HAMILTON UNIT

Operated by CORDA CORPORATION (P-5 177997) in the PALO PINTO CO. REG. (GAS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 196483District 7BField 68707333GasSaveExport
Value, all time
$181 k
Jun 2003 – Sep 2018
Value, last 12 filed months
$1 k
at the published price for each month
Months reported
184
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 710 leases and 710 wells, and the rule below applies to all of them.

Discovered
1957-10-15
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction30,707 Mcf$180,991
Total$180,991

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.5820, -98.3699. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.58199, -98.36990 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
3,500 ft
1 wells filed one
Completion to plug
15.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,500 ft.

Completions filed
Jun 2003
1 of 1 wells
Plug dates filed
Sep 2018
1 of 1 wells

Last completion to plug: a median of 15.3 years across the 1 well that filed both dates, with the middle half between 15.3 years and 15.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3633516833,500 ftJun 2003Sep 2018Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (184)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

184 months

Sep 20181159.543.11$34
Aug 20184259.403.07$129
Jul 20184265.142.93$123
Jun 20187060.183.08$215
May 20185165.382.90$148
Apr 20182963.842.90$84
Mar 20183261.222.79$89
Feb 20182361.782.77$64
Jan 20185562.874.01$221
Dec 20172357.272.92$67
Nov 20172555.423.12$78
Oct 20173649.292.98$107
Sep 20174447.523.09$136
Aug 20174045.373.00$120
Jul 20174843.873.09$148
Jun 20173342.493.09$102
May 20175445.373.26$176
Apr 20174447.933.21$141
Mar 20175946.772.98$176
Feb 20174450.452.95$130
Jan 20172349.413.42$79
Dec 20166248.763.72$231
Nov 20166142.492.64$161
Oct 20167046.193.09$216
Sep 20166441.553.10$198
Aug 20164441.442.92$129
Jul 20166641.622.92$193
Jun 20166445.352.69$172
May 20167042.521.99$139
Apr 20164436.561.99$88
Mar 20166933.011.79$124
Feb 20166526.472.06$134
Jan 20167227.352.36$170
Dec 20157032.362.00$140
Nov 20157438.792.17$160
Oct 20157343.552.43$177
Sep 20157242.992.76$199
Aug 20157640.162.87$218
Jul 20157848.152.95$230
Jun 20156756.152.88$193
May 20157455.212.96$219
Apr 20156749.822.71$181
Mar 20156742.892.93$197
Feb 20155644.662.98$167
Jan 20157043.433.10$217
Dec 20143654.693.59$129
Nov 20147270.464.25$306
Oct 20147478.303.90$289
Sep 20147486.164.05$299
Aug 20147889.394.04$315
Jul 20147796.564.18$322
Jun 20147398.164.74$346
May 20148794.734.73$411
Apr 20147695.944.81$365
Mar 20147095.895.06$354
Feb 20144397.406.19$266
Jan 20146790.404.86$326
Dec 20137491.824.35$322
Nov 20137288.853.74$269
Oct 20137997.423.78$299
Sep 201377104.113.72$286
Aug 201377104.253.52$271
Jul 201379102.523.72$294
Jun 20137394.403.93$287
May 20137594.834.15$311
Apr 20137893.964.28$334
Mar 20138293.623.91$321
Feb 20136891.233.42$233
Jan 20137591.603.42$256
Dec 20127886.773.42$267
Nov 20126386.953.62$228
Oct 20127289.383.40$245
Sep 20127494.672.92$216
Aug 20129892.662.91$285
Jul 201212985.133.02$390
Jun 201213079.822.52$327
