W.A. GRAGG -G-

Operated by WAYOP, LLC (P-5 102750) in the STRONG (CONGL.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 208449District 7BField 86718500CondensateGasSaveExport
Value, all time
$2.3 M
Jan 2005 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
257
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 10 leases and 10 wells, and the rule below applies to all of them.

Discovered
1954-10-14
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: EFFECTIVE 6/1/95.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition461 bbl$26,889
GasProduction314,046 Mcf$2,236,113
Total$2,263,002

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.9312, -98.5637. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.93123, -98.56374 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
4,250 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,250 ft.

Completions filed
Jan 2005
1 of 1 wells

1 well

42-3633532824,250 ftJan 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (257)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

257 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 2024015669.612.36$369
Aug 202408475.632.06$173
Jul 202408479.932.15$180
Jun 2024016178.082.63$424
May 202401,48478.812.20$3,262
Apr 202401,02484.451.66$1,699
Mar 2024035580.301.55$549
Feb 202439576.091.78$398
Jan 202405373.023.30$175
Dec 202305671.262.61$146
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 202302089.042.74$55
Aug 2023019180.522.67$511
Jul 202304574.852.64$119
Jun 2023012368.962.26$278
May 2023012270.622.23$272
Apr 202309178.122.24$204
Mar 20230072.852.39$0
Feb 20230375.112.47$7
Jan 2023014876.533.39$501
Dec 2022016876.415.73$962
Nov 2022015385.005.65$864
Oct 2022016687.185.86$973
Sep 2022010584.888.16$857
Aug 20220694.529.13$55
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202202104.226.84$14
Mar 202201108.885.08$5
Feb 2022011091.054.86$534
Jan 202206381.844.54$286
Dec 202108971.323.90$347
Nov 2021011177.435.24$581
Oct 2021013279.795.71$754
Sep 2021012069.865.35$642
Aug 2021020166.024.22$848
Jul 202107170.783.98$283
Jun 202106769.493.38$227
May 202107263.483.02$217
Apr 202108460.362.76$232
Mar 202109161.302.72$247
Feb 202107157.805.55$394
Jan 2021030550.412.81$857
Dec 202005944.642.68$158
Nov 202008938.772.71$241
Oct 20200036.972.48$0
Sep 202006837.091.99$135
Aug 20200839.982.39$19
Jul 2020024838.371.83$453
Jun 20200034.901.69$0
May 2020017816.921.81$323
Apr 20200014.751.80$0
Mar 2020019830.341.86$368
Feb 20200049.881.98$0
Jan 2020020857.252.09$436
Dec 2019024459.012.30$562
Nov 2019029055.302.75$798
Oct 2019029453.472.42$711
Sep 2019025755.052.66$683
Aug 20190053.112.30$0
Jul 201901356.272.46$32
Jun 2019022552.782.49$561
May 2019024858.482.74$680
Apr 2019029362.632.75$806
Mar 2019032656.803.06$998
Feb 2019031550.852.79$880
Jan 2019029146.033.23$939
Dec 2018024746.594.19$1,034
Nov 2018028052.934.24$1,186
Oct 2018039961.443.40$1,356
Sep 2018078659.543.11$2,443
Aug 2018048359.403.07$1,481
Jul 2018059765.142.93$1,750
Jun 2018079260.183.08$2,437
May 201806865.382.90$197
Apr 201801863.842.90$52
Mar 201804661.222.79$128
Feb 201806861.782.77$188
Jan 201801862.874.01$72
Dec 201702257.272.92$64
Nov 201702255.423.12$69
Oct 201702549.292.98$75
Sep 201702147.523.09$65
Aug 201702445.373.00$72
Jul 201702143.873.09$65
Jun 201702442.493.09$74
May 201702845.373.26$91
Apr 201703647.933.21$116
Mar 201702346.772.98$69
Feb 201702150.452.95$62
Jan 201702349.413.42$79
Dec 201602148.763.72$78
Nov 201602042.492.64$53
Oct 201602046.193.09$62
Sep 201602041.553.10$62
Aug 2016031841.442.92$930
Jul 2016037241.622.92$1,088
Jun 2016037445.352.69$1,005
May 2016030142.521.99$599
Apr 2016036236.561.99$721
Mar 2016026233.011.79$470
Feb 2016034326.472.06$708
Jan 2016029027.352.36$686
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 201505343.552.43$129
Sep 2015029342.992.76$808
Aug 2015048040.162.87$1,379
Jul 2015048948.152.95$1,440
Jun 2015048756.152.88$1,404
May 2015038255.212.96$1,129
Apr 2015031649.822.71$855
