DRUMMOND, TOM

Operated by AUGUSTA OIL & GAS INC (P-5 36858) in the THORNTON, SOUTH (CAPPS LIME) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 90699District 7BField 89578500CondensateGasSaveExport
Value, all time
$227 k
Jan 1993 – Mar 2007
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
171
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 4 leases and 4 wells, and the rule below applies to all of them.

Discovered
1959-01-04
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: ALLOC. SUSP. EFF 8/1/81

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition66 bbl$1,615
GasProduction52,588 Mcf$225,381
Total$226,996

8,973 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.3877, -99.8864. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.38773, -99.88638 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,444 ft
1 wells filed one
Completion to plug
26.4 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,444 ft.

Completions filed
Oct 1980
1 of 1 wells
Plug dates filed
Mar 2007
1 of 1 wells

Last completion to plug: a median of 26.4 years across the 1 well that filed both dates, with the middle half between 26.4 years and 26.4 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4413166344,444 ftOct 1980Mar 2007Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (171)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

171 months

Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 200604769.376.34$298
Jun 200607366.286.38$466
May 2006012266.016.42$784
Apr 2006016264.397.36$1,192
Mar 2006016756.707.08$1,183
Feb 2006021557.597.75$1,666
Jan 2006023560.598.93$2,099
Dec 2005034554.9413.42$4,628
Nov 2005044854.6910.59$4,744
Oct 2005031358.3413.80$4,318
Sep 2005030361.4512.08$3,660
Aug 2005036461.519.80$3,566
Jul 2005038855.697.84$3,043
Jun 2005039552.337.38$2,916
May 2005039345.226.65$2,614
Apr 2005039249.207.36$2,885
Mar 2005039450.377.15$2,819
Feb 2005031945.226.31$2,014
Jan 2005037943.166.32$2,396
Dec 2004039539.866.75$2,667
Nov 2004037245.286.33$2,355
Oct 2004042149.706.52$2,743
Sep 2004041243.245.28$2,177
Aug 2004049542.375.55$2,748
Jul 2004028538.286.08$1,734
Jun 2004040136.106.43$2,580
May 2004047937.486.49$3,111
Apr 2004045634.475.86$2,671
Mar 2004041934.365.53$2,317
Feb 2004035932.455.51$1,978
Jan 2004029632.036.30$1,865
Dec 2003040430.266.30$2,546
Nov 2003039728.804.60$1,824
Oct 2003046228.174.76$2,199
Sep 2003051426.314.75$2,441
Aug 2003058629.765.13$3,006
Jul 2003062629.415.17$3,237
Jun 2003045228.565.98$2,704
May 2003045026.595.97$2,688
Apr 2003048626.675.41$2,628
Mar 2003052731.146.10$3,213
Feb 2003051333.487.93$4,066
Jan 2003055430.315.58$3,092
Dec 2002059426.914.85$2,883
Nov 2002059624.664.14$2,466
Oct 2002065726.464.23$2,779
Sep 2002062827.443.64$2,283
Aug 2002066025.963.16$2,088
Jul 2002067724.583.06$2,073
Jun 2002067423.733.34$2,250
May 2002067724.663.58$2,426
Apr 2002067823.653.51$2,381
Mar 2002067722.003.10$2,101
Feb 2002063418.222.38$1,506
Jan 2002073817.172.38$1,753
Dec 2001078316.932.36$1,851
Nov 2001074318.072.41$1,787
Oct 2001078419.782.53$1,983
Sep 2001084524.262.25$1,902
Aug 2001090424.873.05$2,760
Jul 200101,02123.933.20$3,264
Jun 2001089724.563.82$3,430
May 2001091925.524.31$3,958
Apr 2001087224.685.34$4,652
Mar 2001096824.545.38$5,204
Feb 2001096627.755.77$5,571
Jan 200101,13027.478.40$9,491
Dec 200001,20126.889.12$10,956
Nov 200001,18232.215.66$6,688
Oct 200001,16131.235.15$5,974
Sep 200001,13331.875.19$5,876
Aug 2000085129.644.54$3,864
Jul 2000065028.534.09$2,658
Jun 2000037329.304.40$1,640
May 200001627.263.68$59
Apr 2000645024.513.12$1,724
Mar 200002828.422.86$80
Feb 200004827.622.73$131
Jan 200005125.272.48$127
Dec 199905524.282.42$133
Nov 199902323.192.43$56
Oct 199902120.982.80$59
Sep 199901621.752.62$42
Aug 199903819.262.88$109
Jul 199904117.892.37$97
Jun 199906015.942.36$142
May 199902215.792.32$51
Apr 199901015.102.21$22
Mar 199903012.471.84$55
Feb 19990329.981.82$58
Jan 199906710.381.90$127
Dec 199801149.201.77$202
Nov 199808110.892.19$177
Oct 199804812.421.97$95
Sep 1998019112.592.08$398
Aug 1998011011.301.91$210
Jul 199805311.742.24$119
Jun 199806411.242.24$143
May 199804012.622.21$88
Apr 19980713.042.51$18
Mar 199801212.802.31$28
Feb 199807313.952.30$168
Jan 199808514.702.15$183
Dec 1997012416.322.41$299
Nov 199705618.193.09$173
Oct 199707419.253.15$233
Sep 199702617.742.95$77
Aug 199704017.862.55$102
Jul 199706517.582.25$146
Jun 199704017.242.26$90
May 199702218.972.31$51
Apr 199704017.882.08$83
Mar 199702918.951.94$56
Feb 199706420.492.21$141
Jan 199706123.483.54$216
Dec 199604823.32$0
Nov 199605421.97$0
Oct 199623823.31$47
Sep 199603022.22$0
Aug 199603920.26$0
Jul 199605919.55$0
Jun 199606718.73$0
May 199606219.43$0
Apr 199605121.51$0
Mar 199607019.38$0
Feb 199607016.98$0
Jan 1996010317.07$0
Dec 199508217.19$0
Nov 1995013916.00$0
Oct 199504815.43$0
Sep 199505016.18$0
Aug 199506615.92$0
Jul 199506215.24$0
Jun 199505116.41$0
May 199507317.56$0
Apr 199506217.73$0
Mar 199509516.44$0
Feb 199509916.58$0
Jan 199508615.92$0
Dec 1994010015.03$0
Nov 1994011915.90$0
Oct 1994035715.58$0
Sep 1994037315.29$0
Aug 1994038916.13$0
Jul 1994037417.56$0
Jun 1994038917.09$0
May 1994032415.88$0
Apr 1994036814.14$0
Mar 1994037412.46$0
Feb 1994032812.50$0
Jan 1994030312.66$0
Dec 1993040512.33$0
Nov 1993039814.49$0
Oct 1993029015.85$0
Sep 1993034515.03$0
Aug 1993038615.66$0
Jul 1993040715.46$0
Jun 1993037316.79$0
May 1993028817.68$0
Apr 1993035318.05$0
Mar 1993011618.14$0
Feb 1993012317.90$0
Jan 199308716.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2006 — as filed, then multipliedworked
Condensate             0 bbl  × $ 69.37 =         $0
Gas                   47 Mcf  × $  6.34 =       $298

────────────────────────────────────────────────────
Month total                                     $298

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/90699 is the state's own key, not one this site invented.