TURNBOW GAS UNIT

Operated by BROWN INDUSTRIAL GAS, INC. (P-5 100300) in the BROWNWOOD, SOUTH (MARBLE FALLS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 67992District 7BField 12570500GasSaveExport
Value, all time
$33 k
Jan 1993 – Sep 2011
Value, last 12 filed months
$0
at the published price for each month
Months reported
225
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 56 leases and 56 wells, and the rule below applies to all of them.

Discovered
1947-01-28
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction12,688 Mcf$32,810
Total$32,810

4,002 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.5933, -99.0185. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.59334, -99.01845 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
1,359 ft
1 wells filed one
Completion to plug
49.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 1,359 ft.

Completions filed
Jun 1962
1 of 1 wells
Plug dates filed
Sep 2011
1 of 1 wells

Last completion to plug: a median of 49.3 years across the 1 well that filed both dates, with the middle half between 49.3 years and 49.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-0490428211,359 ftJun 1962Sep 2011Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (225)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

225 months

Sep 2011083.623.99$0
Aug 2011083.404.15$0
Jul 2011094.144.52$0
Jun 2011092.904.64$0
May 2011098.134.40$0
Apr 20110105.964.33$0
Mar 2011096.364.06$0
Feb 2011085.644.18$0
Jan 2011086.504.59$0
Dec 2010085.734.35$0
Nov 2010080.843.80$0
Oct 2010078.103.51$0
Sep 2010072.633.98$0
Aug 2010073.684.42$0
Jul 2010072.554.74$0
Jun 2010070.364.91$0
May 2010071.124.24$0
Apr 2010081.694.12$0
Mar 2010078.394.39$0
Feb 2010073.585.44$0
Jan 2010074.365.96$0
Dec 2009071.445.48$0
Nov 2009074.593.75$0
Oct 2009072.544.11$0
Sep 2009065.543.06$0
Aug 2009067.423.22$0
Jul 2009061.133.46$0
Jun 2009066.163.90$0
May 2009054.743.93$0
Apr 2009046.773.59$0
Mar 2009042.144.06$0
Feb 2009032.814.63$0
Jan 2009035.865.37$0
Dec 2008037.105.98$0
Nov 2008055.496.86$0
Oct 2008075.246.92$0
Sep 20080101.767.88$0
Aug 20080114.228.48$0
Jul 20080131.0811.39$0
Jun 20080131.3313.03$0
May 20080123.1711.57$0
Apr 20080110.3110.45$0
Mar 20080101.909.66$0
Feb 2008092.538.77$0
Jan 2008090.388.21$0
Dec 2007088.337.30$0
Nov 2007091.677.29$0
Oct 2007082.856.92$0
Sep 2007075.846.24$0
Aug 2007069.066.39$0
Jul 2007070.906.39$0
Jun 2007062.007.55$0
May 2007058.747.85$0
Apr 2007059.617.81$0
Mar 2007056.927.30$0
Feb 2007055.108.22$0
Jan 2007050.306.73$0
Dec 2006056.656.92$0
Nov 2006054.207.62$0
Oct 2006054.906.01$0
Sep 2006060.085.04$0
Aug 2006068.717.34$0
Jul 2006069.376.34$0
Jun 2006066.286.38$0
May 2006066.016.42$0
Apr 2006064.397.36$0
Mar 2006056.707.08$0
Feb 2006057.597.75$0
Jan 2006060.598.93$0
Dec 2005054.9413.42$0
Nov 2005054.6910.59$0
Oct 2005058.3413.80$0
Sep 2005061.4512.08$0
Aug 2005061.519.80$0
Jul 2005055.697.84$0
Jun 2005052.337.38$0
May 20055645.226.65$372
Apr 20056049.207.36$442
Mar 20055150.377.15$365
Feb 20055045.226.31$316
Jan 20053843.166.32$240
Dec 20046839.866.75$459
Nov 20044445.286.33$279
Oct 20046449.706.52$417
Sep 20048743.245.28$460
Aug 20046742.375.55$372
Jul 20048138.286.08$493
Jun 20047236.106.43$463
May 20047737.486.49$500
Apr 20048034.475.86$469
Mar 20047534.365.53$415
Feb 20046532.455.51$358
