F. GREEN

Operated by PITCOCK, INC. (P-5 665870) in the PALO PINTO CO. REG. (GAS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 223674District 7BField 68707333CondensateGasSaveExport
Value, all time
$268 k
Dec 2006 – Apr 2022
Value, last 12 filed months
$0
at the published price for each month
Months reported
185
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 710 leases and 710 wells, and the rule below applies to all of them.

Discovered
1957-10-15
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition37 bbl$1,371
GasProduction37,944 Mcf$266,265
Total$267,636

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.7922, -98.4653. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.79217, -98.46534 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,618 ft
1 wells filed one
Completion to plug
14.5 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,618 ft.

Completions filed
Oct 2007
1 of 1 wells
Plug dates filed
Apr 2022
1 of 1 wells

Last completion to plug: a median of 14.5 years across the 1 well that filed both dates, with the middle half between 14.5 years and 14.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3633535994,618 ftOct 2007Apr 2022Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (185)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

185 months

Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 201636936.561.99$1,334
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150232.362.00$4
Nov 20150438.792.17$9
Oct 201501343.552.43$32
Sep 201504042.992.76$110
Aug 201505640.162.87$161
Jul 201507148.152.95$209
Jun 201505556.152.88$159
May 201506055.212.96$177
Apr 201505449.822.71$146
Mar 201505142.892.93$150
Feb 201505044.662.98$149
Jan 201505043.433.10$155
Dec 201405454.693.59$194
Nov 201406570.464.25$276
Oct 201409578.303.90$371
Sep 201408486.164.05$340
Aug 201407189.394.04$286
Jul 201406396.564.18$263
Jun 201406898.164.74$322
May 201406894.734.73$321
Apr 201407195.944.81$341
Mar 201406595.895.06$329
Feb 201405597.406.19$341
Jan 201407690.404.86$369
Dec 201306191.824.35$266
Nov 201305888.853.74$217
Oct 201306197.423.78$231
Sep 2013079104.113.72$294
Aug 2013081104.253.52$285
Jul 2013066102.523.72$245
Jun 201307294.403.93$283
May 201308594.834.15$353
Apr 201307593.964.28$321
Mar 201305393.623.91$207
Feb 201306191.233.42$209
Jan 201306091.603.42$205
Dec 201205786.773.42$195
Nov 201206186.953.62$221
Oct 201207689.383.40$258
Sep 201208794.672.92$254
Aug 201208792.662.91$253
Jul 2012011685.133.02$350
Jun 2012011779.822.52$295
May 2012015691.612.49$388
Apr 20120226101.652.00$451
Mar 20120245105.052.22$544
Feb 20120233101.102.57$599
Jan 2012023298.092.73$634
Dec 2011026096.873.24$842
Nov 2011051795.723.31$1,712
Oct 2011057384.983.65$2,091
Sep 2011044483.623.99$1,770
Aug 2011080383.404.15$3,332
Jul 2011027394.144.52$1,233
Jun 201106192.904.64$283
May 201108998.134.40$392
Apr 2011044105.964.33$191
Mar 2011016296.364.06$657
Feb 201105985.644.18$247
Jan 2011010186.504.59$463
Dec 201003585.734.35$152
Nov 201008780.843.80$330
Oct 201008278.103.51$288
Sep 201008372.633.98$330
Aug 201009473.684.42$415
Jul 2010010572.554.74$497
Jun 201008870.364.91$432
May 201009071.124.24$381
Apr 201009781.694.12$400
Mar 201009578.394.39$417
Feb 201009473.585.44$512
Jan 201009274.365.96$549
Dec 2009017671.445.48$965
Nov 2009012774.593.75$476
Oct 2009011372.544.11$464
Sep 2009014065.543.06$429
Aug 2009014267.423.22$457
Jul 2009017061.133.46$589
Jun 2009030566.163.90$1,188
May 20091154.743.93$59
Apr 200902046.773.59$72
Mar 200904742.144.06$191
Feb 20090032.814.63$0
Jan 200902335.865.37$124
Dec 200803637.105.98$215
Nov 200804055.496.86$274
Oct 200805075.246.92$346
Sep 2008013101.767.88$102
Aug 2008020114.228.48$170
Jul 20080123131.0811.39$1,401
Jun 20080281131.3313.03$3,662
May 20080628123.1711.57$7,269
Apr 200801,657110.3110.45$17,324
Mar 200802,775101.909.66$26,818
Feb 200802,42192.538.77$21,234
Jan 200803,59890.388.21$29,524
Dec 200703,60788.337.30$26,338
Nov 200704,97491.677.29$36,269
Oct 2007049282.856.92$3,406
Sep 200705175.846.24$318
Aug 20070769.066.39$45
Jul 200701170.906.39$70
Jun 200708162.007.55$611
May 2007022458.747.85$1,758
Apr 2007074659.617.81$5,823
Mar 2007075956.927.30$5,542
Feb 200702,01455.108.22$16,547
Jan 200703,55950.306.73$23,941
Dec 2006023056.656.92$1,591

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2016 — as filed, then multipliedworked
Condensate            36 bbl  × $ 36.56 =     $1,316
Gas                    9 Mcf  × $  1.99 =        $18

────────────────────────────────────────────────────
Month total                                   $1,334

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/223674 is the state's own key, not one this site invented.