KING-ROSEBROUGH

Operated by MCCLYMOND, LTD. (P-5 541455) in the STEPHENS COUNTY REGULAR (GAS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 199559District 7BField 85948100GasSaveExport
Value, all time
$60 k
Jan 2004 – May 2007
Value, last 12 filed months
$0
at the published price for each month
Months reported
41
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 635 leases and 635 wells, and the rule below applies to all of them.

Discovered
1943-12-02
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: FIELD CHANGED FROM EXEMPT TO PRORATED EFFECTIVE 07/01/22.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction8,370 Mcf$59,633
Total$59,633

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.8941, -98.6405. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.89408, -98.64045 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,300 ft
1 wells filed one
Completion to plug
3.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,300 ft.

Completions filed
Jan 2004
1 of 1 wells
Plug dates filed
May 2007
1 of 1 wells

Last completion to plug: a median of 3.3 years across the 1 well that filed both dates, with the middle half between 3.3 years and 3.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4293603414,300 ftJan 2004May 2007Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (41)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

41 months

May 2007058.747.85$0
Apr 2007059.617.81$0
Mar 2007056.927.30$0
Feb 2007055.108.22$0
Jan 2007050.306.73$0
Dec 2006056.656.92$0
Nov 2006054.207.62$0
Oct 2006054.906.01$0
Sep 2006060.085.04$0
Aug 2006068.717.34$0
Jul 2006069.376.34$0
Jun 2006066.286.38$0
May 2006066.016.42$0
Apr 20065064.397.36$368
Mar 200618256.707.08$1,289
Feb 200613357.597.75$1,031
Jan 200617260.598.93$1,537
Dec 200515254.9413.42$2,039
Nov 200525654.6910.59$2,711
Oct 200527458.3413.80$3,780
Sep 200534961.4512.08$4,216
Aug 200511461.519.80$1,117
Jul 20056155.697.84$478
Jun 20058452.337.38$620
May 200530045.226.65$1,995
Apr 200533749.207.36$2,480
Mar 200534750.377.15$2,483
Feb 200530345.226.31$1,913
Jan 200529443.166.32$1,859
Dec 200435639.866.75$2,403
Nov 200435645.286.33$2,254
Oct 200439149.706.52$2,547
Sep 200444643.245.28$2,357
Aug 200459742.375.55$3,314
Jul 200481438.286.08$4,953
Jun 200444036.106.43$2,831
May 200431637.486.49$2,052
Apr 200437534.475.86$2,197
Mar 200459934.365.53$3,313
Feb 200427232.455.51$1,499
Jan 2004032.036.30$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2006 — as filed, then multipliedworked
Gas                   50 Mcf  × $  7.36 =       $368

────────────────────────────────────────────────────
Month total                                     $368

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/199559 is the state's own key, not one this site invented.