STRIEGLER

Operated by PETEX (P-5 659782) in the PITZ (DUFFER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 209110District 7BField 71777100CondensateGasSaveExport
Value, all time
$1.3 M
Apr 2005 – May 2026
Value, last 12 filed months
$4 k
at the published price for each month
Months reported
254
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 113 leases and 114 wells, and the rule below applies to all of them.

Discovered
1989-12-12
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: OPERATORS AND PURCHASERS IN THIS FIELD

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,583 bbl$125,704
GasProduction220,459 Mcf$1,207,580
Total$1,333,284

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.6411, -98.8326. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.64109, -98.83261 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,195 ft
1 wells filed one
Completion to plug
1 well filed both, dated out of order

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,195 ft.

Completions filed
Apr 2005
1 of 1 wells
Plug dates filed
Sep 1984
1 of 1 wells

Last completion to plug: no median is published. 1 well on this lease filed both dates, and on that one the last completion is dated after the plug date, so there is no interval to take a median of. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4293417824,195 ftApr 2005Sep 1984

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (254)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

254 months

May 2026055106.413.05$168
Apr 202607298.932.87$207
Mar 202607889.753.15$246
Feb 202605763.503.75$214
Jan 202608459.138.00$672
Dec 202507356.664.41$322
Nov 202507058.593.93$275
Oct 202507759.383.30$254
Sep 202509162.743.08$280
Aug 2025010463.933.01$314
Jul 2025011366.743.32$375
Jun 202508166.483.13$253
May 2025010860.553.23$349
Apr 202509562.363.54$337
Mar 202509867.704.27$418
Feb 202507170.884.34$308
Jan 2025168574.324.28$1,553
Dec 2024013968.993.12$434
Nov 2024013869.052.20$303
Oct 2024015671.372.28$356
Sep 2024014669.612.36$345
Aug 2024015575.632.06$320
Jul 2024017279.932.15$369
Jun 2024014978.082.63$392
May 2024013678.812.20$299
Apr 2024012184.451.66$201
Mar 2024016480.301.55$253
Feb 2024015176.091.78$269
Jan 2024013873.023.30$455
Dec 2023016671.262.61$433
Nov 2023020377.892.81$570
Oct 2023023585.443.09$726
Sep 2023531889.042.74$4,768
Aug 2023019280.522.67$513
Jul 2023010574.852.64$277
Jun 202305968.962.26$133
May 202306470.622.23$143
Apr 2023016678.122.24$371
Mar 2023016472.852.39$392
Feb 20230175.112.47$2
Jan 20230276.533.39$7
Dec 202203376.415.73$189
Nov 202204485.005.65$248
Oct 202201487.185.86$82
Sep 202201684.888.16$131
Aug 20220394.529.13$27
Jul 202205101.587.54$38
Jun 202209115.097.98$72
May 20220148109.378.43$1,248
Apr 20220127104.226.84$868
Mar 20220236108.885.08$1,198
Feb 2022023191.054.86$1,122
Jan 202206381.844.54$286
Dec 202101571.323.90$58
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 202101966.024.22$80
Jul 202101370.783.98$52
