HARTNETT

Operated by COOPER OIL & GAS, LLC (P-5 175118) in the BOGGY BOTTOM (STRAWN) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 92352District 7BField 10150500CondensateGasSaveExport
Value, all time
$10 k
Jan 1993 – May 2026
Value, last 12 filed months
$287
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 26 leases and 26 wells, and the rule below applies to all of them.

Discovered
1978-12-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres.

The Commission's schedule remark for this field reads: CHANGED FIELD TYPE TO CAPACITY EFFECTIVE 4-1-01.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition37 bbl$619
GasProduction4,303 Mcf$9,222
Total$9,841

2,087 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.9152, -98.3341. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.91524, -98.33409 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
4,200 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,200 ft.

Completions filed
Jan 1981
1 of 1 wells

1 well

42-3633208354,200 ftJan 1981

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202607106.413.05$21
Apr 20260798.932.87$20
Mar 20260789.753.15$22
Feb 20260663.503.75$23
Jan 20260659.138.00$48
Dec 20250756.664.41$31
Nov 20250658.593.93$24
Oct 20250759.383.30$23
Sep 20250662.743.08$18
Aug 20250663.933.01$18
Jul 20250666.743.32$20
Jun 20250666.483.13$19
May 20250760.553.23$23
Apr 20250762.363.54$25
Mar 20250867.704.27$34
Feb 20250670.884.34$26
Jan 20250674.324.28$26
Dec 20240768.993.12$22
Nov 20240469.052.20$9
Oct 20240571.372.28$11
Sep 20240369.612.36$7
Aug 20240675.632.06$12
Jul 20240279.932.15$4
Jun 20240078.082.63$0
May 20240278.812.20$4
Apr 20240284.451.66$3
Mar 20240280.301.55$3
Feb 20240176.091.78$2
Jan 20240173.023.30$3
Dec 20230271.262.61$5
Nov 20230177.892.81$3
Oct 20230285.443.09$6
Sep 20230189.042.74$3
Aug 20230180.522.67$3
Jul 20230274.852.64$5
Jun 20230268.962.26$5
May 20230270.622.23$4
Apr 20230278.122.24$4
Mar 20230272.852.39$5
Feb 20230175.112.47$2
Jan 20230176.533.39$3
Dec 20220176.415.73$6
Nov 20220185.005.65$6
Oct 20220287.185.86$12
Sep 20220284.888.16$16
Aug 20220294.529.13$18
Jul 202202101.587.54$15
Jun 202202115.097.98$16
May 202202109.378.43$17
Apr 202202104.226.84$14
Mar 202203108.885.08$15
Feb 20220291.054.86$10
Jan 20220281.844.54$9
Dec 20210271.323.90$8
Nov 20210277.435.24$10
Oct 20210379.795.71$17
Sep 20210269.865.35$11
Aug 20210266.024.22$8
Jul 20210270.783.98$8
Jun 20210269.493.38$7
May 20210263.483.02$6
Apr 20210160.362.76$3
Mar 20210361.302.72$8
Feb 20210257.805.55$11
Jan 20210350.412.81$8
Dec 20200244.642.68$5
Nov 20200238.772.71$5
Oct 20200336.972.48$7
Sep 20200137.091.99$2
Aug 20200339.982.39$7
Jul 20200338.371.83$5
Jun 20200234.901.69$3
May 20200216.921.81$4
Apr 20200214.751.80$4
Mar 20200330.341.86$6
Feb 20200149.881.98$2
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190158.482.74$3
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190150.852.79$3
Jan 20190146.033.23$3
Dec 20180146.594.19$4
Nov 20180152.934.24$4
Oct 20180061.443.40$0
Sep 20180259.543.11$6
Aug 20180259.403.07$6
Jul 20180265.142.93$6
Jun 20180260.183.08$6
May 20180165.382.90$3
Apr 20180163.842.90$3
Mar 20180161.222.79$3
Feb 20180161.782.77$3
Jan 20180262.874.01$8
Dec 20170157.272.92$3
Nov 20170155.423.12$3
Oct 20170149.292.98$3
Sep 20170147.523.09$3
Aug 20170145.373.00$3
Jul 20170143.873.09$3
Jun 20170242.493.09$6
May 20170145.373.26$3
Apr 20170047.933.21$0
Mar 20170146.772.98$3
