CEDAR SPRINGS METHODIST CHURCH

Operated by 4W OPERATING, LLC (P-5 953506) in the BRAD, SW. (BIG SALINE CONGL.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 17354District 7BField 11197500NGPA filingGasSaveExport
Value, all time
$175 k
Jan 1993 – May 2026
Value, last 12 filed months
$5 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 36 leases and 36 wells, and the rule below applies to all of them.

Discovered
1959-01-29
as the register files it
Field class
Oil and gas
the register's own label
Between wells
2,640 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 160 acres.

The Commission's schedule remark for this field reads: AOF2 EFFECTIVELY 4/1/96.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction46,189 Mcf$175,491
Total$175,491

6,668 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.7539, -98.5187. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.75391, -98.51875 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
4,255 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,255 ft.

Completions filed
Oct 1959
1 of 1 wells

1 well

42-3630120314,255 ftOct 1959

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 2026105106.413.05$320
Apr 20269798.932.87$278
Mar 202610389.753.15$324
Feb 20269163.503.75$341
Jan 20269859.138.00$784
Dec 20258956.664.41$393
Nov 202510458.593.93$408
Oct 20258959.383.30$294
Sep 202511162.743.08$342
Aug 202511663.933.01$350
Jul 202511266.743.32$371
Jun 202510966.483.13$341
May 202512360.553.23$398
Apr 2025062.363.54$0
Mar 2025067.704.27$0
Feb 2025070.884.34$0
Jan 2025074.324.28$0
Dec 2024068.993.12$0
Nov 2024069.052.20$0
Oct 2024071.372.28$0
Sep 2024069.612.36$0
Aug 2024075.632.06$0
Jul 2024079.932.15$0
Jun 2024078.082.63$0
May 2024078.812.20$0
Apr 2024084.451.66$0
Mar 2024080.301.55$0
Feb 2024076.091.78$0
Jan 2024073.023.30$0
Dec 2023071.262.61$0
Nov 2023077.892.81$0
Oct 2023085.443.09$0
Sep 2023089.042.74$0
Aug 2023080.522.67$0
Jul 2023074.852.64$0
Jun 2023068.962.26$0
May 2023070.622.23$0
Apr 2023078.122.24$0
Mar 2023072.852.39$0
Feb 2023075.112.47$0
Jan 2023076.533.39$0
Dec 2022076.415.73$0
Nov 2022085.005.65$0
Oct 2022087.185.86$0
Sep 2022084.888.16$0
Aug 2022094.529.13$0
Jul 20220101.587.54$0
Jun 20220115.097.98$0
May 20220109.378.43$0
Apr 20220104.226.84$0
Mar 20220108.885.08$0
Feb 2022091.054.86$0
Jan 2022081.844.54$0
Dec 2021071.323.90$0
Nov 2021077.435.24$0
Oct 2021079.795.71$0
Sep 2021069.865.35$0
Aug 2021066.024.22$0
Jul 2021070.783.98$0
Jun 2021069.493.38$0
May 2021063.483.02$0
Apr 2021060.362.76$0
Mar 2021061.302.72$0
Feb 2021057.805.55$0
Jan 2021050.412.81$0
Dec 2020044.642.68$0
Nov 2020038.772.71$0
Oct 2020036.972.48$0
Sep 2020037.091.99$0
Aug 2020039.982.39$0
Jul 202017338.371.83$316
Jun 202016534.901.69$279
May 202015016.921.81$272
Apr 202015014.751.80$271
Mar 202015030.341.86$278
Feb 202015049.881.98$297
Jan 202015057.252.09$314
Dec 201915059.012.30$346
Nov 201915055.302.75$413
Oct 201915053.472.42$363
Sep 201915055.052.66$399
Aug 201915053.112.30$346
Jul 201915056.272.46$369
Jun 201915052.782.49$374
May 201915058.482.74$411
Apr 201915062.632.75$413
Mar 201915056.803.06$459
Feb 201915050.852.79$419
Jan 201915046.033.23$484
Dec 201815046.594.19$628
Nov 201815052.934.24$636
Oct 201815061.443.40$510
Sep 201815059.543.11$466
Aug 201815059.403.07$460
Jul 201815065.142.93$440
Jun 201815060.183.08$462
May 201815065.382.90$435
Apr 201815063.842.90$435
Mar 201817561.222.79$488
Feb 201815061.782.77$415
Jan 201815062.874.01$601
Dec 201712057.272.92$351
Nov 201712755.423.12$396
Oct 201712049.292.98$358
Sep 201710047.523.09$309
Aug 201710045.373.00$300
Jul 201710043.873.09$309
Jun 201710042.493.09$309
May 20175045.373.26$163
