WHITE

Operated by SOJOURNER DRILLING CORPORATION (P-5 800750) in the NOODLE, W. (PALO PINTO) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 177022District 7BField 65827600Hydrogen sulphide fieldCondensateGasSaveExport
Value, all time
$392 k
Apr 2000 – Nov 2002
Value, last 12 filed months
$25 k
at the published price for each month
Months reported
32
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 14 leases and 14 wells, and the rule below applies to all of them.

Discovered
1954-08-15
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 06/01/98.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,551 bbl$40,622
GasProduction81,300 Mcf$351,372
Total$391,994

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.5842, -100.0958. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.58425, -100.09582 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
4,420 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,420 ft.

Completions filed
Dec 2002
1 of 1 wells

1 well

42-2533449814,420 ftDec 2002Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (32)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

32 months

Nov 200209724.664.14$401
Oct 2002018726.464.23$791
Sep 2002028227.443.64$1,025
Aug 2002036225.963.16$1,145
Jul 2002038324.583.06$1,173
Jun 2002031823.733.34$1,062
May 200201324.663.58$47
Apr 2002036023.653.51$1,264
Mar 200201,34822.003.10$4,182
Feb 20021861,29918.222.38$6,475
Jan 200201,27917.172.38$3,038
Dec 200101,65316.932.36$3,908
Nov 200101,71418.072.41$4,123
Oct 20011612,20819.782.53$8,768
Sep 200102,82724.262.25$6,364
Aug 200104724.873.05$144
Jul 2001096723.933.20$3,092
Jun 200101,50624.563.82$5,759
May 200101,78925.524.31$7,706
Apr 20011022,14524.685.34$13,962
Mar 20011262,54224.545.38$16,759
Feb 2001912,46127.755.77$16,718
Jan 200102,94427.478.40$24,726
Dec 20001012,53826.889.12$25,868
Nov 200002,32432.215.66$13,149
Oct 2000802,95431.235.15$17,698
Sep 2000793,74731.875.19$21,952
Aug 20001786,24029.644.54$33,610
Jul 20002479,07728.534.09$44,170
Jun 20002008,43329.304.40$42,942
May 2000011,00327.263.68$40,488
Apr 200006,25324.513.12$19,484

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2002 — as filed, then multipliedworked
Condensate             0 bbl  × $ 24.66 =         $0
Gas                   97 Mcf  × $  4.14 =       $401

────────────────────────────────────────────────────
Month total                                     $401

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/177022 is the state's own key, not one this site invented.