MCCANLIES

Operated by PETEX (P-5 659782) in the BLOOMQUIST (LAKE SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 217883District 7BField 09689500GasSaveExport
Value, all time
$1.5 M
Jun 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
240
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 25 leases and 34 wells, and the rule below applies to all of them.

Discovered
1951-10-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1990-07-09.

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 09/01/2006.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction381,911 Mcf$1,543,427
Total$1,543,427

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.5429, -99.0581. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.54291, -99.05809 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
4,116 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,116 ft.

Completions filed
Mar 1991
1 of 1 wells

1 well

42-4293527544,116 ftMar 1991

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (240)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

240 months

May 20260106.413.05$0
Apr 2026098.932.87$0
Mar 2026089.753.15$0
Feb 2026063.503.75$0
Jan 2026059.138.00$0
Dec 2025056.664.41$0
Nov 2025058.593.93$0
Oct 2025059.383.30$0
Sep 2025062.743.08$0
Aug 2025063.933.01$0
Jul 2025066.743.32$0
Jun 2025066.483.13$0
May 2025060.553.23$0
Apr 2025062.363.54$0
Mar 2025067.704.27$0
Feb 2025070.884.34$0
Jan 2025074.324.28$0
Dec 2024068.993.12$0
Nov 2024069.052.20$0
Oct 2024071.372.28$0
Sep 2024069.612.36$0
Aug 2024075.632.06$0
Jul 2024179.932.15$2
Jun 20244278.082.63$111
May 202421078.812.20$462
Apr 20249384.451.66$154
Mar 20246880.301.55$105
Feb 202421676.091.78$385
Jan 202425573.023.30$841
Dec 202338271.262.61$997
Nov 202340477.892.81$1,134
Oct 202350885.443.09$1,568
Sep 202367189.042.74$1,835
Aug 202378280.522.67$2,090
Jul 202379674.852.64$2,103
Jun 202384568.962.26$1,908
May 202388570.622.23$1,971
Apr 20231,29378.122.24$2,893
Mar 20231,54572.852.39$3,697
Feb 202342175.112.47$1,038
Jan 202340076.533.39$1,355
Dec 202239176.415.73$2,240
Nov 202241585.005.65$2,343
Oct 20229987.185.86$581
Sep 2022084.888.16$0
Aug 20226794.529.13$612
Jul 20220101.587.54$0
Jun 2022340115.097.98$2,712
May 2022443109.378.43$3,736
Apr 2022441104.226.84$3,015
Mar 2022476108.885.08$2,416
Feb 202216991.054.86$821
Jan 202248781.844.54$2,210
Dec 202150571.323.90$1,969
Nov 202150477.435.24$2,639
Oct 202157179.795.71$3,263
Sep 202157169.865.35$3,055
Aug 202163566.024.22$2,680
Jul 202166770.783.98$2,656
Jun 202156569.493.38$1,910
May 202160563.483.02$1,826
Apr 202159360.362.76$1,636
Mar 202167361.302.72$1,829
Feb 202162957.805.55$3,490
Jan 202181150.412.81$2,279
Dec 202086744.642.68$2,320
Nov 20201,82038.772.71$4,926
Oct 20201,13636.972.48$2,816
Sep 202092537.091.99$1,842
Aug 202099739.982.39$2,378
Jul 202099338.371.83$1,812
Jun 20201,07334.901.69$1,814
May 20201,25316.921.81$2,274
Apr 20201,35514.751.80$2,445
Mar 20202,40530.341.86$4,464
Feb 20202,20949.881.98$4,375
Jan 20202,38557.252.09$4,996
Dec 20192,38659.012.30$5,498
Nov 20192,32555.302.75$6,395
Oct 20192,48853.472.42$6,017
Sep 20192,41955.052.66$6,428
Aug 20192,31653.112.30$5,337
Jul 20191,20256.272.46$2,957
Jun 20191,86052.782.49$4,634
May 20191,33058.482.74$3,645
Apr 20192,23862.632.75$6,156
Mar 20192,31056.803.06$7,073
Feb 20192,11750.852.79$5,911
Jan 20192,32446.033.23$7,502
Dec 20182,26646.594.19$9,484
Nov 20182,17952.934.24$9,233
Oct 20182,21261.443.40$7,517
Sep 20182,13659.543.11$6,639
Aug 20182,22859.403.07$6,832
Jul 20182,23765.142.93$6,559
Jun 20182,19860.183.08$6,763
May 20182,28965.382.90$6,640
Apr 20182,20963.842.90$6,408
Mar 20182,28961.222.79$6,379
Feb 20182,07961.782.77$5,751
Jan 20182,36162.874.01$9,466
Dec 20172,30257.272.92$6,725
Nov 20172,28255.423.12$7,116
Oct 20172,36349.292.98$7,050
Sep 20172,28847.523.09$7,064
Aug 20172,38945.373.00$7,178
Jul 20172,36943.873.09$7,314
Jun 20172,28142.493.09$7,042
May 20172,37945.373.26$7,764
Apr 20172,28547.933.21$7,339
Mar 20172,36546.772.98$7,056
Feb 20172,13450.452.95$6,301
Jan 20172,44349.413.42$8,352
Dec 20162,41448.763.72$8,987
