JONES-EDWARDS

Operated by VARGAS ENERGY, LTD. (P-5 882868) in the COLEEN (MARBLE FALLS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 75714District 7BField 19476600CondensateGasSave
Value, all time
$67 k
Jan 1993 – Dec 2010
Value, last 12 filed months
$0
at the published price for each month
Months reported
216
no gaps in the span
Streams
2
condensate, gas

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition16 bbl$326
GasProduction19,769 Mcf$66,843
Total$67,169

5,257 Mcf of this lease's gas, across 43 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.8171, -97.9162. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.81709, -97.91619 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,200 ft
1 wells filed one
Completion to plug
33.1 years
median over 1 wells

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,200 ft.

Completions filed
Nov 1977
1 of 1 wells
Plug dates filed
Dec 2010
1 of 1 wells

Last completion to plug: a median of 33.1 years across the 1 well that filed both dates, with the middle half between 33.1 years and 33.1 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3673089955,200 ftNov 1977Dec 2010Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (216)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

216 months

Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 200902571.445.48$137
Nov 200908574.593.75$319
Oct 20090072.544.11$0
Sep 200903365.543.06$101
Aug 200908167.423.22$261
Jul 20090061.133.46$0
Jun 200902866.163.90$109
May 2009011454.743.93$448
Apr 2009014546.773.59$520
Mar 2009012142.144.06$491
Feb 200906532.814.63$301
Jan 2009018335.865.37$983
Dec 2008020337.105.98$1,213
Nov 2008016055.496.86$1,098
Oct 2008020875.246.92$1,440
Sep 200807101.767.88$55
Aug 2008028114.228.48$238
Jul 20080152131.0811.39$1,731
Jun 20080108131.3313.03$1,408
May 20080144123.1711.57$1,667
Apr 20080188110.3110.45$1,966
Mar 20080169101.909.66$1,633
Feb 2008012992.538.77$1,131
Jan 2008010190.388.21$829
Dec 20070088.337.30$0
Nov 20070991.677.29$66
Oct 200709482.856.92$651
Sep 200702375.846.24$144
Aug 200701469.066.39$89
Jul 200702070.906.39$128
Jun 200703662.007.55$272
May 20070058.747.85$0
Apr 200701259.617.81$94
Mar 200705056.927.30$365
Feb 200703355.108.22$271
Jan 200703350.306.73$222
Dec 200604156.656.92$284
Nov 200603254.207.62$244
Oct 20060454.906.01$24
Sep 200603560.085.04$176
Aug 200602668.717.34$191
Jul 20060769.376.34$44
Jun 20060966.286.38$57
May 200602866.016.42$180
Apr 200602964.397.36$213
Mar 200604556.707.08$319
Feb 200602257.597.75$171
Jan 200605560.598.93$491
Dec 200507654.9413.42$1,020
Nov 20050054.6910.59$0
Oct 2005012758.3413.80$1,752
Sep 2005012761.4512.08$1,534
Aug 2005010861.519.80$1,058
Jul 200505655.697.84$439
Jun 200509152.337.38$672
May 200509045.226.65$599
Apr 200506949.207.36$508
Mar 200507850.377.15$558
Feb 200505645.226.31$353
Jan 2005013143.166.32$828
Dec 200406039.866.75$405
Nov 200405445.286.33$342
Oct 200408249.706.52$534
Sep 200407843.245.28$412
Aug 200403742.375.55$205
Jul 200406738.286.08$408
Jun 2004011636.106.43$746
May 200406337.486.49$409
Apr 200405834.475.86$340
Mar 200404534.365.53$249
Feb 2004011432.455.51$628
Jan 2004018032.036.30$1,134
Dec 200301130.266.30$69
Nov 20030228.804.60$9
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030229.415.17$10
Jun 200301728.565.98$102
