SMITH, M.

Operated by BLUESTEM RESOURCES LLC (P-5 102613) in the GRAHM (BIG SALINE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 251674District 7BField 36283500GasSaveExport
Value, all time
$1.0 M
Mar 2008 – May 2026
Value, last 12 filed months
$14 k
at the published price for each month
Months reported
219
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 11 leases and 11 wells, and the rule below applies to all of them.

Discovered
1985-02-15
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 12/01/1999.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction170,250 Mcf$1,032,421
Total$1,032,421

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.5603, -98.4367. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.56025, -98.43672 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
3,850 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,850 ft.

Completions filed
Mar 2008
1 of 1 wells

1 well

42-3633517523,850 ftMar 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (219)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

219 months

May 2026286106.413.05$871
Apr 202626698.932.87$763
Mar 202629089.753.15$913
Feb 202625863.503.75$968
Jan 202624859.138.00$1,983
Dec 202529856.664.41$1,315
Nov 202533058.593.93$1,296
Oct 202535859.383.30$1,183
Sep 202533962.743.08$1,043
Aug 202536263.933.01$1,091
Jul 202541066.743.32$1,359
Jun 202543266.483.13$1,352
May 202528760.553.23$928
Apr 20253162.363.54$110
Mar 20254167.704.27$175
Feb 202510770.884.34$464
Jan 202522674.324.28$967
Dec 2024168.993.12$3
Nov 2024069.052.20$0
Oct 20245771.372.28$130
Sep 20245769.612.36$135
Aug 20247675.632.06$157
Jul 20244079.932.15$86
Jun 20244478.082.63$116
May 20248978.812.20$196
Apr 2024284.451.66$3
Mar 20249180.301.55$141
Feb 202424876.091.78$442
Jan 202419373.023.30$636
Dec 202328571.262.61$744
Nov 202329077.892.81$814
Oct 202323885.443.09$735
Sep 202327889.042.74$760
Aug 202321680.522.67$577
Jul 202331974.852.64$843
Jun 202324568.962.26$553
May 20239170.622.23$203
Apr 202328078.122.24$627
Mar 202327172.852.39$649
Feb 202322575.112.47$555
Jan 202328476.533.39$962
Dec 202224876.415.73$1,421
Nov 202229785.005.65$1,677
Oct 202231987.185.86$1,871
Sep 202230784.888.16$2,506
Aug 202230994.529.13$2,820
Jul 2022280101.587.54$2,112
Jun 2022353115.097.98$2,816
May 2022165109.378.43$1,391
Apr 20220104.226.84$0
Mar 20220108.885.08$0
Feb 2022091.054.86$0
Jan 2022081.844.54$0
Dec 2021071.323.90$0
Nov 2021077.435.24$0
Oct 2021079.795.71$0
Sep 2021069.865.35$0
Aug 20211566.024.22$63
Jul 2021070.783.98$0
Jun 2021069.493.38$0
May 2021063.483.02$0
Apr 2021060.362.76$0
Mar 2021061.302.72$0
Feb 2021257.805.55$11
Jan 2021050.412.81$0
Dec 2020044.642.68$0
Nov 2020038.772.71$0
Oct 2020036.972.48$0
Sep 2020037.091.99$0
Aug 2020039.982.39$0
Jul 2020038.371.83$0
Jun 2020034.901.69$0
May 202010916.921.81$198
Apr 202017814.751.80$321
Mar 202020430.341.86$379
Feb 202020349.881.98$402
Jan 202022057.252.09$461
Dec 201924159.012.30$555
Nov 201924155.302.75$663
Oct 201920853.472.42$503
Sep 201923855.052.66$632
Aug 201926253.112.30$604
Jul 201926556.272.46$652
Jun 20198052.782.49$199
May 201925458.482.74$696
Apr 201923562.632.75$646
Mar 201926456.803.06$808
Feb 201923250.852.79$648
Jan 201927446.033.23$885
Dec 201824246.594.19$1,013
Nov 201828652.934.24$1,212
Oct 201827561.443.40$934
Sep 201830659.543.11$951
Aug 201825659.403.07$785
Jul 201830365.142.93$888
Jun 201825760.183.08$791
May 201830765.382.90$891
Apr 201828763.842.90$833
Mar 201829561.222.79$822
Feb 201827561.782.77$761
Jan 201829162.874.01$1,167