Nov 20162,33442.492.64$6,172
Oct 20162,44646.193.09$7,559
Sep 20162,32641.553.10$7,212
Aug 20162,44441.442.92$7,147
Jul 20162,44241.622.92$7,141
Jun 20162,37645.352.69$6,382
May 20162,42642.521.99$4,830
Apr 20162,30736.561.99$4,593
Mar 20162,41733.011.79$4,336
Feb 20162,23726.472.06$4,616
Jan 20162,34627.352.36$5,547
Dec 20152,40632.362.00$4,815
Nov 20152,35138.792.17$5,095
Oct 20152,47843.552.43$6,013
Sep 20152,41142.992.76$6,651
Aug 20152,52440.162.87$7,250
Jul 20152,51048.152.95$7,392
Jun 20152,46056.152.88$7,092
May 20152,48955.212.96$7,356
Apr 20152,30349.822.71$6,233
Mar 2015042.892.93$0
Feb 20152,19044.662.98$6,518
Jan 20152,28443.433.10$7,082
Dec 20142,31054.693.59$8,296
Nov 20142,25170.464.25$9,571
Oct 20142,34178.303.90$9,132
Sep 20142,26686.164.05$9,167
Aug 20142,35789.394.04$9,511
Jul 20142,35496.564.18$9,839
Jun 20142,27698.164.74$10,781
May 20142,36194.734.73$11,159
Apr 20142,43495.944.81$11,705
Mar 20142,07795.895.06$10,503
Feb 20142,23797.406.19$13,852
Jan 20142,41290.404.86$11,724
Dec 20132,50691.824.35$10,912
Nov 20131,96288.853.74$7,335
Oct 20132,40797.423.78$9,097
Sep 20132,342104.113.72$8,707
Aug 20132,375104.253.52$8,366
Jul 20132,321102.523.72$8,629
Jun 20132,19494.403.93$8,630
May 20132,26094.834.15$9,377
Apr 20131,98893.964.28$8,514
Mar 201388693.623.91$3,467
Feb 20131,12691.233.42$3,851
Jan 20131,34291.603.42$4,590
Dec 20121,10786.773.42$3,786
Nov 20121,34286.953.62$4,865
Oct 20121,63489.383.40$5,555
Sep 20121,20794.672.92$3,523
Aug 20121,37892.662.91$4,007
Jul 20121,68085.133.02$5,075
Jun 20121,80979.822.52$4,557
May 20121,64491.612.49$4,091
Apr 20121,947101.652.00$3,888
Mar 20122,074105.052.22$4,609
Feb 20121,948101.102.57$5,007
Jan 20122,16398.092.73$5,914
Dec 20112,24396.873.24$7,267
Nov 20111,76195.723.31$5,831
Oct 20111,94584.983.65$7,096
Sep 20112,08483.623.99$8,306
Aug 20112,12683.404.15$8,821
Jul 20112,20194.144.52$9,942
Jun 20112,17492.904.64$10,087
May 20112,30098.134.40$10,131
Apr 20112,292105.964.33$9,932
Mar 20112,39596.364.06$9,717
Feb 20112,07385.644.18$8,665
Jan 20112,39986.504.59$11,008
Dec 20102,33385.734.35$10,143
Nov 20102,37080.843.80$8,995
Oct 20102,43778.103.51$8,551
Sep 20102,35972.633.98$9,388
Aug 20102,49473.684.42$11,022
Jul 20102,10372.554.74$9,961
Jun 20102,37370.364.91$11,652
May 20102,52771.124.24$10,702
Apr 20102,29881.694.12$9,474
Mar 20102,69778.394.39$11,836
Feb 20102,56673.585.44$13,965
Jan 20103,04574.365.96$18,161
Dec 20092,98971.445.48$16,391
Nov 20092,38574.593.75$8,947
Oct 20092,21572.544.11$9,104
Sep 20092,44665.543.06$7,496
Aug 20092,58867.423.22$8,329
Jul 20092,42861.133.46$8,412
Jun 20093,02066.163.90$11,763
May 20092,13454.743.93$8,378
Apr 20092,84046.773.59$10,189
Mar 20092,23842.144.06$9,084
Feb 20092,19432.814.63$10,165
Jan 20092,20435.865.37$11,838
Dec 20082,65337.105.98$15,857
Nov 20081,58455.496.86$10,867
Oct 20081,84375.246.92$12,757
Sep 20082,140101.767.88$16,857
Aug 20082,090114.228.48$17,730
Jul 20082,785131.0811.39$31,720
Jun 20082,419131.3313.03$31,526
May 20081,521123.1711.57$17,605
Apr 20081,434110.3110.45$14,992
Mar 20081,128101.909.66$10,901
Feb 20081,41192.538.77$12,375
Jan 20081,46290.388.21$11,997
Dec 20072,70288.337.30$19,730
Nov 200722991.677.29$1,670
Oct 20071,39382.856.92$9,642
Sep 20071,68075.846.24$10,490
Aug 20071,79569.066.39$11,466
Jul 20072,04870.906.39$13,083
Jun 20071,60462.007.55$12,108
May 20071,52758.747.85$11,981
Apr 20071,53759.617.81$11,997
Mar 20071,20256.927.30$8,777
Feb 20071,43055.108.22$11,749
Jan 20071,44850.306.73$9,740
Dec 20061,53056.656.92$10,585
Nov 20061,36754.207.62$10,413
Oct 20061,54454.906.01$9,285
Sep 20061,71660.085.04$8,644
Aug 20061,61968.717.34$11,883
Jul 20061,89869.376.34$12,039
Jun 20061,88766.286.38$12,046

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2024 — as filed, then multipliedworked
Gas                    1 Mcf  × $  2.15 =         $2

────────────────────────────────────────────────────
Month total                                       $2

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/217883 is the state's own key, not one this site invented.