WALTERS

Operated by RAYLEE OPERATING COMPANY (P-5 695579) in the MEEKER (CONGLOMERATE 4400) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 77606District 7BField 60255410CondensateGasSaveExport
Value, all time
$86 k
Jan 1993 – Mar 2006
Value, last 12 filed months
$5 k
at the published price for each month
Months reported
159
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 55 leases and 56 wells, and the rule below applies to all of them.

Discovered
1974-02-12
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 160 acres.

The Commission's schedule remark for this field reads: OPT 160 AC W/4500 DIAG

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition534 bbl$8,946
GasProduction64,691 Mcf$76,992
Total$85,937

49,015 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.9734, -98.0869. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.97344, -98.08687 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,000 ft
1 wells filed one
Completion to plug
27.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,000 ft.

Completions filed
Jun 1978
1 of 1 wells
Plug dates filed
Mar 2006
1 of 1 wells

Last completion to plug: a median of 27.8 years across the 1 well that filed both dates, with the middle half between 27.8 years and 27.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3633062015,000 ftJun 1978Mar 2006Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (159)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

159 months

Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 2005036945.226.65$2,454
Apr 2005039849.207.36$2,929
Mar 2005045350.377.15$3,241
Feb 2005041645.226.31$2,626
Jan 2005034243.166.32$2,162
Dec 2004040139.866.75$2,707
Nov 2004034645.286.33$2,190
Oct 2004041949.706.52$2,730
Sep 2004047043.245.28$2,483
Aug 2004056342.375.55$3,125
Jul 2004047138.286.08$2,866
Jun 2004054636.106.43$3,512
May 2004046037.486.49$2,988
Apr 2004046434.475.86$2,718
Mar 2004028934.365.53$1,598
Feb 2004037032.455.51$2,039
Jan 2004051732.036.30$3,257
Dec 2003040730.266.30$2,565
Nov 2003045728.804.60$2,100
Oct 2003047328.174.76$2,251
Sep 2003053726.314.75$2,550
Aug 2003047729.765.13$2,447
Jul 2003064029.415.17$3,309
Jun 200304928.565.98$293
May 2003255726.595.97$1,005
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 200207325.963.16$231
Jul 200207924.583.06$242
Jun 200205223.733.34$174
May 200205224.663.58$186
Apr 2002012823.653.51$450
Mar 2002013722.003.10$425
Feb 200205118.222.38$121
Jan 2002010117.172.38$240
Dec 200107616.932.36$180
Nov 20010018.072.41$0
Oct 200109519.782.53$240
Sep 20010624.262.25$14
Aug 20010524.873.05$15
Jul 200101523.933.20$48
Jun 200108224.563.82$314
May 2001010025.524.31$431
Apr 200109824.685.34$523
Mar 20010024.545.38$0
Feb 20010027.755.77$0
Jan 2001010727.478.40$899
Dec 200009126.889.12$830
Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 20000431.875.19$21
Aug 200005629.644.54$254
Jul 200004828.534.09$196
Jun 200005829.304.40$255
May 20000027.263.68$0
Apr 20000024.513.12$0
Mar 200008028.422.86$229
Feb 2000015727.622.73$428
Jan 200004525.272.48$112
Dec 1999020624.282.42$499
Nov 1999011823.192.43$287
Oct 1999014820.982.80$415
Sep 199901121.752.62$29
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 199901315.942.36$31
May 199905315.792.32$123
Apr 19990815.102.21$18
Mar 19990012.471.84$0
Feb 199901059.981.82$191
Jan 19990710.381.90$13
Dec 1998009.201.77$0
Nov 19980010.892.19$0
Oct 199804812.421.97$95
Sep 19980012.592.08$0
Aug 199802411.301.91$46
Jul 199802411.742.24$54
Jun 19980011.242.24$0
May 19980012.622.21$0
Apr 19980013.042.51$0
Mar 19980012.802.31$0
Feb 199801113.952.30$25
Jan 19980014.702.15$0
Dec 19970016.322.41$0
Nov 19970018.193.09$0
Oct 19970019.253.15$0
Sep 19970017.742.95$0
Aug 199701017.862.55$26
Jul 199703317.582.25$74
Jun 199701117.242.26$25
May 1997101918.972.31$1,937
Apr 199708217.882.08$171
Mar 199701,09418.951.94$2,121
Feb 1997077020.492.21$1,699
Jan 1997070423.483.54$2,492
Dec 1996074323.32$0
Nov 1996083521.97$0
Oct 199601,09023.31$0
Sep 199601,13222.22$0
Aug 1996088820.26$0
Jul 1996084319.55$0
Jun 1996090418.73$0
May 1996092019.43$0
Apr 1996091521.51$0
Mar 199601,10019.38$0
Feb 1996070716.98$0
Jan 1996098717.07$0
Dec 199501,02717.19$0
Nov 199501,04616.00$0
Oct 199501,02115.43$0
Sep 1995095416.18$0
Aug 199501,18215.92$0
Jul 1995081915.24$0
Jun 1995098216.41$0
May 199501,06517.56$0
Apr 199501,01917.73$0
Mar 199501,08016.44$0
Feb 199513794916.58$2,271
Jan 199501,11915.92$0
Dec 199401,09315.03$0
Nov 1994049715.90$0
Oct 1994094115.58$0
Sep 1994089615.29$0
Aug 199401,10016.13$0
Jul 199401,12517.56$0
Jun 1994074517.09$0
May 1994091015.88$0
Apr 199401,29614.14$0
Mar 199401,05412.46$0
Feb 199410987112.50$1,363
Jan 199401,12612.66$0
Dec 199301,01712.33$0
Nov 199301,10014.49$0
Oct 1993089415.85$0
Sep 199301,13115.03$0
Aug 199301,14815.66$0
Jul 199301,40115.46$0
Jun 1993841,30716.79$1,410
May 199301,47917.68$0
Apr 199301,17018.05$0
Mar 199301,46618.14$0
Feb 1993055217.90$0
Jan 1993781,36916.93$1,321

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2005 — as filed, then multipliedworked
Condensate             0 bbl  × $ 45.22 =         $0
Gas                  369 Mcf  × $  6.65 =     $2,454

────────────────────────────────────────────────────
Month total                                   $2,454

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/77606 is the state's own key, not one this site invented.