KNIGHT "25"

Operated by PETEX (P-5 659782) in the PITZ (DUFFER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 227130District 7BField 71777100CondensateGasSaveExport
Value, all time
$1.7 M
Apr 2007 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
230
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 113 leases and 114 wells, and the rule below applies to all of them.

Discovered
1989-12-12
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: OPERATORS AND PURCHASERS IN THIS FIELD

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition808 bbl$45,466
GasProduction375,703 Mcf$1,621,343
Total$1,666,809

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.5888, -98.8629. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.58883, -98.86286 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
4,280 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,280 ft.

Completions filed
Apr 2007
1 of 1 wells

1 well

42-4293628414,280 ftApr 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (230)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

230 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250160.553.23$3
Apr 20250862.363.54$28
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250474.324.28$17
Dec 20240268.993.12$6
Nov 20240669.052.20$13
Oct 202401371.372.28$30
Sep 202402369.612.36$54
Aug 2024035375.632.06$728
Jul 2024043179.932.15$925
Jun 2024037378.082.63$982
May 2024039578.812.20$868
Apr 2024036684.451.66$607
Mar 2024039680.301.55$612
Feb 2024044076.091.78$785
Jan 2024034173.023.30$1,125
Dec 2023045471.262.61$1,185
Nov 2023040377.892.81$1,131
Oct 2023042785.443.09$1,318
Sep 2023037089.042.74$1,012
Aug 2023026680.522.67$711
Jul 2023011674.852.64$306
Jun 2023018768.962.26$422
May 2023023670.622.23$526
Apr 2023030378.122.24$678
Mar 2023052872.852.39$1,264
Feb 2023051275.112.47$1,262
Jan 2023045176.533.39$1,528
Dec 2022038676.415.73$2,211
Nov 2022038785.005.65$2,185
Oct 2022027687.185.86$1,618
Sep 2022028484.888.16$2,318
Aug 2022032294.529.13$2,939
Jul 20220492101.587.54$3,711
Jun 20220619115.097.98$4,938
May 20220782109.378.43$6,595
Apr 202200104.226.84$0
Mar 20220191108.885.08$970
Feb 20220091.054.86$0
Jan 2022024581.844.54$1,112
Dec 2021055171.323.90$2,148
Nov 2021050077.435.24$2,618
Oct 2021043579.795.71$2,486
Sep 2021037869.865.35$2,023
Aug 2021047766.024.22$2,013
Jul 2021068570.783.98$2,728
Jun 2021083769.493.38$2,830
May 2021016663.483.02$501
Apr 2021045760.362.76$1,261
Mar 2021068061.302.72$1,848
Feb 2021055257.805.55$3,062
Jan 2021065450.412.81$1,838
Dec 2020065944.642.68$1,763
Nov 2020064838.772.71$1,754
Oct 2020068836.972.48$1,705
Sep 2020071437.091.99$1,422
Aug 2020082639.982.39$1,970
Jul 2020077838.371.83$1,420
Jun 2020089534.901.69$1,513
May 2020091016.921.81$1,651
Apr 2020092214.751.80$1,664
Mar 2020097030.341.86$1,801
Feb 2020088149.881.98$1,745
Jan 2020083857.252.09$1,755
Dec 2019061159.012.30$1,408
Nov 2019064455.302.75$1,771
Oct 2019079553.472.42$1,923
Sep 2019080555.052.66$2,139
Aug 2019081653.112.30$1,880
Jul 2019082956.272.46$2,039
Jun 2019082852.782.49$2,063
May 2019082858.482.74$2,269
Apr 2019081962.632.75$2,253
Mar 20197489956.803.06$6,956
Feb 2019078850.852.79$2,200
Jan 2019089246.033.23$2,880
Dec 2018086446.594.19$3,616
Nov 2018095452.934.24$4,042
Oct 201801,05161.443.40$3,571
Sep 201801,05659.543.11$3,282
Aug 201801,10559.403.07$3,389
Jul 201801,09365.142.93$3,205
Jun 201801,18060.183.08$3,631
May 201801,37465.382.90$3,986
Apr 201801,13563.842.90$3,292
Mar 201801,24661.222.79$3,472
Feb 201801,19761.782.77$3,311
Jan 201801,33662.874.01$5,356
Dec 201701,86857.272.92$5,457
Nov 201701,83055.423.12$5,707
Oct 201701,84749.292.98$5,511
Sep 201701,67947.523.09$5,184
Aug 201701,65445.373.00$4,969
Jul 2017046043.873.09$1,420
Jun 2017056042.493.09$1,729
May 201716151245.373.26$8,975
Apr 2017083747.933.21$2,688
Mar 2017091446.772.98$2,727
Feb 2017037050.452.95$1,092
Jan 201701,40349.413.42$4,797
Dec 201601,82148.763.72$6,779