Dec 201732157.272.92$938
Nov 201754855.423.12$1,709
Oct 201731649.292.98$943
Sep 201732247.523.09$994
Aug 201731045.373.00$931
Jul 201734043.873.09$1,050
Jun 201737242.493.09$1,148
May 201738745.373.26$1,263
Apr 201738747.933.21$1,243
Mar 201738446.772.98$1,146
Feb 201728250.452.95$833
Jan 201733049.413.42$1,128
Dec 201634648.763.72$1,288
Nov 201634842.492.64$920
Oct 201637846.193.09$1,168
Sep 201637041.553.10$1,147
Aug 201639941.442.92$1,167
Jul 201641441.622.92$1,211
Jun 201623445.352.69$628
May 201635842.521.99$713
Apr 201640736.561.99$810
Mar 201641633.011.79$746
Feb 201637626.472.06$776
Jan 201642127.352.36$995
Dec 201548332.362.00$967
Nov 201542538.792.17$921
Oct 201534443.552.43$835
Sep 201533642.992.76$927
Aug 201548840.162.87$1,402
Jul 201556148.152.95$1,652
Jun 201553656.152.88$1,545
May 201554255.212.96$1,602
Apr 201555649.822.71$1,505
Mar 201554142.892.93$1,588
Feb 201551744.662.98$1,539
Jan 201558843.433.10$1,823
Dec 201450854.693.59$1,824
Nov 201460370.464.25$2,564
Oct 201463078.303.90$2,458
Sep 201462186.164.05$2,512
Aug 201466589.394.04$2,683
Jul 201468096.564.18$2,842
Jun 201465298.164.74$3,088
May 201468394.734.73$3,228
Apr 201463195.944.81$3,035
Mar 201466395.895.06$3,353
Feb 201460597.406.19$3,746
Jan 201469790.404.86$3,388
Dec 201364791.824.35$2,817
Nov 201368788.853.74$2,568
Oct 201374297.423.78$2,804
Sep 2013720104.113.72$2,677
Aug 2013730104.253.52$2,572
Jul 2013754102.523.72$2,803
Jun 201374394.403.93$2,923
May 201374694.834.15$3,095
Apr 201377193.964.28$3,302
Mar 201358093.623.91$2,269
Feb 201370091.233.42$2,394
Jan 201369991.603.42$2,391
Dec 201271286.773.42$2,435
Nov 201266686.953.62$2,414
Oct 201265989.383.40$2,240
Sep 201259394.672.92$1,731
Aug 201254692.662.91$1,588
Jul 201239685.133.02$1,196
Jun 201245779.822.52$1,151
May 201226091.612.49$647
Apr 2012337101.652.00$673
Mar 2012295105.052.22$656
Feb 2012233101.102.57$599
Jan 201222098.092.73$602
Dec 201120096.873.24$648
Nov 201121495.723.31$709
Oct 201112184.983.65$441
Sep 201123783.623.99$945
Aug 201122383.404.15$925
Jul 201121994.144.52$989
Jun 20111392.904.64$60
May 2011298.134.40$9
Apr 201173105.964.33$316
Mar 201140796.364.06$1,651
Feb 201132285.644.18$1,346
Jan 201162386.504.59$2,859
Dec 201076485.734.35$3,322
Nov 201068580.843.80$2,600
Oct 201069278.103.51$2,428
Sep 201073672.633.98$2,929
Aug 20101,23473.684.42$5,453
Jul 20101,03672.554.74$4,907
Jun 20101,04870.364.91$5,146
May 20101,29171.124.24$5,468
Apr 20101,34681.694.12$5,549
Mar 20101,22978.394.39$5,394
Feb 201084873.585.44$4,615
Jan 201097674.365.96$5,821
Dec 200973171.445.48$4,009
Nov 200981874.593.75$3,069
Oct 20091,52172.544.11$6,252
Sep 20091,70365.543.06$5,219
Aug 20092,97067.423.22$9,559
Jul 20092,65961.133.46$9,212
Jun 20092,59566.163.90$10,108
May 20093,59254.743.93$14,101
Apr 20094,56646.773.59$16,381
Mar 20095,04342.144.06$20,470
Feb 20093,50032.814.63$16,216
Jan 20095,74835.865.37$30,873
Dec 20085,95537.105.98$35,594
Nov 20086,35755.496.86$43,611
Oct 20083,97075.246.92$27,480
Sep 20085,860101.767.88$46,160
Aug 20086,266114.228.48$53,155
Jul 20086,391131.0811.39$72,790
Jun 20087,571131.3313.03$98,670
May 20089,250123.1711.57$107,062
Apr 200811,252110.3110.45$117,638
Mar 20083,307101.909.66$31,959

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Gas                  286 Mcf  × $  3.05 =       $871

────────────────────────────────────────────────────
Month total                                     $871

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/251674 is the state's own key, not one this site invented.