CROMEENS

Operated by STAMPER OPERATING CO., INC. (P-5 812133) in the PALO PINTO CO. REG. (GAS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 170324District 7BField 68707333CondensateGasSaveExport
Value, all time
$377 k
Sep 1998 – Oct 2013
Value, last 12 filed months
$515
at the published price for each month
Months reported
182
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 710 leases and 710 wells, and the rule below applies to all of them.

Discovered
1957-10-15
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition94 bbl$2,306
GasProduction82,687 Mcf$374,507
Total$376,813

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.9834, -98.2090. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.98342, -98.20901 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,500 ft
1 wells filed one
Completion to plug
15.2 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,500 ft.

Completions filed
Sep 1998
1 of 1 wells
Plug dates filed
Nov 2013
1 of 1 wells

Last completion to plug: a median of 15.2 years across the 1 well that filed both dates, with the middle half between 15.2 years and 15.2 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-363336471A4,500 ftSep 1998Nov 2013Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (182)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

182 months

Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 2012014286.953.62$515
Oct 2012010289.383.40$347
Sep 2012020494.672.92$595
Aug 2012010392.662.91$300
Jul 201208785.133.02$263
Jun 201207579.822.52$189
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 201101194.144.52$50
Jun 20110092.904.64$0
May 201102698.134.40$115
Apr 2011011105.964.33$48
Mar 201101896.364.06$73
Feb 20110085.644.18$0
Jan 20110486.504.59$18
Dec 20100985.734.35$39
Nov 20100080.843.80$0
Oct 201004178.103.51$144
Sep 20100072.633.98$0
Aug 20100473.684.42$18
Jul 201003072.554.74$142
Jun 20100070.364.91$0
May 2010018771.124.24$792
Apr 2010014481.694.12$594
Mar 2010026478.394.39$1,159
Feb 2010026773.585.44$1,453
Jan 201007174.365.96$423
Dec 2009024871.445.48$1,360
Nov 2009024974.593.75$934
Oct 2009028372.544.11$1,163
Sep 2009035565.543.06$1,088
Aug 2009014867.423.22$476
Jul 2009045061.133.46$1,559
Jun 2009044566.163.90$1,733
May 2009082454.743.93$3,235
Apr 2009021846.773.59$782
Mar 200903542.144.06$142
Feb 2009024232.814.63$1,121
Jan 2009026135.865.37$1,402
Dec 2008019737.105.98$1,178
Nov 2008024455.496.86$1,674
Oct 2008024675.246.92$1,703
Sep 20080183101.767.88$1,442
Aug 200800114.228.48$0
Jul 2008081131.0811.39$923
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 2008055101.909.66$532
Feb 2008018592.538.77$1,623
Jan 2008023690.388.21$1,937
Dec 2007062788.337.30$4,578
Nov 2007012491.677.29$904
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 200709670.906.39$613
Jun 2007028662.007.55$2,159
May 2007033458.747.85$2,621
Apr 2007034459.617.81$2,685
Mar 2007049956.927.30$3,644
Feb 2007027855.108.22$2,284
Jan 2007045150.306.73$3,034
Dec 2006041256.656.92$2,850
Nov 2006051154.207.62$3,893
Oct 2006064754.906.01$3,891
Sep 2006070260.085.04$3,536
Aug 2006072368.717.34$5,307
Jul 2006047469.376.34$3,006
Jun 2006027466.286.38$1,749
May 2006036566.016.42$2,345
Apr 2006037664.397.36$2,768
Mar 2006028556.707.08$2,019
Feb 2006034757.597.75$2,690
Jan 2006054760.598.93$4,887
Dec 2005041654.9413.42$5,581
Nov 2005065654.6910.59$6,946
Oct 2005076258.3413.80$10,512
Sep 2005038461.4512.08$4,638
Aug 2005049061.519.80$4,800
Jul 2005059655.697.84$4,675
Jun 2005067752.337.38$4,997
May 2005037245.226.65$2,474
Apr 2005020549.207.36$1,509
Mar 2005030350.377.15$2,168
Feb 2005027045.226.31$1,704
Jan 2005040343.166.32$2,548
Dec 2004053439.866.75$3,605
Nov 2004061645.286.33$3,900
Oct 2004042149.706.52$2,743
Sep 2004056243.245.28$2,970
Aug 2004037042.375.55$2,054
Jul 2004050038.286.08$3,042
Jun 2004043836.106.43$2,818
May 2004055837.486.49$3,624
Apr 2004053234.475.86$3,117
Mar 2004069834.365.53$3,860
Feb 2004048432.455.51$2,667
Jan 2004031632.036.30$1,991
Dec 2003035330.266.30$2,224
Nov 2003036828.804.60$1,691
Oct 2003054728.174.76$2,604
Sep 2003061926.314.75$2,940
Aug 2003041229.765.13$2,113
Jul 2003053529.415.17$2,766
Jun 2003058028.565.98$3,470
May 2003067226.595.97$4,014
Apr 2003081526.675.41$4,407
Mar 2003096931.146.10$5,907
Feb 2003044033.487.93$3,487
Jan 2003029530.315.58$1,647
Dec 2002037426.914.85$1,815
Nov 2002055724.664.14$2,304
Oct 2002039926.464.23$1,687
Sep 2002047227.443.64$1,716
Aug 2002042925.963.16$1,357
Jul 2002021324.583.06$652
Jun 2002025323.733.34$845
May 2002031124.663.58$1,115
Apr 2002034523.653.51$1,212
Mar 2002038922.003.10$1,207
Feb 2002032918.222.38$782
Jan 2002038617.172.38$917
Dec 2001047816.932.36$1,130
Nov 200103318.072.41$79
Oct 2001046919.782.53$1,186
Sep 2001071124.262.25$1,601
Aug 2001073124.873.05$2,232
Jul 2001099523.933.20$3,181
Jun 20019389924.563.82$5,722
May 2001088325.524.31$3,803
Apr 2001082624.685.34$4,407
Mar 2001070524.545.38$3,790
Feb 2001077527.755.77$4,469
Jan 2001070127.478.40$5,888
Dec 2000076826.889.12$7,006
Nov 2000065732.215.66$3,717
Oct 2000089431.235.15$4,600
Sep 2000077231.875.19$4,004
Aug 2000089629.644.54$4,069
Jul 2000097828.534.09$4,000
Jun 200001,02329.304.40$4,498
May 2000096927.263.68$3,566
Apr 200001,09424.513.12$3,409
Mar 200001,16228.422.86$3,323
Feb 2000097127.622.73$2,647
Jan 200001,04625.272.48$2,595
Dec 199901,02224.282.42$2,477
Nov 199901,21723.192.43$2,962
Oct 199901,46720.982.80$4,113
Sep 199911,45421.752.62$3,830
Aug 199901,49319.262.88$4,293
Jul 199901,50417.892.37$3,568
Jun 199901,34315.942.36$3,172
May 199901,48315.792.32$3,442
Apr 199901,33115.102.21$2,939
Mar 199901,63012.471.84$2,996
Feb 199901,4959.981.82$2,718
Jan 199901,97710.381.90$3,756
Dec 199801,6299.201.77$2,889
Nov 199801,34310.892.19$2,935
Oct 199802,12912.421.97$4,192
Sep 199802,42212.592.08$5,044

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2012 — as filed, then multipliedworked
Condensate             0 bbl  × $ 86.95 =         $0
Gas                  142 Mcf  × $  3.62 =       $515

────────────────────────────────────────────────────
Month total                                     $515

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/170324 is the state's own key, not one this site invented.