CLAYPOOL-BOWEN

Operated by PK GATH & OILFIELD SVCS, INC. (P-5 631388) in the P.K. DAM (CONGL. 3820) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 195461District 7BField 68136500CondensateGasSaveExport
Value, all time
$401 k
May 2003 – May 2026
Value, last 12 filed months
$6 k
at the published price for each month
Months reported
277
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 18 leases and 18 wells, and the rule below applies to all of them.

Discovered
1978-04-04
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres.

The Commission's schedule remark for this field reads: NET GOR 1000 MCF/DAY PER WELL

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition182 bbl$6,001
GasProduction74,689 Mcf$394,521
Total$400,522

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.9026, -98.3031. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.90264, -98.30313 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
4,190 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,190 ft.

Completions filed
May 2003
1 of 1 wells

1 well

42-3633516114,190 ftMay 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (277)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

277 months

May 20260153106.413.05$466
Apr 2026011998.932.87$342
Mar 2026015489.753.15$485
Feb 2026012863.503.75$480
Jan 2026012559.138.00$1,000
Dec 2025014756.664.41$649
Nov 2025014558.593.93$569
Oct 2025014859.383.30$489
Sep 2025013662.743.08$418
Aug 2025013963.933.01$419
Jul 2025014366.743.32$474
Jun 2025013766.483.13$429
May 202509860.553.23$317
Apr 202509262.363.54$326
Mar 2025015467.704.27$657
Feb 202509970.884.34$430
Jan 2025015074.324.28$642
Dec 2024014168.993.12$440
Nov 2024014969.052.20$328
Oct 2024013871.372.28$315
Sep 2024015569.612.36$366
Aug 2024013975.632.06$287
Jul 2024013679.932.15$292
Jun 2024014078.082.63$369
May 2024013578.812.20$297
Apr 2024013184.451.66$217
Mar 2024014480.301.55$223
Feb 2024013676.091.78$243
Jan 2024015773.023.30$518
Dec 2023014771.262.61$384
Nov 2023013477.892.81$376
Oct 2023014785.443.09$454
Sep 2023012989.042.74$353
Aug 2023014280.522.67$380
Jul 2023015374.852.64$404
Jun 2023014868.962.26$334
May 2023014870.622.23$330
Apr 2023015478.122.24$345
Mar 2023015672.852.39$373
Feb 2023013675.112.47$335
Jan 2023016476.533.39$556
Dec 2022016976.415.73$968
Nov 2022026685.005.65$1,502
Oct 2022034087.185.86$1,994
Sep 202209884.888.16$800
Aug 2022011494.529.13$1,041
Jul 20220123101.587.54$928
Jun 2022091115.097.98$726
May 20220178109.378.43$1,501
Apr 20220157104.226.84$1,074
Mar 20220160108.885.08$812
Feb 2022016191.054.86$782
Jan 2022017081.844.54$771
Dec 2021019371.323.90$753
Nov 2021017877.435.24$932
Oct 2021018579.795.71$1,057
Sep 2021016469.865.35$878
Aug 2021019166.024.22$806
Jul 2021021170.783.98$840
Jun 2021023769.493.38$801
May 2021020063.483.02$604
Apr 2021017560.362.76$483
Mar 2021016461.302.72$446
Feb 2021011857.805.55$655
Jan 2021014950.412.81$419
Dec 2020017044.642.68$455