Jan 20047932.036.30$498
Dec 20038530.266.30$536
Nov 20037128.804.60$326
Oct 20037328.174.76$347
Sep 20036826.314.75$323
Aug 20037329.765.13$374
Jul 20038129.415.17$419
Jun 20037928.565.98$473
May 20036726.595.97$400
Apr 20036826.675.41$368
Mar 20036831.146.10$415
Feb 20035833.487.93$460
Jan 20037030.315.58$391
Dec 20025626.914.85$272
Nov 20027024.664.14$290
Oct 20027126.464.23$300
Sep 20028527.443.64$309
Aug 20028325.963.16$263
Jul 20028324.583.06$254
Jun 20027023.733.34$234
May 20026924.663.58$247
Apr 20026523.653.51$228
Mar 20029322.003.10$289
Feb 20029418.222.38$223
Jan 20029317.172.38$221
Dec 20018716.932.36$206
Nov 20019018.072.41$217
Oct 20019619.782.53$243
Sep 20019724.262.25$218
Aug 20019924.873.05$302
Jul 200110123.933.20$323
Jun 20019424.563.82$359
May 20019325.524.31$401
Apr 20017224.685.34$384
Mar 200110524.545.38$565
Feb 20018527.755.77$490
Jan 200110327.478.40$865
Dec 20009826.889.12$894
Nov 200010332.215.66$583
Oct 20009831.235.15$504
Sep 200010431.875.19$539
Aug 20009829.644.54$445
Jul 20009828.534.09$401
Jun 20009229.304.40$405
May 20009527.263.68$350
Apr 20009424.513.12$293
Mar 200010328.422.86$295
Feb 20007727.622.73$210
Jan 20009625.272.48$238
Dec 199910524.282.42$254
Nov 19998623.192.43$209
Oct 199911520.982.80$322
Sep 199910021.752.62$262
Aug 199910119.262.88$290
Jul 19999717.892.37$230
Jun 19999815.942.36$231
May 199910915.792.32$253
Apr 199910615.102.21$234
Mar 199910612.471.84$195
Feb 1999959.981.82$173
Jan 199910710.381.90$203
Dec 19981069.201.77$188
Nov 19988010.892.19$175
Oct 19989512.421.97$187
Sep 199810112.592.08$210
Aug 19988811.301.91$168
Jul 19989511.742.24$213
Jun 199811211.242.24$251
May 199810612.622.21$234
Apr 19989613.042.51$241
Mar 19989412.802.31$217
Feb 19988513.952.30$195
Jan 19989414.702.15$203
Dec 19979916.322.41$239
Nov 19978018.193.09$247
Oct 19979019.253.15$283
Sep 19978717.742.95$257
Aug 199711117.862.55$284
Jul 19979117.582.25$204
Jun 199711317.242.26$255
May 199710218.972.31$235
Apr 19978217.882.08$171
Mar 19979318.951.94$180
Feb 19978520.492.21$188
Jan 19979123.483.54$322
Dec 19967223.32$0
Nov 19968721.97$0
Oct 19967423.31$0
Sep 19967322.22$0
Aug 199610420.26$0
Jul 19968919.55$0
Jun 19965918.73$0
May 19968719.43$0
Apr 19967621.51$0
Mar 19968819.38$0
Feb 19968516.98$0
Jan 19963317.07$0
Dec 19959317.19$0
Nov 19958316.00$0
Oct 19958815.43$0
Sep 19958416.18$0
Aug 19958915.92$0
Jul 19958515.24$0
Jun 199510016.41$0
May 19958717.56$0
Apr 19959017.73$0
Mar 199510016.44$0
Feb 19954716.58$0
Jan 19956915.92$0
Dec 19946415.03$0
Nov 19946215.90$0
Oct 19946015.58$0
Sep 199410415.29$0
Aug 199412416.13$0
Jul 199414117.56$0
Jun 199410517.09$0
May 19947615.88$0
Apr 19948014.14$0
Mar 19948512.46$0
Feb 19947112.50$0
Jan 19947312.66$0
Dec 19938512.33$0
Nov 19938414.49$0
Oct 19939115.85$0
Sep 19937115.03$0
Aug 19937315.66$0
Jul 199311015.46$0
Jun 19939116.79$0
May 19938717.68$0
Apr 19938118.05$0
Mar 19938818.14$0
Feb 19937017.90$0
Jan 19938416.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2005 — as filed, then multipliedworked
Gas                   56 Mcf  × $  6.65 =       $372

────────────────────────────────────────────────────
Month total                                     $372

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/67992 is the state's own key, not one this site invented.