STROEBEL, C. G. "A"

Operated by SOUTHWEST GAS SYSTEMS, INC. (P-5 806190) in the FOSTER (MARBLE FALLS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 282254District 7BField 32300500GasSaveExport
Value, all time
$7 k
May 2017 – Jan 2026
Value, last 12 filed months
$146
at the published price for each month
Months reported
105
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 278 leases and 358 wells, and the rule below applies to all of them.

Discovered
1976-08-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres.

The Commission's schedule remark for this field reads: OPTIONAL 40 AC UNITS DIAG 2100'

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction2,009 Mcf$6,638
Total$6,638

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.1882, -98.9321. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.18822, -98.93215 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
3,000 ft
1 wells filed one
Completion to plug
47.9 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,000 ft.

Completions filed
Feb 1978
1 of 1 wells
Plug dates filed
Jan 2026
1 of 1 wells

Last completion to plug: a median of 47.9 years across the 1 well that filed both dates, with the middle half between 47.9 years and 47.9 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1333127643,000 ftFeb 1978Jan 2026Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (105)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

105 months

Jan 2026059.138.00$0
Dec 2025056.664.41$0
Nov 2025458.593.93$16
Oct 2025559.383.30$17
Sep 2025562.743.08$15
Aug 2025563.933.01$15
Jul 2025566.743.32$17
Jun 2025666.483.13$19
May 2025460.553.23$13
Apr 2025562.363.54$18
Mar 2025267.704.27$9
Feb 2025270.884.34$9
Jan 2025274.324.28$9
Dec 2024268.993.12$6
Nov 2024269.052.20$4
Oct 2024471.372.28$9
Sep 2024469.612.36$9
Aug 2024475.632.06$8
Jul 2024579.932.15$11
Jun 2024278.082.63$5
May 2024378.812.20$7
Apr 2024684.451.66$10
Mar 2024480.301.55$6
Feb 2024276.091.78$4
Jan 2024473.023.30$13
Dec 2023271.262.61$5
Nov 2023377.892.81$8
Oct 20231285.443.09$37
Sep 20231289.042.74$33
Aug 20231280.522.67$32
Jul 20232274.852.64$58
Jun 20231368.962.26$29
May 2023970.622.23$20
Apr 2023778.122.24$16
Mar 20231472.852.39$34
Feb 20231075.112.47$25
Jan 20231376.533.39$44
Dec 20221376.415.73$74
Nov 20221485.005.65$79
Oct 20221487.185.86$82
Sep 20221384.888.16$106
Aug 20221494.529.13$128
Jul 202219101.587.54$143
Jun 202221115.097.98$168
May 202213109.378.43$110
Apr 202213104.226.84$89
Mar 202213108.885.08$66
Feb 20221191.054.86$53
Jan 20221381.844.54$59
Dec 20211171.323.90$43
Nov 20212277.435.24$115
Oct 20211979.795.71$109
Sep 20211869.865.35$96
Aug 20213866.024.22$160
Jul 20214670.783.98$183
Jun 20212869.493.38$95
May 20211663.483.02$48
Apr 20213260.362.76$88
Mar 20212161.302.72$57
Feb 20211257.805.55$67
Jan 20211950.412.81$53
Dec 20201944.642.68$51
Nov 20201738.772.71$46
Oct 20201936.972.48$47
Sep 20201437.091.99$28
Aug 20201939.982.39$45
Jul 20202038.371.83$37
Jun 2020834.901.69$14
May 20202816.921.81$51
Apr 20202314.751.80$42
Mar 20202330.341.86$43
Feb 20202949.881.98$57
Jan 20202957.252.09$61
Dec 20193859.012.30$88
Nov 20193155.302.75$85
Oct 20192453.472.42$58
Sep 20196155.052.66$162
Aug 20192553.112.30$58
Jul 20193356.272.46$81
Jun 20192452.782.49$60
May 20192058.482.74$55
Apr 20193562.632.75$96
Mar 20191556.803.06$46
Feb 20191750.852.79$47
Jan 20194246.033.23$136
Dec 20182246.594.19$92
Nov 20182352.934.24$97
Oct 20183861.443.40$129
Sep 20185459.543.11$168
Aug 20186259.403.07$190
Jul 20186265.142.93$182
Jun 20181260.183.08$37
May 20181465.382.90$41
Apr 20181563.842.90$44
Mar 20181661.222.79$45
Feb 20181161.782.77$30
Jan 20181662.874.01$64
Dec 20172557.272.92$73
Nov 20173255.423.12$100
Oct 20175049.292.98$149
Sep 20176547.523.09$201
Aug 20175245.373.00$156
Jul 20175543.873.09$170
Jun 201710342.493.09$318
May 2017045.373.26$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2025 — as filed, then multipliedworked
Gas                    4 Mcf  × $  3.93 =        $16

────────────────────────────────────────────────────
Month total                                      $16

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/282254 is the state's own key, not one this site invented.