Feb 20170150.452.95$3
Jan 20170149.413.42$3
Dec 20160248.763.72$7
Nov 20160142.492.64$3
Oct 20160246.193.09$6
Sep 20160241.553.10$6
Aug 20160241.442.92$6
Jul 20160241.622.92$6
Jun 20160245.352.69$5
May 20160242.521.99$4
Apr 20160236.561.99$4
Mar 20160333.011.79$5
Feb 20160326.472.06$6
Jan 20160327.352.36$7
Dec 20150332.362.00$6
Nov 20150338.792.17$7
Oct 20150343.552.43$7
Sep 20150342.992.76$8
Aug 20150340.162.87$9
Jul 20150248.152.95$6
Jun 20150256.152.88$6
May 20150255.212.96$6
Apr 20150149.822.71$3
Mar 20150342.892.93$9
Feb 20150244.662.98$6
Jan 20150343.433.10$9
Dec 20140354.693.59$11
Nov 20140270.464.25$9
Oct 20140278.303.90$8
Sep 20140386.164.05$12
Aug 20140289.394.04$8
Jul 20140296.564.18$8
Jun 20140298.164.74$9
May 20140394.734.73$14
Apr 20140395.944.81$14
Mar 20140395.895.06$15
Feb 20140297.406.19$12
Jan 20140390.404.86$15
Dec 20130391.824.35$13
Nov 20130488.853.74$15
Oct 20130097.423.78$0
Sep 201304104.113.72$15
Aug 201303104.253.52$11
Jul 201303102.523.72$11
Jun 20130394.403.93$12
May 20130294.834.15$8
Apr 20130293.964.28$9
Mar 20130393.623.91$12
Feb 20130391.233.42$10
Jan 20130391.603.42$10
Dec 20120386.773.42$10
Nov 20120386.953.62$11
Oct 20120389.383.40$10
Sep 20120394.672.92$9
Aug 20120392.662.91$9
Jul 20120385.133.02$9
Jun 20120379.822.52$8
May 20120391.612.49$7
Apr 201203101.652.00$6
Mar 201203105.052.22$7
Feb 201202101.102.57$5
Jan 20120398.092.73$8
Dec 20110296.873.24$6
Nov 20110295.723.31$7
Oct 20110284.983.65$7
Sep 20110283.623.99$8
Aug 20110383.404.15$12
Jul 20110294.144.52$9
Jun 20110292.904.64$9
May 20110298.134.40$9
Apr 201102105.964.33$9
Mar 20110296.364.06$8
Feb 20110285.644.18$8
Jan 20110286.504.59$9
Dec 20100285.734.35$9
Nov 20100180.843.80$4
Oct 20100378.103.51$11
Sep 20100272.633.98$8
Aug 20100273.684.42$9
Jul 20100272.554.74$9
Jun 20100370.364.91$15
May 20100271.124.24$8
Apr 20100381.694.12$12
Mar 20100378.394.39$13
Feb 20100773.585.44$38
Jan 20100474.365.96$24
Dec 20090271.445.48$11
Nov 20090074.593.75$0
Oct 20090472.544.11$16
Sep 20090765.543.06$21
Aug 20090767.423.22$23
Jul 20090561.133.46$17
Jun 20090566.163.90$19
May 20090054.743.93$0
Apr 20090746.773.59$25
Mar 20090742.144.06$28
Feb 20090732.814.63$32
Jan 20090735.865.37$38
Dec 20080737.105.98$42
Nov 20080755.496.86$48
Oct 20080775.246.92$48
Sep 200808101.767.88$63
Aug 200807114.228.48$59
Jul 200807131.0811.39$80
Jun 200807131.3313.03$91
May 200802123.1711.57$23
Apr 200806110.3110.45$63
Mar 200807101.909.66$68
Feb 20080592.538.77$44
Jan 20080590.388.21$41
Dec 20070488.337.30$29
Nov 20070491.677.29$29
Oct 20070582.856.92$35
Sep 20070575.846.24$31
Aug 20070569.066.39$32
Jul 20070570.906.39$32
Jun 20070562.007.55$38
May 20070558.747.85$39
Apr 20070559.617.81$39
Mar 20070756.927.30$51
Feb 20070655.108.22$49
Jan 20070550.306.73$34
Dec 20060356.656.92$21
Nov 20060854.207.62$61
Oct 20060954.906.01$54
Sep 20060560.085.04$25
Aug 20060768.717.34$51
Jul 20060969.376.34$57
Jun 20060766.286.38$45
May 20060466.016.42$26
Apr 20060664.397.36$44
Mar 20060856.707.08$57
Feb 20060857.597.75$62
Jan 20060860.598.93$71
Dec 20050154.9413.42$13
Nov 20050354.6910.59$32
Oct 20050658.3413.80$83
Sep 20050661.4512.08$72
Aug 20050661.519.80$59
Jul 20050555.697.84$39
Jun 20050752.337.38$52
May 20050745.226.65$47
Apr 20050649.207.36$44
Mar 20050650.377.15$43
Feb 20050645.226.31$38
Jan 20050543.166.32$32
Dec 20040639.866.75$41
Nov 20040545.286.33$32
Oct 20040749.706.52$46
Sep 20040743.245.28$37
Aug 20040642.375.55$33
