.582.25$6,736
Jun 199702,77217.242.26$6,257
May 1997861,69018.972.31$5,533
Apr 199701,72317.882.08$3,589
Mar 199702,27218.951.94$4,406
Feb 199702,32820.492.21$5,135
Jan 199702,18223.483.54$7,724
Dec 199601,91523.32$0
Nov 199601,37121.97$0
Oct 199602,47923.31$0
Sep 199603,06822.22$0
Aug 199603,46320.26$0
Jul 199603,89119.55$0
Jun 199603,64918.73$0
May 199603,03819.43$0
Apr 199604,55221.51$0
Mar 199605,30019.38$0
Feb 199605,37216.98$0
Jan 199606,62117.07$0
Dec 199508,40817.19$0
Nov 1995010,54316.00$0
Oct 1995014,67115.43$0
Sep 1995015,37616.18$0
Aug 199513218,04515.92$2,101
Jul 1995015,70915.24$0
Jun 1995020,46116.41$0
May 19959545,59617.56$1,668
Apr 1995017,78917.73$0
Mar 19950016.44$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2015 — as filed, then multipliedworked
Condensate            40 bbl  × $ 56.15 =     $2,246
Gas                    0 Mcf  × $  2.88 =         $0

────────────────────────────────────────────────────
Month total                                   $2,246

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/153994 is the state's own key, not one this site invented.