Operated by PATTON EXPLORATION, INC. (P-5 643730) in the TOTO (CADDO CONGLOMERATE) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 73015District 7BField 90813180CondensateGasSaveExport
Value, all time
$55 k
Jan 1993 – Jan 2023
Value, last 12 filed months
$0
at the published price for each month
Months reported
361
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 79 leases and 79 wells, and the rule below applies to all of them.

Discovered
1954-06-20
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 06/01/2005.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition8 bbl$137
GasProduction55,372 Mcf$54,988
Total$55,125

37,011 Mcf of this lease's gas, across 46 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.9970, -97.9993. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,474 ft
1 wells filed one
Completion to plug
45.7 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,474 ft.

Completions filed
May 1977
1 of 1 wells
Plug dates filed
Jan 2023
1 of 1 wells

Last completion to plug: a median of 45.7 years across the 1 well that filed both dates, with the middle half between 45.7 years and 45.7 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3673048924,474 ftMay 1977Jan 2023Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (361)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

361 months

Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190653.472.42$15
Sep 20190855.052.66$21
Aug 20190753.112.30$16
Jul 201901056.272.46$25
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190962.632.75$25
Mar 201901156.803.06$34
Feb 20190950.852.79$25
Jan 20190946.033.23$29
Dec 201801146.594.19$46
Nov 201801152.934.24$47
Oct 20180961.443.40$31
Sep 201801559.543.11$47
Aug 201801159.403.07$34
Jul 201801165.142.93$32
Jun 201801460.183.08$43
May 201801465.382.90$41
Apr 201801263.842.90$35
Mar 201801361.222.79$36
Feb 201801361.782.77$36
Jan 201801162.874.01$44
Dec 201701157.272.92$32
Nov 201701255.423.12$37
Oct 201702349.292.98$69
Sep 201702247.523.09$68
Aug 201701545.373.00$45
Jul 201701243.873.09$37
Jun 201702242.493.09$68
May 201701545.373.26$49
Apr 201701747.933.21$55
Mar 201702146.772.98$63
Feb 201702050.452.95$59
Jan 201701849.413.42$62
Dec 201601048.763.72$37
Nov 201601142.492.64$29
Oct 201601346.193.09$40
Sep 201601541.553.10$47
Aug 201601941.442.92$56
Jul 201603741.622.92$108
Jun 201602045.352.69$54
May 201601342.521.99$26
Apr 201601236.561.99$24
Mar 201601433.011.79$25
Feb 201601126.472.06$23
Jan 201601227.352.36$28
Dec 201501332.362.00$26
Nov 201501538.792.17$33
Oct 201501943.552.43$46
Sep 201502142.992.76$58
Aug 201502540.162.87$72
Jul 201502348.152.95$68
Jun 201501756.152.88$49
May 201502055.212.96$59
Apr 201501249.822.71$32
Mar 201501442.892.93$41
Feb 201501444.662.98$42
Jan 201502243.433.10$68
Dec 20140554.693.59$18
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 2008015114.228.48$127
Jul 200800131.0811.39$0
Jun 2008042131.3313.03$547
May 2008033123.1711.57$382
Apr 2008043110.3110.45$450
Mar 2008028101.909.66$271
Feb 200804092.538.77$351
Jan 200802790.388.21$222
Dec 200703088.337.30$219
Nov 20070091.677.29$0
Oct 200701082.856.92$69
Sep 20070075.846.24$0
Aug 200701069.066.39$64
Jul 200701570.906.39$96
Jun 200704062.007.55$302
May 200702558.747.85$196
Apr 200704459.617.81$343
Mar 20070056.927.30$0
Feb 200702555.108.22$205
Jan 200701050.306.73$67
Dec 200601556.656.92$104
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 200604468.717.34$323
Jul 20060769.376.34$44
Jun 200603966.286.38$249
May 200604466.016.42$283
Apr 20060264.397.36$15
Mar 200604456.707.08$312
Feb 200605057.597.75$388
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 200505555.697.84$431