May 200303626.595.97$215
Apr 200303926.675.41$211
Mar 200305531.146.10$335
Feb 200303533.487.93$277
Jan 200306530.315.58$363
Dec 200209226.914.85$447
Nov 200207024.664.14$290
Oct 2002010226.464.23$431
Sep 200205227.443.64$189
Aug 2002010925.963.16$345
Jul 200207424.583.06$227
Jun 2002012223.733.34$407
May 2002018824.663.58$674
Apr 200209823.653.51$344
Mar 2002010722.003.10$332
Feb 2002011618.222.38$276
Jan 2002010817.172.38$257
Dec 2001018616.932.36$440
Nov 20010718.072.41$17
Oct 2001011919.782.53$301
Sep 200106424.262.25$144
Aug 200187624.873.05$431
Jul 200109523.933.20$304
Jun 2001011324.563.82$432
May 2001010925.524.31$470
Apr 2001010324.685.34$550
Mar 200108924.545.38$479
Feb 200109727.755.77$559
Jan 200109927.478.40$831
Dec 200009326.889.12$848
Nov 2000010232.215.66$577
Oct 2000011931.235.15$612
Sep 2000010631.875.19$550
Aug 200004629.644.54$209
Jul 200009028.534.09$368
Jun 2000011829.304.40$519
May 200008527.263.68$313
Apr 2000011824.513.12$368
Mar 2000011828.422.86$337
Feb 2000016427.622.73$447
Jan 2000018225.272.48$451
Dec 1999023324.282.42$565
Nov 1999015723.192.43$382
Oct 1999013120.982.80$367
Sep 1999019021.752.62$498
Aug 1999019119.262.88$549
Jul 1999021217.892.37$503
Jun 1999016715.942.36$394
May 1999015915.792.32$369
Apr 1999010115.102.21$223
Mar 1999010212.471.84$188
Feb 199901989.981.82$360
Jan 1999017910.381.90$340
Dec 199801289.201.77$227
Nov 1998011610.892.19$254
Oct 1998012612.421.97$248
Sep 1998011812.592.08$246
Aug 1998013011.301.91$248
Jul 1998014111.742.24$315
Jun 1998025411.242.24$568
May 1998015712.622.21$346
Apr 1998017913.042.51$448
Mar 1998012412.802.31$286
Feb 1998013413.952.30$308
Jan 1998016814.702.15$362
Dec 1997017016.322.41$410
Nov 1997016318.193.09$503
Oct 1997014519.253.15$457
Sep 199707117.742.95$210
Aug 1997013917.862.55$355
Jul 1997018217.582.25$409
Jun 199709617.242.26$217
May 1997013218.972.31$305
Apr 199709917.882.08$206
Mar 1997015118.951.94$293
Feb 1997012020.492.21$265
Jan 1997015423.483.54$545
Dec 1996015323.32$0
Nov 1996017921.97$0
Oct 199609323.31$0
Sep 1996013022.22$0
Aug 1996017820.26$0
Jul 1996019719.55$0
Jun 1996015318.73$0
May 199608519.43$0
Apr 199608321.51$0
Mar 199608319.38$0
Feb 199607216.98$0
Jan 199609517.07$0
Dec 1995012417.19$0
Nov 1995010616.00$0
Oct 1995010715.43$0
Sep 1995013716.18$0
Aug 1995514515.92$80
Jul 1995011515.24$0
Jun 199508316.41$0
May 1995010417.56$0
Apr 1995013617.73$0
Mar 1995011516.44$0
Feb 199509916.58$0
Jan 1995019515.92$0
Dec 1994030015.03$0
Nov 199439215.90$48
Oct 199407115.58$0
Sep 19940015.29$0
Aug 1994012116.13$0
Jul 199403017.56$0
Jun 199407817.09$0
May 1994010515.88$0
Apr 19940014.14$0
Mar 199407112.46$0
Feb 1994014812.50$0
Jan 1994019912.66$0
Dec 1993021812.33$0
Nov 19930014.49$0
Oct 19930015.85$0
Sep 1993011715.03$0
Aug 1993018215.66$0
Jul 19930015.46$0
Jun 199305716.79$0
May 1993020217.68$0
Apr 1993010518.05$0
Mar 199307018.14$0
Feb 199305917.90$0
Jan 199306516.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2009 — as filed, then multipliedworked
Condensate             0 bbl  × $ 71.44 =         $0
Gas                   25 Mcf  × $  5.48 =       $137

────────────────────────────────────────────────────
Month total                                     $137

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/75714 is the state's own key, not one this site invented.