May 201214991.612.49$371
Apr 2012141101.652.00$282
Mar 2012144105.052.22$320
Feb 2012140101.102.57$360
Jan 20127598.092.73$205
Dec 201112396.873.24$398
Nov 201111095.723.31$364
Oct 201111284.983.65$409
Sep 201110583.623.99$419
Aug 20118883.404.15$365
Jul 20118694.144.52$388
Jun 20118092.904.64$371
May 20117498.134.40$326
Apr 201166105.964.33$286
Mar 20115896.364.06$235
Feb 20116385.644.18$263
Jan 20116486.504.59$294
Dec 20105385.734.35$230
Nov 20105180.843.80$194
Oct 20105578.103.51$193
Sep 20105372.633.98$211
Aug 20105773.684.42$252
Jul 20105872.554.74$275
Jun 20105770.364.91$280
May 20106871.124.24$288
Apr 20106181.694.12$251
Mar 20105878.394.39$255
Feb 20105373.585.44$288
Jan 20105574.365.96$328
Dec 20094671.445.48$252
Nov 20094574.593.75$169
Oct 20094072.544.11$164
Sep 20094065.543.06$123
Aug 20093467.423.22$109
Jul 20094461.133.46$152
Jun 20092666.163.90$101
May 20091254.743.93$47
Apr 20094946.773.59$176
Mar 20099842.144.06$398
Feb 200911732.814.63$542
Jan 20098135.865.37$435
Dec 20086937.105.98$412
Nov 20088355.496.86$569
Oct 20082975.246.92$201
Sep 200842101.767.88$331
Aug 200833114.228.48$280
Jul 20080131.0811.39$0
Jun 200845131.3313.03$586
May 200820123.1711.57$231
Apr 200813110.3110.45$136
Mar 20081101.909.66$10
Feb 2008092.538.77$0
Jan 20086290.388.21$509
Dec 200714988.337.30$1,088
Nov 200718091.677.29$1,313
Oct 200719282.856.92$1,329
Sep 200718275.846.24$1,136
Aug 200722969.066.39$1,463
Jul 200719970.906.39$1,271
Jun 200722862.007.55$1,721
May 200722558.747.85$1,765
Apr 200720759.617.81$1,616
Mar 200725556.927.30$1,862
Feb 200717055.108.22$1,397
Jan 200720050.306.73$1,345
Dec 200620256.656.92$1,398
Nov 200619354.207.62$1,470
Oct 200620154.906.01$1,209
Sep 200619460.085.04$977
Aug 200618268.717.34$1,336
Jul 200621569.376.34$1,364
Jun 200618566.286.38$1,181
May 20068066.016.42$514
Apr 200620364.397.36$1,494
Mar 200634756.707.08$2,458
Feb 200638357.597.75$2,969
Jan 200641060.598.93$3,663
Dec 200541954.9413.42$5,621
Nov 200537354.6910.59$3,949
Oct 200536758.3413.80$5,063
Sep 200533961.4512.08$4,095
Aug 200540261.519.80$3,938
Jul 200537955.697.84$2,973
Jun 200543352.337.38$3,196
May 200545945.226.65$3,053
Apr 200538349.207.36$2,819
Mar 200546050.377.15$3,291
Feb 200543145.226.31$2,720
Jan 200544843.166.32$2,832
Dec 200446939.866.75$3,166
Nov 200439345.286.33$2,488
Oct 200440849.706.52$2,658
Sep 200437243.245.28$1,966
Aug 200440142.375.55$2,226
Jul 200451138.286.08$3,109
Jun 200454836.106.43$3,525
May 200462637.486.49$4,066
Apr 200483234.475.86$4,874
Mar 200466634.365.53$3,683
Feb 200453032.455.51$2,920
Jan 200468032.036.30$4,284
Dec 200387430.266.30$5,508
Nov 200374128.804.60$3,405
Oct 200380928.174.76$3,851
Sep 20031,35226.314.75$6,421
Aug 20031,46129.765.13$7,495
Jul 200374129.415.17$3,832
Jun 2003028.565.98$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2018 — as filed, then multipliedworked
Gas                   11 Mcf  × $  3.11 =        $34

────────────────────────────────────────────────────
Month total                                      $34

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/196483 is the state's own key, not one this site invented.