Nov 2020020138.772.71$544
Oct 2020015536.972.48$384
Sep 2020015337.091.99$305
Aug 2020015139.982.39$360
Jul 2020016538.371.83$301
Jun 2020018034.901.69$304
May 2020020416.921.81$370
Apr 2020020414.751.80$368
Mar 2020010230.341.86$189
Feb 2020015749.881.98$311
Jan 2020016057.252.09$335
Dec 2019016859.012.30$387
Nov 2019015855.302.75$435
Oct 2019026853.472.42$648
Sep 2019021455.052.66$569
Aug 2019011453.112.30$263
Jul 2019018456.272.46$453
Jun 2019014352.782.49$356
May 2019019458.482.74$532
Apr 201909562.632.75$261
Mar 2019017356.803.06$530
Feb 2019013250.852.79$369
Jan 2019015846.033.23$510
Dec 2018014646.594.19$611
Nov 2018014852.934.24$627
Oct 2018015661.443.40$530
Sep 2018017159.543.11$531
Aug 2018017859.403.07$546
Jul 2018018465.142.93$539
Jun 2018018760.183.08$575
May 2018016865.382.90$487
Apr 2018019163.842.90$554
Mar 2018028561.222.79$794
Feb 20180361.782.77$8
Jan 2018014762.874.01$589
Dec 2017020257.272.92$590
Nov 2017020055.423.12$624
Oct 2017015849.292.98$471
Sep 2017012747.523.09$392
Aug 2017012645.373.00$379
Jul 2017012943.873.09$398
Jun 2017018642.493.09$574
May 2017019645.373.26$640
Apr 2017014247.933.21$456
Mar 2017017446.772.98$519
Feb 2017016450.452.95$484
Jan 2017019749.413.42$674
Dec 2016017848.763.72$663
Nov 2016015942.492.64$420
Oct 2016015046.193.09$464
Sep 2016011941.553.10$369
Aug 2016015541.442.92$453
Jul 2016015441.622.92$450
Jun 2016014745.352.69$395
May 2016015942.521.99$317
Apr 2016016036.561.99$319
Mar 2016014233.011.79$255
Feb 2016014626.472.06$301
Jan 2016016227.352.36$383
Dec 2015016632.362.00$332
Nov 2015014538.792.17$314
Oct 2015015943.552.43$386
Sep 2015015842.992.76$436
Aug 2015015540.162.87$445
Jul 2015016348.152.95$480
Jun 2015015456.152.88$444
May 2015015455.212.96$455
Apr 2015016349.822.71$441
Mar 2015016142.892.93$472
Feb 2015014544.662.98$432
Jan 2015015443.433.10$478
Dec 2014015954.693.59$571
Nov 2014017070.464.25$723
Oct 2014014078.303.90$546
Sep 2014014286.164.05$574
Aug 2014014889.394.04$597
Jul 2014015596.564.18$648
Jun 2014014998.164.74$706
May 2014015794.734.73$742
Apr 2014014995.944.81$717
Mar 2014016395.895.06$824
Feb 2014014097.406.19$867
Jan 2014016590.404.86$802
Dec 2013014791.824.35$640
Nov 2013015488.853.74$576
Oct 2013016797.423.78$631
Sep 20130421104.113.72$1,565
Aug 20130148104.253.52$521
Jul 20130140102.523.72$520
Jun 2013014594.403.93$570
May 2013014094.834.15$581
Apr 2013014493.964.28$617
Mar 2013014593.623.91$567
Feb 2013013291.233.42$451
Jan 2013014991.603.42$510
Dec 2012015086.773.42$513
Nov 2012017886.953.62$645
Oct 201209889.383.40$333
Sep 2012014894.672.92$432
Aug 2012014992.662.91$433
Jul 2012012785.133.02$384
Jun 2012012779.822.52$320
May 2012013991.612.49$346
Apr 20120137101.652.00$274
Mar 20120153105.052.22$340
Feb 20120132101.102.57$339
Jan 2012016798.092.73$457
Dec 2011012596.873.24$405
Nov 2011018495.723.31$609
Oct 2011012784.983.65$463
Sep 2011014083.623.99$558
Aug 2011013983.404.15$577
Jul 2011015194.144.52$682
Jun 2011014592.904.64$673