Jun 20210369.493.38$10
May 202105163.483.02$154
Apr 202104560.362.76$124
Mar 202109561.302.72$258
Feb 2021011757.805.55$649
Jan 202109850.412.81$275
Dec 2020011144.642.68$297
Nov 2020014638.772.71$395
Oct 2020018836.972.48$466
Sep 2020014637.091.99$291
Aug 202006339.982.39$150
Jul 202003238.371.83$58
Jun 2020010834.901.69$183
May 202005716.921.81$103
Apr 2020011714.751.80$211
Mar 2020022830.341.86$423
Feb 2020024949.881.98$493
Jan 2020027257.252.09$570
Dec 2019027559.012.30$634
Nov 2019026655.302.75$732
Oct 2019028453.472.42$687
Sep 2019030055.052.66$797
Aug 2019031653.112.30$728
Jul 2019032556.272.46$800
Jun 2019030852.782.49$767
May 2019032858.482.74$899
Apr 2019032162.632.75$883
Mar 2019032856.803.06$1,004
Feb 2019030050.852.79$838
Jan 2019031246.033.23$1,007
Dec 2018032946.594.19$1,377
Nov 2018034052.934.24$1,441
Oct 2018037261.443.40$1,264
Sep 2018017759.543.11$550
Aug 2018039759.403.07$1,217
Jul 2018036965.142.93$1,082
Jun 2018033860.183.08$1,040
May 2018047365.382.90$1,372
Apr 2018025763.842.90$746
Mar 201811521561.222.79$7,639
Feb 201804461.782.77$122
Jan 201803062.874.01$120
Dec 2017020257.272.92$590
Nov 2017029655.423.12$923
Oct 2017034949.292.98$1,041
Sep 2017020547.523.09$633
Aug 2017031045.373.00$931
Jul 2017033743.873.09$1,040
Jun 2017033642.493.09$1,037
May 2017036045.373.26$1,175
Apr 2017036247.933.21$1,163
Mar 2017039746.772.98$1,185
Feb 2017036450.452.95$1,075
Jan 2017042249.413.42$1,443
Dec 2016041848.763.72$1,556
Nov 2016032642.492.64$862
Oct 2016046246.193.09$1,428
Sep 2016041241.553.10$1,277
Aug 2016043741.442.92$1,278
Jul 2016055941.622.92$1,635
Jun 2016057545.352.69$1,544
May 2016060842.521.99$1,211
Apr 2016058936.561.99$1,173
Mar 2016063833.011.79$1,145
Feb 2016059826.472.06$1,234
Jan 2016065027.352.36$1,537
Dec 2015065832.362.00$1,317
Nov 2015060638.792.17$1,313
Oct 2015066143.552.43$1,604
Sep 2015065042.992.76$1,793
Aug 2015058140.162.87$1,669
Jul 2015076648.152.95$2,256
Jun 2015072356.152.88$2,084
May 2015079355.212.96$2,344
Apr 2015076249.822.71$2,062
Mar 2015081742.892.93$2,398
Feb 2015075644.662.98$2,250
Jan 2015075043.433.10$2,325
Dec 2014079554.693.59$2,855
Nov 2014077370.464.25$3,287
Oct 2014085978.303.90$3,351
Sep 2014082786.164.05$3,346
Aug 2014089689.394.04$3,615
Jul 2014091796.564.18$3,833
Jun 2014094498.164.74$4,472
May 2014097394.734.73$4,599
Apr 2014090895.944.81$4,367
Mar 2014097295.895.06$4,915
Feb 2014099997.406.19$6,186
Jan 2014076790.404.86$3,728
Dec 2013070091.824.35$3,048
Nov 2013078388.853.74$2,927
Oct 2013075897.423.78$2,865
Sep 20130905104.113.72$3,365
Aug 20131711,062104.253.52$21,568
Jul 201301,097102.523.72$4,078
Jun 201301,09694.403.93$4,311
May 201301,15194.834.15$4,776
Apr 201301,11493.964.28$4,771
Mar 201301,15693.623.91$4,523
Feb 201301,05891.233.42$3,618
Jan 201301,18491.603.42$4,049
Dec 201201,17386.773.42$4,012
Nov 201201,19886.953.62$4,343
Oct 201201,26289.383.40$4,290
Sep 201201,25394.672.92$3,657
Aug 201201,32692.662.91$3,856
Jul 201201,35085.133.02$4,078
Jun 201201,34879.822.52$3,396