Jul 20040738.286.08$43
Jun 20040736.106.43$45
May 20040737.486.49$45
Apr 200401134.475.86$64
Mar 200401034.365.53$55
Feb 200401032.455.51$55
Jan 20040932.036.30$57
Dec 200301330.266.30$82
Nov 200301128.804.60$51
Oct 200301428.174.76$67
Sep 200301626.314.75$76
Aug 200301829.765.13$92
Jul 200311829.415.17$122
Jun 200301728.565.98$102
May 200301626.595.97$96
Apr 200302326.675.41$124
Mar 200302131.146.10$128
Feb 200301833.487.93$143
Jan 200302230.315.58$123
Dec 200202226.914.85$107
Nov 200202224.664.14$91
Oct 200202526.464.23$106
Sep 200202027.443.64$73
Aug 200201825.963.16$57
Jul 200202024.583.06$61
Jun 200201423.733.34$47
May 200201324.663.58$47
Apr 200201223.653.51$42
Mar 20020922.003.10$28
Feb 200201118.222.38$26
Jan 200201317.172.38$31
Dec 200101216.932.36$28
Nov 200101318.072.41$31
Oct 200101419.782.53$35
Sep 200101424.262.25$32
Aug 200101424.873.05$43
Jul 200101523.933.20$48
Jun 200101424.563.82$54
May 200101625.524.31$69
Apr 200101624.685.34$85
Mar 200101424.545.38$75
Feb 200101127.755.77$63
Jan 20010627.478.40$50
Dec 20000726.889.12$64
Nov 20000932.215.66$51
Oct 200001131.235.15$57
Sep 200001331.875.19$67
Aug 20000929.644.54$41
Jul 20000928.534.09$37
Jun 200001029.304.40$44
May 200001127.263.68$40
Apr 20000924.513.12$28
Mar 200001228.422.86$34
Feb 200001227.622.73$33
Jan 200001525.272.48$37
Dec 199901524.282.42$36
Nov 199901423.192.43$34
Oct 199901520.982.80$42
Sep 199901321.752.62$34
Aug 199901219.262.88$35
Jul 199901117.892.37$26
Jun 19990915.942.36$21
May 199911215.792.32$44
Apr 199901415.102.21$31
Mar 199901412.471.84$26
Feb 19990149.981.82$25
Jan 199901410.381.90$27
Dec 19980149.201.77$25
Nov 199801710.892.19$37
Oct 199801612.421.97$32
Sep 199801512.592.08$31
Aug 199801811.301.91$34
Jul 199801611.742.24$36
Jun 199801811.242.24$40
May 199801712.622.21$38
Apr 199801813.042.51$45
Mar 199801812.802.31$42
Feb 199801613.952.30$37
Jan 199801814.702.15$39
Dec 199701916.322.41$46
Nov 199701618.193.09$49
Oct 199702019.253.15$63
Sep 199702117.742.95$62
Aug 199702217.862.55$56
Jul 199701817.582.25$40
Jun 199712117.242.26$65
May 199702118.972.31$48
Apr 199702517.882.08$52
Mar 199702618.951.94$50
Feb 199702420.492.21$53
Jan 199701923.483.54$67
Dec 199602223.32$0
Nov 199602221.97$0
Oct 199601923.31$0
Sep 199601922.22$0
Aug 199601720.26$0
Jul 199601119.55$0
Jun 199601618.73$0
May 199601419.43$0
Apr 199601221.51$0
Mar 199601819.38$0
Feb 199601516.98$0
Jan 199601517.07$0
Dec 199501717.19$0
Nov 199501716.00$0
Oct 199501815.43$0
Sep 199501016.18$0
Aug 199501015.92$0
Jul 199502015.24$0
Jun 199501816.41$0
May 19950617.56$0
Apr 199511817.73$18
Mar 199502216.44$0
Feb 199501416.58$0
Jan 199511915.92$16
Dec 199401615.03$0
Nov 199411615.90$16
Oct 199402215.58$0
Sep 199402415.29$0
Aug 199403416.13$0
Jul 199412717.56$18
Jun 199403317.09$0
May 199405015.88$0
Apr 199413514.14$14
Mar 199414912.46$12
Feb 199403112.50$0
Jan 199424512.66$25
Dec 199314012.33$12
Nov 199323714.49$29
Oct 199307115.85$0
Sep 1993412115.03$60
Aug 199308315.66$0
Jul 1993011415.46$0
Jun 1993514216.79$84
May 1993019817.68$0
Apr 199349318.05$72
Mar 1993618618.14$109
Feb 1993410217.90$72
Jan 1993012916.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                    7 Mcf  × $  3.05 =        $21

────────────────────────────────────────────────────
Month total                                      $21

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/92352 is the state's own key, not one this site invented.