May 2011016698.134.40$731
Apr 20110192105.964.33$832
Mar 20110496.364.06$16
Feb 2011014585.644.18$606
Jan 2011015586.504.59$711
Dec 2010015585.734.35$674
Nov 2010014380.843.80$543
Oct 2010010778.103.51$375
Sep 2010012672.633.98$501
Aug 2010012973.684.42$570
Jul 2010013572.554.74$639
Jun 2010012470.364.91$609
May 2010014571.124.24$614
Apr 2010014381.694.12$590
Mar 2010014878.394.39$650
Feb 2010015873.585.44$860
Jan 2010019674.365.96$1,169
Dec 2009015571.445.48$850
Nov 2009026774.593.75$1,002
Oct 2009020972.544.11$859
Sep 2009019065.543.06$582
Aug 2009011967.423.22$383
Jul 20091617061.133.46$1,567
Jun 2009024166.163.90$939
May 2009029154.743.93$1,142
Apr 2009031246.773.59$1,119
Mar 2009026142.144.06$1,059
Feb 2009025432.814.63$1,177
Jan 2009031435.865.37$1,686
Dec 2008019237.105.98$1,148
Nov 2008028255.496.86$1,935
Oct 2008030975.246.92$2,139
Sep 20080289101.767.88$2,276
Aug 20080310114.228.48$2,630
Jul 20080319131.0811.39$3,633
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 2008030792.538.77$2,693
Jan 2008027490.388.21$2,248
Dec 20070088.337.30$0
Nov 2007017291.677.29$1,254
Oct 2007019482.856.92$1,343
Sep 2007047575.846.24$2,966
Aug 2007022669.066.39$1,444
Jul 2007064370.906.39$4,107
Jun 2007057962.007.55$4,371
May 2007057258.747.85$4,488
Apr 2007057059.617.81$4,449
Mar 2007057356.927.30$4,184
Feb 2007025655.108.22$2,103
Jan 2007028150.306.73$1,890
Dec 2006037256.656.92$2,574
Nov 2006035754.207.62$2,719
Oct 2006039054.906.01$2,345
Sep 2006038960.085.04$1,959
Aug 2006040368.717.34$2,958
Jul 2006040469.376.34$2,562
Jun 2006041366.286.38$2,637
May 2006039466.016.42$2,531
Apr 2006040764.397.36$2,996
Mar 2006040556.707.08$2,869
Feb 2006038757.597.75$3,000
Jan 2006041060.598.93$3,663
Dec 2005041354.9413.42$5,541
Nov 2005042854.6910.59$4,532
Oct 2005038858.3413.80$5,353
Sep 2005042861.4512.08$5,170
Aug 2005042661.519.80$4,173
Jul 2005043755.697.84$3,428
Jun 2005043752.337.38$3,226
May 2005049145.226.65$3,266
Apr 2005051249.207.36$3,769
Mar 2005054650.377.15$3,907
Feb 2005054145.226.31$3,415
Jan 2005065643.166.32$4,147
Dec 2004060639.866.75$4,091
Nov 2004051845.286.33$3,279
Oct 2004076249.706.52$4,965
Sep 2004086943.245.28$4,592
Aug 2004099242.375.55$5,506
Jul 200401,13738.286.08$6,918
Jun 200401,34336.106.43$8,640
May 200401,60737.486.49$10,437
Apr 200401,76834.475.86$10,358
Mar 200401,96234.365.53$10,850
Feb 200402,22632.455.51$12,264
Jan 200403,05732.036.30$19,258
Dec 20031663,76530.266.30$28,749
Nov 2003025728.804.60$1,181
Oct 2003052528.174.76$2,499
Sep 2003050426.314.75$2,394
Aug 2003063829.765.13$3,273
Jul 2003090729.415.17$4,690
Jun 2003014928.565.98$891
May 2003050726.595.97$3,028

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  153 Mcf  × $  3.05 =       $466

────────────────────────────────────────────────────
Month total                                     $466

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/195461 is the state's own key, not one this site invented.