Apr 20175047.933.21$161
Mar 20175046.772.98$149
Feb 20172550.452.95$74
Jan 20172549.413.42$85
Dec 20165048.763.72$186
Nov 20165042.492.64$132
Oct 201610046.193.09$309
Sep 2016041.553.10$0
Aug 2016041.442.92$0
Jul 2016041.622.92$0
Jun 2016045.352.69$0
May 201615042.521.99$299
Apr 201615036.561.99$299
Mar 20169033.011.79$161
Feb 2016026.472.06$0
Jan 2016027.352.36$0
Dec 201510032.362.00$200
Nov 201515038.792.17$325
Oct 20155543.552.43$133
Sep 20155042.992.76$138
Aug 201510040.162.87$287
Jul 201515548.152.95$456
Jun 201515056.152.88$432
May 201515055.212.96$443
Apr 201515549.822.71$420
Mar 201515042.892.93$440
Feb 201515544.662.98$461
Jan 201515043.433.10$465
Dec 201415554.693.59$557
Nov 201415070.464.25$638
Oct 201415578.303.90$605
Sep 201415086.164.05$607
Aug 201415589.394.04$625
Jul 201415096.564.18$627
Jun 201415598.164.74$734
May 201415094.734.73$709
Apr 201415095.944.81$721
Mar 201415595.895.06$784
Feb 201415097.406.19$929
Jan 201415090.404.86$729
Dec 201315591.824.35$675
Nov 201315088.853.74$561
Oct 201315597.423.78$586
Sep 2013150104.113.72$558
Aug 2013150104.253.52$528
Jul 2013155102.523.72$576
Jun 201315094.403.93$590
May 201315094.834.15$622
Apr 201310093.964.28$428
Mar 201310093.623.91$391
Feb 201315591.233.42$530
Jan 201315091.603.42$513
Dec 201215086.773.42$513
Nov 201215586.953.62$562
Oct 201215089.383.40$510
Sep 201215094.672.92$438
Aug 201215592.662.91$451
Jul 201215085.133.02$453
Jun 201215579.822.52$390
May 201215091.612.49$373
Apr 2012150101.652.00$300
Mar 2012155105.052.22$344
Feb 2012150101.102.57$386
Jan 201215098.092.73$410
Dec 201115596.873.24$502
Nov 201115095.723.31$497
Oct 201115584.983.65$566
Sep 201115083.623.99$598
Aug 201115583.404.15$643
Jul 201115594.144.52$700
Jun 201115092.904.64$696
May 201115598.134.40$683
Apr 2011150105.964.33$650
Mar 201115596.364.06$629
Feb 201115085.644.18$627
Jan 201115586.504.59$711
Dec 201015585.734.35$674
Nov 201015080.843.80$569
Oct 201015578.103.51$544
Sep 201015072.633.98$597
Aug 201015073.684.42$663
Jul 201015572.554.74$734
Jun 201015570.364.91$761
May 201015071.124.24$635
Apr 201015081.694.12$618
Mar 201015578.394.39$680
Feb 201015073.585.44$816
Jan 201015574.365.96$924
Dec 200915071.445.48$823
Nov 200915574.593.75$581
Oct 200915072.544.11$617
Sep 200915565.543.06$475
Aug 200915067.423.22$483
Jul 200915561.133.46$537
Jun 200915066.163.90$584
May 200915554.743.93$608
Apr 200915546.773.59$556
Mar 200915042.144.06$609
Feb 200915532.814.63$718
Jan 200915035.865.37$806
Dec 200815537.105.98$926
Nov 200815055.496.86$1,029
Oct 200815075.246.92$1,038
Sep 2008155101.767.88$1,221
Aug 2008150114.228.48$1,272
Jul 2008155131.0811.39$1,765
Jun 2008150131.3313.03$1,955
May 2008155123.1711.57$1,794
Apr 2008155110.3110.45$1,621
Mar 2008150101.909.66$1,450
Feb 200810092.538.77$877
Jan 200815090.388.21$1,231
Dec 200715588.337.30$1,132
Nov 200715091.677.29$1,094
Oct 200715582.856.92$1,073
Sep 200715075.846.24$937
Aug 200715569.066.39$990
Jul 200715070.906.39$958
Jun 200715562.007.55$1,170
May 200715058.747.85$1,177
Apr 200715559.617.81$1,210
Mar 200715056.927.30$1,095
Feb 200715555.108.22$1,273
Jan 200715050.306.73$1,009
Dec 200615556.656.92$1,072
Nov 200615054.207.62$1,143
Oct 200615054.906.01$902
Sep 20065060.085.04$252
Aug 20064068.717.34$294
Jul 20063369.376.34$209
Jun 20065066.286.38$319
May 20065566.016.42$353
Apr 20065064.397.36$368
Mar 200610056.707.08$708
Feb 200615557.597.75$1,201
Jan 200615060.598.93$1,340
Dec 200515554.9413.42$2,079
Nov 200515054.6910.59$1,588
Oct 200515558.3413.80$2,138
Sep 200515061.4512.08$1,812
Aug 200515561.519.80$1,519
Jul 200515055.697.84$1,177
Jun 200515552.337.38$1,144
May 200515045.226.65$998
Apr 200515549.207.36$1,141
