KNIGHT

Operated by PETEX (P-5 659782) in the PITZ (DUFFER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 239999District 7BField 71777100GasSaveExport
Value, all time
$840 k
Jun 2008 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
216
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 113 leases and 114 wells, and the rule below applies to all of them.

Discovered
1989-12-12
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: OPERATORS AND PURCHASERS IN THIS FIELD

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction220,121 Mcf$840,229
Total$840,229

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.6012, -98.8662. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.60122, -98.86616 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
4,127 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,127 ft.

Completions filed
Jun 2008
1 of 1 wells

1 well

42-4293638124,127 ftJun 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (216)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

216 months

May 20260106.413.05$0
Apr 2026098.932.87$0
Mar 2026089.753.15$0
Feb 2026063.503.75$0
Jan 2026059.138.00$0
Dec 2025056.664.41$0
Nov 2025058.593.93$0
Oct 2025059.383.30$0
Sep 2025062.743.08$0
Aug 2025063.933.01$0
Jul 2025066.743.32$0
Jun 2025066.483.13$0
May 2025060.553.23$0
Apr 2025062.363.54$0
Mar 2025067.704.27$0
Feb 2025070.884.34$0
Jan 2025074.324.28$0
Dec 2024068.993.12$0
Nov 2024069.052.20$0
Oct 2024071.372.28$0
Sep 2024069.612.36$0
Aug 2024075.632.06$0
Jul 2024079.932.15$0
Jun 2024078.082.63$0
May 2024078.812.20$0
Apr 2024084.451.66$0
Mar 2024080.301.55$0
Feb 2024076.091.78$0
Jan 2024073.023.30$0
Dec 2023071.262.61$0
Nov 2023077.892.81$0
Oct 2023085.443.09$0
Sep 2023089.042.74$0
Aug 2023080.522.67$0
Jul 2023074.852.64$0
Jun 2023068.962.26$0
May 2023070.622.23$0
Apr 2023078.122.24$0
Mar 2023072.852.39$0
Feb 2023075.112.47$0
Jan 2023076.533.39$0
Dec 2022076.415.73$0
Nov 2022085.005.65$0
Oct 2022087.185.86$0
Sep 2022084.888.16$0
Aug 2022094.529.13$0
Jul 20220101.587.54$0
Jun 20220115.097.98$0
May 20220109.378.43$0
Apr 20220104.226.84$0
Mar 20220108.885.08$0
Feb 2022091.054.86$0
Jan 2022081.844.54$0
Dec 2021071.323.90$0
Nov 2021077.435.24$0
Oct 2021079.795.71$0
Sep 2021069.865.35$0
Aug 2021066.024.22$0
Jul 2021070.783.98$0
Jun 2021069.493.38$0
May 2021063.483.02$0
Apr 2021060.362.76$0
Mar 2021061.302.72$0
Feb 2021057.805.55$0
Jan 2021050.412.81$0
Dec 202016044.642.68$428
Nov 202052938.772.71$1,432
Oct 202025236.972.48$625
Sep 2020037.091.99$0
Aug 2020039.982.39$0
Jul 20207238.371.83$131
Jun 202040734.901.69$688
May 202057616.921.81$1,045
Apr 202067814.751.80$1,223
Mar 202059330.341.86$1,101
Feb 202048049.881.98$951
Jan 202058957.252.09$1,234
Dec 201949759.012.30$1,145
Nov 201933655.302.75$924
Oct 201933453.472.42$808
Sep 201954955.052.66$1,459
Aug 201965253.112.30$1,502
Jul 201974956.272.46$1,843
Jun 201976452.782.49$1,903
May 201980558.482.74$2,206
Apr 201978562.632.75$2,159
Mar 201980956.803.06$2,477
Feb 201980250.852.79$2,239
Jan 201983046.033.23$2,679
Dec 201889946.594.19$3,763
Nov 201888552.934.24$3,750
Oct 201892761.443.40$3,150
Sep 201810459.543.11$323
Aug 2018059.403.07$0
Jul 2018065.142.93$0
Jun 201832960.183.08$1,012
May 201840465.382.90$1,172
Apr 201828263.842.90$818
Mar 201833261.222.79$925
Feb 201818061.782.77$498
Jan 20188562.874.01$341
Dec 2017357.272.92$9
Nov 2017255.423.12$6
Oct 201723049.292.98$686
Sep 201711047.523.09$340
