UMPHRESS

Operated by WILLIAMS PROD. GULF COAST, L.P. (P-5 924558) in the GRANBURY, NE. (MARBLE FALLS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 163441District 7BField 36333400CondensateGasSaveExport
Value, all time
$1.7 M
May 1997 – Jun 2011
Value, last 12 filed months
$10 k
at the published price for each month
Months reported
170
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 71 leases and 71 wells, and the rule below applies to all of them.

Discovered
1979-09-20
as the register files it
Field class
Gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1989-04-03.

The Commission's schedule remark for this field reads: OPTIONAL ACREAGE OF 40 ACRES W/2100' DIAG.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,320 bbl$40,517
GasProduction519,383 Mcf$1,676,216
Total$1,716,733

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.5387, -97.7306. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.53868, -97.73061 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,710 ft
1 wells filed one
Completion to plug
14.1 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,710 ft.

Completions filed
May 1997
1 of 1 wells
Plug dates filed
Jun 2011
1 of 1 wells

Last completion to plug: a median of 14.1 years across the 1 well that filed both dates, with the middle half between 14.1 years and 14.1 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2213096415,710 ftMay 1997Jun 2011Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (170)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

170 months

Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 201103296.364.06$130
Feb 201107385.644.18$305
Jan 20110086.504.59$0
Dec 2010052285.734.35$2,270
Nov 2010032280.843.80$1,222
Oct 20100378.103.51$11
Sep 20100072.633.98$0
Aug 2010051873.684.42$2,289
Jul 2010076272.554.74$3,609
Jun 2010015770.364.91$771
May 2010029571.124.24$1,249
Apr 2010021781.694.12$895
Mar 2010033178.394.39$1,453
Feb 2010055673.585.44$3,026
Jan 2010053874.365.96$3,209
Dec 2009048871.445.48$2,676
Nov 2009053274.593.75$1,996
Oct 20090072.544.11$0
Sep 2009053965.543.06$1,652
Aug 2009055467.423.22$1,783
Jul 2009055161.133.46$1,909
Jun 2009053866.163.90$2,096
May 2009054854.743.93$2,151
Apr 2009052046.773.59$1,866
Mar 2009052442.144.06$2,127
Feb 2009047132.814.63$2,182
Jan 2009050335.865.37$2,702
Dec 2008051537.105.98$3,078
Nov 2008049455.496.86$3,389
Oct 2008051675.246.92$3,572
Sep 200820507101.767.88$6,029
Aug 20080479114.228.48$4,063
Jul 20080511131.0811.39$5,820
Jun 20080510131.3313.03$6,647
May 20080517123.1711.57$5,984
Apr 20080481110.3110.45$5,029
Mar 20080481101.909.66$4,648
Feb 2008047292.538.77$4,140
Jan 2008049590.388.21$4,062
Dec 2007038288.337.30$2,789
Nov 2007037591.677.29$2,734
Oct 2007042382.856.92$2,928
Sep 2007042375.846.24$2,641
Aug 2007045469.066.39$2,900
Jul 2007043170.906.39$2,753
Jun 2007039662.007.55$2,989
May 2007041158.747.85$3,225
Apr 2007036559.617.81$2,849
Mar 2007093556.927.30$6,827
Feb 2007046255.108.22$3,796
Jan 2007053050.306.73$3,565
Dec 2006032956.656.92$2,276
Nov 2006032454.207.62$2,468
Oct 2006046454.906.01$2,790
Sep 2006046760.085.04$2,352
Aug 2006066268.717.34$4,859
Jul 2006073869.376.34$4,681
Jun 2006038866.286.38$2,477
May 2006025466.016.42$1,632
Apr 2006040964.397.36$3,010
Mar 2006038056.707.08$2,692
Feb 2006039457.597.75$3,054
Jan 2006047560.598.93$4,243
Dec 2005049754.9413.42$6,667
Nov 2005051754.6910.59$5,474
Oct 2005067558.3413.80$9,312
Sep 2005069161.4512.08$8,347