May 20121021,48191.612.49$13,029
Apr 201201,071101.652.00$2,139
Mar 201201,154105.052.22$2,564
Feb 201201,186101.102.57$3,048
Jan 20121751,34398.092.73$20,838
Dec 201101,37396.873.24$4,448
Nov 201101,36095.723.31$4,503
Oct 201101,45084.983.65$5,290
Sep 201101,43283.623.99$5,708
Aug 201101,52283.404.15$6,315
Jul 20111091,52194.144.52$17,132
Jun 201101,50292.904.64$6,969
May 201101,58198.134.40$6,964
Apr 201101,559105.964.33$6,756
Mar 201101,61596.364.06$6,553
Feb 201101,45685.644.18$6,086
Jan 201101,61686.504.59$7,415
Dec 201001,63885.734.35$7,122
Nov 201001,62080.843.80$6,148
Oct 201001,69078.103.51$5,930
Sep 201001,67272.633.98$6,654
Aug 201001,76073.684.42$7,778
Jul 201001,79372.554.74$8,493
Jun 201001,70670.364.91$8,377
May 201001,79571.124.24$7,602
Apr 20101651,74581.694.12$20,673
Mar 201001,81178.394.39$7,948
Feb 201001,63873.585.44$8,915
Jan 201001,83474.365.96$10,938
Dec 200901,85771.445.48$10,183
Nov 200901,81174.593.75$6,794
Oct 200901,89272.544.11$7,777
Sep 200901,86365.543.06$5,710
Aug 200901,95167.423.22$6,279
Jul 200901,96061.133.46$6,790
Jun 200901,93166.163.90$7,521
May 200901,94554.743.93$7,636
Apr 200901,91046.773.59$6,852
Mar 200901,98242.144.06$8,045
Feb 200901,79132.814.63$8,298
Jan 200901,99035.865.37$10,688
Dec 200802,01537.105.98$12,044
Nov 200801,96155.496.86$13,453
Oct 200802,08775.246.92$14,446
Sep 200801,983101.767.88$15,620
Aug 200801,968114.228.48$16,695
Jul 200802,226131.0811.39$25,353
Jun 200801,882131.3313.03$24,527
May 200802,146123.1711.57$24,838
Apr 200802,083110.3110.45$21,777
Mar 200802,129101.909.66$20,575
Feb 20081032,01092.538.77$27,159
Jan 200802,12190.388.21$17,404
Dec 200702,14588.337.30$15,663
Nov 200702,09291.677.29$15,254
Oct 200702,19682.856.92$15,201
Sep 200702,04375.846.24$12,757
Aug 20071612,21269.066.39$25,249
Jul 200702,18170.906.39$13,932
Jun 200702,11362.007.55$15,950
May 200702,19758.747.85$17,238
Apr 200702,09759.617.81$16,368
Mar 200702,19856.927.30$16,050
Feb 200701,92855.108.22$15,840
Jan 200702,11150.306.73$14,200
Dec 200602,15756.656.92$14,923
Nov 200602,07554.207.62$15,806
Oct 200602,18054.906.01$13,110
Sep 20061642,10760.085.04$20,467
Aug 200602,14868.717.34$15,766
Jul 200602,16869.376.34$13,751
Jun 200601,95866.286.38$12,500
May 200602,08766.016.42$13,409
Apr 200601,97864.397.36$14,559
Mar 200602,17056.707.08$15,370
Feb 200602,01757.597.75$15,634
Jan 200602,28360.598.93$20,395
Dec 20051032,04854.9413.42$33,134
Nov 200501,75454.6910.59$18,572
Oct 20051462,06958.3413.80$37,061
Sep 200501,39861.4512.08$16,886
Aug 200501,41861.519.80$13,892
Jul 200501,89155.697.84$14,832
Jun 2005076252.337.38$5,624
May 2005043845.226.65$2,913
Apr 2005042549.207.36$3,128

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   55 Mcf  × $  3.05 =       $168

────────────────────────────────────────────────────
Month total                                     $168

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/209110 is the state's own key, not one this site invented.