Mar 2015035742.892.93$1,048
Feb 2015025344.662.98$753
Jan 2015033143.433.10$1,026
Dec 2014024954.693.59$894
Nov 2014030170.464.25$1,280
Oct 201404678.303.90$179
Sep 2014044686.164.05$1,804
Aug 2014023589.394.04$948
Jul 2014035096.564.18$1,463
Jun 201408998.164.74$422
May 2014023294.734.73$1,097
Apr 2014031695.944.81$1,520
Mar 2014036295.895.06$1,831
Feb 2014028197.406.19$1,740
Jan 2014033990.404.86$1,648
Dec 2013035391.824.35$1,537
Nov 2013037888.853.74$1,413
Oct 2013047297.423.78$1,784
Sep 20130469104.113.72$1,744
Aug 20130534104.253.52$1,881
Jul 20130276102.523.72$1,026
Jun 2013037894.403.93$1,487
May 2013051194.834.15$2,120
Apr 2013051393.964.28$2,197
Mar 2013043693.623.91$1,706
Feb 2013034091.233.42$1,163
Jan 2013029391.603.42$1,002
Dec 2012035286.773.42$1,204
Nov 2012033786.953.62$1,222
Oct 2012051289.383.40$1,741
Sep 2012041894.672.92$1,220
Aug 2012048992.662.91$1,422
Jul 2012048785.133.02$1,471
Jun 2012072679.822.52$1,829
May 201201,09991.612.49$2,735
Apr 20120399101.652.00$797
Mar 20120658105.052.22$1,462
Feb 2012067101.102.57$172
Jan 2012074498.092.73$2,034
Dec 2011058496.873.24$1,892
Nov 2011057695.723.31$1,907
Oct 2011074584.983.65$2,718
Sep 201101,29183.623.99$5,146
Aug 2011079183.404.15$3,282
Jul 201101,02194.144.52$4,612
Jun 2011094892.904.64$4,399
May 2011064798.134.40$2,850
Apr 20110932105.964.33$4,039
Mar 2011099596.364.06$4,037
Feb 2011072685.644.18$3,035
Jan 2011039986.504.59$1,831
Dec 201001,10085.734.35$4,783
Nov 201001,25180.843.80$4,748
Oct 201001,40578.103.51$4,930
Sep 2010097072.633.98$3,860
Aug 201001,10573.684.42$4,883
Jul 201001,24972.554.74$5,916
Jun 201001,41570.364.91$6,948
May 201001,65871.124.24$7,022
Apr 201001,69381.694.12$6,980
Mar 201001,66778.394.39$7,316
Feb 201001,30273.585.44$7,086
Jan 2010067074.365.96$3,996
Dec 200901,48571.445.48$8,143
Nov 200902,95474.593.75$11,082
Oct 200903,19572.544.11$13,132
Sep 200902,15365.543.06$6,598
Aug 200901,94067.423.22$6,244
Jul 200902,39661.133.46$8,301
Jun 200901,92066.163.90$7,478
May 200902,21454.743.93$8,692
Apr 20090246.773.59$7
Mar 200902,37442.144.06$9,636
Feb 200902,15632.814.63$9,989
Jan 200901,06735.865.37$5,731
Dec 200801,80837.105.98$10,807
Nov 200803,05255.496.86$20,938
Oct 200802,30975.246.92$15,983
Sep 200803,047101.767.88$24,001
Aug 200802,614114.228.48$22,175
Jul 200801,877131.0811.39$21,378
Jun 200802,564131.3313.03$33,416
May 200804,530123.1711.57$52,432
Apr 200805,030110.3110.45$52,588
Mar 200802,380101.909.66$23,000
Feb 2008103,03692.538.77$27,553
Jan 200801,46890.388.21$12,046
Dec 200701,55388.337.30$11,340
Nov 200702,05491.677.29$14,977
Oct 200702,65782.856.92$18,392
Sep 200703,26775.846.24$20,400
Aug 200701,42469.066.39$9,096
Jul 200701,82070.906.39$11,626
Jun 200702,92562.007.55$22,079
May 200703,01358.747.85$23,641
Apr 20071813,31059.617.81$36,625
Mar 200704,70756.927.30$34,370
Feb 200704,21255.108.22$34,606
Jan 200702,66850.306.73$17,947
Dec 200603,76056.656.92$26,013
Nov 200603,80754.207.62$29,000
Oct 200605,01054.906.01$30,129
Sep 200605,24760.085.04$26,430
Aug 200605,84968.717.34$42,931
Jul 200605,81869.376.34$36,902
Jun 200605,98166.286.38$38,182
May 200607,15566.016.42$45,971
Apr 200608,12964.397.36$59,833
Mar 200608,36456.707.08$59,242
Feb 200608,57057.597.75$66,427
Jan 200608,52860.598.93$76,183
Dec 200508,19754.9413.42$109,966
Nov 200508,43654.6910.59$89,324
Oct 200506,69758.3413.80$92,390
Sep 20051779,87661.4512.08$130,169
Aug 2005010,85161.519.80$106,306
Jul 200509,79155.697.84$76,797
Jun 200509,05352.337.38$66,821
May 20059011,56545.226.65$80,990
Apr 2005011,98349.207.36$88,201
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2024 — as filed, then multipliedworked
Condensate             0 bbl  × $ 69.61 =         $0
Gas                  156 Mcf  × $  2.36 =       $369

────────────────────────────────────────────────────
Month total                                     $369

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/208449 is the state's own key, not one this site invented.