Mar 200515050.377.15$1,073
Feb 200515545.226.31$978
Jan 200515043.166.32$948
Dec 200415539.866.75$1,046
Nov 200415045.286.33$950
Oct 200415549.706.52$1,010
Sep 200415043.245.28$793
Aug 200415542.375.55$860
Jul 200415038.286.08$913
Jun 200415536.106.43$997
May 200415037.486.49$974
Apr 200415534.475.86$908
Mar 200415034.365.53$830
Feb 200415032.455.51$826
Jan 200415532.036.30$976
Dec 200315030.266.30$945
Nov 200315528.804.60$712
Oct 200315028.174.76$714
Sep 200315526.314.75$736
Aug 200315029.765.13$769
Jul 200315529.415.17$801
Jun 200315028.565.98$897
May 200315526.595.97$926
Apr 200315026.675.41$811
Mar 200315531.146.10$945
Feb 200315033.487.93$1,189
Jan 200315530.315.58$865
Dec 200215026.914.85$728
Nov 200215524.664.14$641
Oct 200215026.464.23$634
Sep 200215527.443.64$563
Aug 200215025.963.16$475
Jul 200215524.583.06$475
Jun 200215023.733.34$501
May 200215524.663.58$556
Apr 200215023.653.51$527
Mar 200215522.003.10$481
Feb 200215018.222.38$356
Jan 200215517.172.38$368
Dec 200115516.932.36$366
Nov 200115018.072.41$361
Oct 200115519.782.53$392
Sep 200115024.262.25$338
Aug 200115024.873.05$458
Jul 200115523.933.20$496
Jun 200114024.563.82$535
May 200114525.524.31$625
Apr 200115524.685.34$827
Mar 200115024.545.38$806
Feb 200115527.755.77$894
Jan 200115527.478.40$1,302
Dec 200015026.889.12$1,368
Nov 200015532.215.66$877
Oct 200015531.235.15$798
Sep 200015531.875.19$804
Aug 200015029.644.54$681
Jul 200015528.534.09$634
Jun 200015529.304.40$682
May 200015527.263.68$570
Apr 200015524.513.12$483
Mar 200015528.422.86$443
Feb 200014527.622.73$395
Jan 200015025.272.48$372
Dec 199915024.282.42$364
Nov 199915523.192.43$377
Oct 199915020.982.80$421
Sep 199915021.752.62$393
Aug 199915519.262.88$446
Jul 199915017.892.37$356
Jun 199915015.942.36$354
May 199915015.792.32$348
Apr 199915515.102.21$342
Mar 199915012.471.84$276
Feb 19991559.981.82$282
Jan 199915010.381.90$285
Dec 19981509.201.77$266
Nov 199817010.892.19$372
Oct 199813012.421.97$256
Sep 199815012.592.08$312
Aug 199815011.301.91$286
Jul 19982811.742.24$63
Jun 19982511.242.24$56
May 199815012.622.21$331
Apr 199815013.042.51$376
Mar 19982812.802.31$65
Feb 19983013.952.30$69
Jan 19983514.702.15$75
Dec 19973016.322.41$72
Nov 19973018.193.09$93
Oct 19973119.253.15$98
Sep 199715017.742.95$443
Aug 19973117.862.55$79
Jul 19973017.582.25$67
Jun 19973017.242.26$68
May 19973018.972.31$69
Apr 19973017.882.08$62
Mar 199712018.951.94$233
Feb 199714020.492.21$309
Jan 199714323.483.54$506
Dec 199613623.32$0
Nov 199616321.97$0
Oct 199618723.31$0
Sep 199615522.22$0
Aug 199615520.26$0
Jul 19969019.55$0
Jun 19969018.73$0
May 19969019.43$0
Apr 199615021.51$0
Mar 199612019.38$0
Feb 199614016.98$0
Jan 199615517.07$0
Dec 199515517.19$0
Nov 19959016.00$0
Oct 19959015.43$0
Sep 199515016.18$0
Aug 19951015.92$0
Jul 199515515.24$0
Jun 199515016.41$0
May 199515517.56$0
Apr 199515017.73$0
Mar 199515516.44$0
Feb 199514016.58$0
Jan 199515515.92$0
Dec 199415515.03$0
Nov 199415015.90$0
Oct 199415015.58$0
Sep 199415015.29$0
Aug 199415516.13$0
Jul 199415517.56$0
Jun 199415017.09$0
May 199415515.88$0
Apr 199415014.14$0
Mar 199415512.46$0
Feb 199414012.50$0
Jan 199415512.66$0
Dec 199315512.33$0
Nov 199315014.49$0
Oct 199315515.85$0
Sep 199315015.03$0
Aug 199315515.66$0
Jul 199315015.46$0
Jun 199315016.79$0
May 199315517.68$0
Apr 199315018.05$0
Mar 199315518.14$0
Feb 19933017.90$0
Jan 199310716.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Gas                  105 Mcf  × $  3.05 =       $320

────────────────────────────────────────────────────
Month total                                     $320

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/17354 is the state's own key, not one this site invented.