Nov 201602,55742.492.64$6,762
Oct 201603,27546.193.09$10,121
Sep 201603,67841.553.10$11,404
Aug 201605,98241.442.92$17,493
Jul 201605,99541.622.92$17,531
Jun 201602,28045.352.69$6,124
May 201602,98242.521.99$5,937
Apr 201603,87036.561.99$7,705
Mar 201606,21033.011.79$11,141
Feb 201608,82226.472.06$18,205
Jan 201608,27827.352.36$19,572
Dec 201507,13132.362.00$14,272
Nov 201505,25138.792.17$11,381
Oct 201501,62543.552.43$3,943
Sep 2015094042.992.76$2,593
Aug 2015093940.162.87$2,697
Jul 2015098248.152.95$2,892
Jun 2015097456.152.88$2,808
May 201501,02855.212.96$3,038
Apr 201501,00749.822.71$2,726
Mar 201501,05542.892.93$3,096
Feb 201501,00844.662.98$3,000
Jan 201515393643.433.10$9,547
Dec 2014095654.693.59$3,433
Nov 2014095770.464.25$4,069
Oct 201401,03178.303.90$4,022
Sep 201401,04686.164.05$4,232
Aug 201401,11089.394.04$4,479
Jul 201401,13196.564.18$4,727
Jun 201401,13198.164.74$5,357
May 201401,17594.734.73$5,554
Apr 201401,13195.944.81$5,439
Mar 201401,16395.895.06$5,881
Feb 201401,05397.406.19$6,520
Jan 201401,18990.404.86$5,779
Dec 201301,21491.824.35$5,286
Nov 201301,22188.853.74$4,564
Oct 201301,31897.423.78$4,981
Sep 201301,320104.113.72$4,907
Aug 201301,391104.253.52$4,900
Jul 201301,405102.523.72$5,223
Jun 201301,40794.403.93$5,534
May 201301,48294.834.15$6,149
Apr 201301,45593.964.28$6,231
Mar 201301,52993.623.91$5,983
Feb 201301,40391.233.42$4,798
Jan 201301,57791.603.42$5,393
Dec 201201,61986.773.42$5,537
Nov 20121601,61986.953.62$19,781
Oct 201201,80289.383.40$6,126
Sep 201201,56694.672.92$4,570
Aug 201201,40592.662.91$4,086
Jul 201201,89285.133.02$5,715
Jun 201201,86879.822.52$4,706
May 201202,00891.612.49$4,997
Apr 201201,940101.652.00$3,874
Mar 201202,091105.052.22$4,646
Feb 201201,984101.102.57$5,099
Jan 201202,16198.092.73$5,908
Dec 201102,17996.873.24$7,059
Nov 201102,14195.723.31$7,089
Oct 201102,31784.983.65$8,454
Sep 201102,33583.623.99$9,307
Aug 201102,39083.404.15$9,917
Jul 201102,53894.144.52$11,465
Jun 201102,46792.904.64$11,447
May 201102,70698.134.40$11,919
Apr 201102,685105.964.33$11,635
Mar 201102,80296.364.06$11,369
Feb 201102,52085.644.18$10,534
Jan 201102,91386.504.59$13,367
Dec 201002,99585.734.35$13,022
Nov 201003,00680.843.80$11,409
Oct 201003,14678.103.51$11,039
Sep 201003,09472.633.98$12,312
Aug 201003,35973.684.42$14,845
Jul 201003,43972.554.74$16,289
Jun 201003,40870.364.91$16,735
May 201003,56471.124.24$15,094
Apr 201003,53181.694.12$14,557
Mar 201003,74178.394.39$16,418
Feb 201003,38373.585.44$18,412
Jan 201003,87174.365.96$23,087
Dec 200903,90971.445.48$21,436
Nov 200903,81174.593.75$14,297
Oct 200903,91772.544.11$16,100
Sep 200903,80965.543.06$11,674
Aug 200903,74467.423.22$12,050
Jul 200903,79861.133.46$13,158
Jun 200903,58166.163.90$13,948
May 200903,68954.743.93$14,482
Apr 200903,49746.773.59$12,545
Mar 200903,42242.144.06$13,890
Feb 200903,28932.814.63$15,238
Jan 20091043,55135.865.37$22,802
Dec 200803,60937.105.98$21,572
Nov 200803,46755.496.86$23,785
Oct 200803,59575.246.92$24,885
Sep 200803,565101.767.88$28,082
Aug 200803,453114.228.48$29,292
Jul 200803,372131.0811.39$38,405
Jun 200803,577131.3313.03$46,618
May 200803,575123.1711.57$41,378
Apr 200803,558110.3110.45$37,198
Mar 200803,637101.909.66$35,148
Feb 200803,46292.538.77$30,364
Jan 200803,81690.388.21$31,313
Dec 200703,49988.337.30$25,550
Nov 200702,93491.677.29$21,394
Oct 200702,79882.856.92$19,368
Sep 200702,80275.846.24$17,496
Aug 200703,00769.066.39$19,209
Jul 200702,55470.906.39$16,315
Jun 20071562,80462.007.55$30,838
May 200702,50358.747.85$19,639
Apr 2007062459.617.81$4,870

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2025 — as filed, then multipliedworked
Condensate             0 bbl  × $ 60.55 =         $0
Gas                    1 Mcf  × $  3.23 =         $3

────────────────────────────────────────────────────
Month total                                       $3

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/227130 is the state's own key, not one this site invented.