Aug 20174245.373.00$126
Jul 201768743.873.09$2,121
Jun 201788642.493.09$2,735
May 201793845.373.26$3,061
Apr 201783247.933.21$2,672
Mar 201785446.772.98$2,548
Feb 201779350.452.95$2,341
Jan 201781649.413.42$2,790
Dec 201655148.763.72$2,051
Nov 201684842.492.64$2,242
Oct 201693746.193.09$2,896
Sep 201690141.553.10$2,794
Aug 201634241.442.92$1,000
Jul 201677041.622.92$2,252
Jun 201688845.352.69$2,385
May 20161,34242.521.99$2,672
Apr 20161,59136.561.99$3,168
Mar 20161,79233.011.79$3,215
Feb 20161,73426.472.06$3,578
Jan 20161,88027.352.36$4,445
Dec 20151,98132.362.00$3,965
Nov 20152,09738.792.17$4,545
Oct 20152,14643.552.43$5,207
Sep 20152,18542.992.76$6,027
Aug 20152,40840.162.87$6,917
Jul 20152,43148.152.95$7,159
Jun 20152,48956.152.88$7,175
May 20152,71355.212.96$8,018
Apr 20152,83149.822.71$7,662
Mar 20153,04342.892.93$8,930
Feb 20152,83844.662.98$8,446
Jan 20153,29043.433.10$10,201
Dec 20143,41654.693.59$12,268
Nov 20143,53170.464.25$15,013
Oct 20143,80878.303.90$14,855
Sep 20143,75486.164.05$15,187
Aug 20143,92489.394.04$15,834
Jul 20143,93996.564.18$16,463
Jun 20143,93398.164.74$18,630
May 20144,24094.734.73$20,041
Apr 20144,26695.944.81$20,516
Mar 20144,53095.895.06$22,907
Feb 20144,34397.406.19$26,892
Jan 20145,09890.404.86$24,780
Dec 20135,47291.824.35$23,828
Nov 20135,70388.853.74$21,319
Oct 20136,38797.423.78$24,139
Sep 20136,618104.113.72$24,604
Aug 20137,325104.253.52$25,803
Jul 20137,937102.523.72$29,508
Jun 20134,58494.403.93$18,031
May 2013094.834.15$0
Apr 2013093.964.28$0
Mar 2013093.623.91$0
Feb 2013091.233.42$0
Jan 2013091.603.42$0
Dec 2012086.773.42$0
Nov 2012086.953.62$0
Oct 2012089.383.40$0
Sep 2012094.672.92$0
Aug 20123392.662.91$96
Jul 20122585.133.02$76
Jun 2012079.822.52$0
May 20121691.612.49$40
Apr 2012257101.652.00$513
Mar 2012698105.052.22$1,551
Feb 2012189101.102.57$486
Jan 201272198.092.73$1,971
Dec 201167196.873.24$2,174
Nov 201132395.723.31$1,070
Oct 201159284.983.65$2,160
Sep 201178683.623.99$3,133
Aug 201151383.404.15$2,129
Jul 20111394.144.52$59
Jun 20111,11192.904.64$5,155
May 201191498.134.40$4,026
Apr 20111,349105.964.33$5,846
Mar 20111,32296.364.06$5,364
Feb 20111,27085.644.18$5,309
Jan 20111,42086.504.59$6,516
Dec 20101,52485.734.35$6,626
Nov 20101,47080.843.80$5,579
Oct 20101,45778.103.51$5,112
Sep 20101,31172.633.98$5,217
Aug 20101,41773.684.42$6,262
Jul 20101,43272.554.74$6,783
Jun 20101,39370.364.91$6,840
May 20101,44671.124.24$6,124
Apr 20101,26781.694.12$5,223
Mar 20101,43278.394.39$6,285
Feb 201063773.585.44$3,467
Jan 20102,04774.365.96$12,208
Dec 20091,53371.445.48$8,407
Nov 20092,31374.593.75$8,677
Oct 20092,51772.544.11$10,346
Sep 20092,51065.543.06$7,693
Aug 20092,57567.423.22$8,288
Jul 20092,56861.133.46$8,897
Jun 20092,40666.163.90$9,371
May 20092,06954.743.93$8,122
Apr 20092,18746.773.59$7,846
Mar 20091,76742.144.06$7,172
Feb 20091,55132.814.63$7,186
Jan 20091,89135.865.37$10,157
Dec 20081,67337.105.98$10,000
Nov 20081,27755.496.86$8,761
Oct 200889475.246.92$6,188
Sep 2008300101.767.88$2,363
Aug 2008401114.228.48$3,402
Jul 2008676131.0811.39$7,699
Jun 2008253131.3313.03$3,297

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2020 — as filed, then multipliedworked
Gas                  160 Mcf  × $  2.68 =       $428

────────────────────────────────────────────────────
Month total                                     $428

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/239999 is the state's own key, not one this site invented.