Jun 20050352.337.38$22
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 200404643.245.28$243
Aug 20040042.375.55$0
Jul 200409738.286.08$590
Jun 20040036.106.43$0
May 200402537.486.49$162
Apr 200408834.475.86$516
Mar 2004010534.365.53$581
Feb 2004012432.455.51$683
Jan 2004013132.036.30$825
Dec 2003013130.266.30$826
Nov 2003011928.804.60$547
Oct 200304128.174.76$195
Sep 2003014126.314.75$670
Aug 200304129.765.13$210
Jul 200302229.415.17$114
Jun 200303528.565.98$209
May 200303826.595.97$227
Apr 200306326.675.41$341
Mar 200305931.146.10$360
Feb 200308133.487.93$642
Jan 200303330.315.58$184
Dec 200205626.914.85$272
Nov 200208624.664.14$356
Oct 200203026.464.23$127
Sep 200202027.443.64$73
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 20010016.932.36$0
Nov 20010018.072.41$0
Oct 20010019.782.53$0
Sep 20010024.262.25$0
Aug 20010024.873.05$0
Jul 20010023.933.20$0
Jun 20010024.563.82$0
May 20010025.524.31$0
Apr 20010024.685.34$0
Mar 20010024.545.38$0
Feb 20010027.755.77$0
Jan 20010027.478.40$0
Dec 20000026.889.12$0
Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 20000231.875.19$10
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 200004529.304.40$198
May 200006627.263.68$243
Apr 2000010424.513.12$324
Mar 2000011028.422.86$315
Feb 200009027.622.73$245
Jan 200001425.272.48$35
Dec 19990024.282.42$0
Nov 19990023.192.43$0
Oct 19990020.982.80$0
Sep 19990021.752.62$0
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 1999010115.942.36$239
May 199909815.792.32$227
Apr 199906915.102.21$152
Mar 1999011912.471.84$219
Feb 19990819.981.82$147
Jan 1999012610.381.90$239
Dec 199802749.201.77$486
Nov 1998038810.892.19$848
Oct 1998049512.421.97$975
Sep 1998045012.592.08$937
Aug 1998047311.301.91$902
Jul 1998049111.742.24$1,099
Jun 1998056011.242.24$1,253
May 1998065612.622.21$1,447
Apr 1998068413.042.51$1,714
Mar 1998075912.802.31$1,753
Feb 1998081513.952.30$1,874
Jan 1998083714.702.15$1,804
Dec 1997069516.322.41$1,676
Nov 1997078118.193.09$2,412
Oct 1997079119.253.15$2,492
Sep 1997073717.742.95$2,178
Aug 1997074417.862.55$1,901
Jul 1997075317.582.25$1,692
Jun 1997068017.242.26$1,535
May 1997027018.972.31$623
Apr 19970017.882.08$0
Mar 1997031218.951.94$605
Feb 1997044820.492.21$988
Jan 199701,06223.483.54$3,759
Dec 199601,25323.32$0
Nov 1996035121.97$0
Oct 199602,12923.31$0
Sep 1996085722.22$0
Aug 199601,29620.26$0
Jul 199607619.55$0
Jun 19960018.73$0
May 199603219.43$0
Apr 19960021.51$0
Mar 19960519.38$0
Feb 1996057116.98$0
Jan 1996826217.07$137
Dec 199502,76017.19$0
Nov 199503,73116.00$0
Oct 199503,91515.43$0
Sep 199504,01516.18$0
Aug 199504,11115.92$0
Jul 199504,31515.24$0
Jun 199504,18316.41$0
May 1995029117.56$0
Apr 199509217.73$0
Mar 199508816.44$0
Feb 199504916.58$0
Jan 199505815.92$0
Dec 199405115.03$0
Nov 199405715.90$0
Oct 199405215.58$0
Sep 199405515.29$0
Aug 199406516.13$0
Jul 199405517.56$0
Jun 199404517.09$0
May 199402415.88$0
Apr 199404914.14$0
Mar 199405312.46$0
Feb 199404612.50$0
Jan 199405612.66$0
Dec 1993013312.33$0
Nov 1993013214.49$0
Oct 1993015115.85$0
Sep 1993016815.03$0
Aug 1993019915.66$0
Jul 1993015615.46$0
Jun 1993015616.79$0
May 1993016017.68$0
Apr 1993015218.05$0
Mar 1993017718.14$0
Feb 1993018617.90$0
Jan 1993019316.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2019 — as filed, then multipliedworked
Condensate             0 bbl  × $ 53.47 =         $0
Gas                    6 Mcf  × $  2.42 =        $15

────────────────────────────────────────────────────
Month total                                      $15

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/73015 is the state's own key, not one this site invented.