Aug 2005071961.519.80$7,044
Jul 2005073655.697.84$5,773
Jun 2005067052.337.38$4,945
May 2005065545.226.65$4,357
Apr 2005064149.207.36$4,718
Mar 2005056150.377.15$4,014
Feb 2005052045.226.31$3,282
Jan 2005063443.166.32$4,008
Dec 200401,19239.866.75$8,047
Nov 200401,63545.286.33$10,350
Oct 2004086549.706.52$5,636
Sep 200403243.245.28$169
Aug 2004042642.375.55$2,365
Jul 2004064638.286.08$3,930
Jun 200401,37136.106.43$8,820
May 200401,82837.486.49$11,872
Apr 200401,00834.475.86$5,905
Mar 200401,06734.365.53$5,901
Feb 200401,44032.455.51$7,934
Jan 2004094632.036.30$5,959
Dec 200301,20530.266.30$7,593
Nov 200301,79728.804.60$8,258
Oct 200301,76128.174.76$8,382
Sep 20031331,34726.314.75$9,897
Aug 200301,73129.765.13$8,880
Jul 200301,62529.415.17$8,403
Jun 200301,84928.565.98$11,062
May 200302,21226.595.97$13,212
Apr 200301,89026.675.41$10,220
Mar 200301,39731.146.10$8,516
Feb 200301,37433.487.93$10,890
Jan 200301,66930.315.58$9,316
Dec 200201,96326.914.85$9,528
Nov 200203,15424.664.14$13,048
Oct 200202,14426.464.23$9,067
Sep 200201,54927.443.64$5,631
Aug 200201,85925.963.16$5,882
Jul 200202,24224.583.06$6,864
Jun 200202,23923.733.34$7,474
May 200202,21424.663.58$7,935
Apr 200201,94723.653.51$6,838
Mar 200202,41222.003.10$7,484
Feb 20021402,33018.222.38$8,086
Jan 200202,72417.172.38$6,471
Dec 200102,85916.932.36$6,760
Nov 200101,44718.072.41$3,481
Oct 200102,23519.782.53$5,652
Sep 200102,93124.262.25$6,599
Aug 200102,98124.873.05$9,101
Jul 200102,47223.933.20$7,903
Jun 200102,72924.563.82$10,436
May 200103,15225.524.31$13,577
Apr 200103,07824.685.34$16,422
Mar 20011552,02624.545.38$14,696
Feb 200103,26827.755.77$18,847
Jan 200103,42327.478.40$28,749
Dec 200002,59426.889.12$23,664
Nov 200003,11532.215.66$17,625
Oct 200004,15631.235.15$21,385
Sep 200004,23731.875.19$21,975
Aug 2000804,86429.644.54$24,457
Jul 200004,57028.534.09$18,690
Jun 200003,41029.304.40$14,995
May 200003,86027.263.68$14,204
Apr 200004,50324.513.12$14,031
Mar 200005,11928.422.86$14,639
Feb 200005,64427.622.73$15,388
Jan 20001605,69325.272.48$18,165
Dec 199906,17624.282.42$14,969
Nov 199905,38423.192.43$13,105
Oct 199906,07720.982.80$17,038
Sep 199904,43921.752.62$11,625
Aug 199905,77719.262.88$16,612
Jul 199908,24617.892.37$19,563
Jun 19991599,55415.942.36$25,102
May 1999010,13615.792.32$23,526
Apr 199909,69515.102.21$21,407
Mar 199914511,15512.471.84$22,315
Feb 199914410,5739.981.82$20,657
Jan 1999010,74510.381.90$20,415
Dec 1998012,7199.201.77$22,555
Nov 199816013,39510.892.19$31,020
Oct 1998012,80612.421.97$25,218
Sep 199809,96712.592.08$20,757
Aug 19982109,27411.301.91$20,062
Jul 1998012,94711.742.24$28,966
Jun 1998013,20811.242.24$29,550
May 199815812,69012.622.21$29,992
Apr 1998016,35613.042.51$40,977
Mar 199816516,48512.802.31$40,183
Feb 1998013,94113.952.30$32,052
Jan 199816814,38314.702.15$33,462
Dec 199716216,22216.322.41$41,757
Nov 1997017,59118.193.09$54,326
Oct 199716118,13519.253.15$60,221
Sep 1997012,51517.742.95$36,980
Aug 1997011,80717.862.55$30,164
Jul 199709,07017.582.25$20,380
Jun 19970017.242.26$0
May 19970018.972.31$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2011 — as filed, then multipliedworked
Condensate             0 bbl  × $ 96.36 =         $0
Gas                   32 Mcf  × $  4.06 =       $130

────────────────────────────────────────────────────
Month total                                     $130

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/163441 is the state's own key, not one this site invented.