WESTMORELAD

Operated by MARSHALL, SAM (P-5 527835) in the ALEDO, S (MARBLE FALLS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 93667District 7BField 01402100NGPA filingCondensateGasSaveExport
Value, all time
$28 k
Jan 1993 – Feb 2008
Value, last 12 filed months
$234
at the published price for each month
Months reported
182
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 3 leases and 3 wells, and the rule below applies to all of them.

Discovered
1980-01-21
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA2none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition32 bbl$1,612
GasProduction10,682 Mcf$26,271
Total$27,883

5,050 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.6035, -97.5598. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.60351, -97.55976 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,284 ft
1 wells filed one
Completion to plug
26.9 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,284 ft.

Completions filed
Mar 1981
1 of 1 wells
Plug dates filed
Feb 2008
1 of 1 wells

Last completion to plug: a median of 26.9 years across the 1 well that filed both dates, with the middle half between 26.9 years and 26.9 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-367319371 T6,284 ftMar 1981Feb 2008Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (182)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

182 months

Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070175.846.24$6
Aug 20070469.066.39$26
Jul 20070670.906.39$38
Jun 20070362.007.55$23
May 200701158.747.85$86
Apr 20070759.617.81$55
Mar 20070056.927.30$0
Feb 200702055.108.22$164
Jan 20070150.306.73$7
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 2005010054.9413.42$1,342
Nov 200509054.6910.59$953
Oct 200507058.3413.80$966
Sep 200509961.4512.08$1,196
Aug 2005010561.519.80$1,029
Jul 20050755.697.84$55
Jun 200505052.337.38$369
May 200501145.226.65$73
Apr 200507349.207.36$537
Mar 200532050.377.15$1,612
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 200401438.286.08$85
Jun 200401736.106.43$109
May 200406037.486.49$390
Apr 20040034.475.86$0
Mar 2004010034.365.53$553
Feb 200408232.455.51$452
Jan 2004010032.036.30$630
Dec 2003014930.266.30$939
Nov 2003010228.804.60$469
Oct 2003016128.174.76$766
Sep 2003015426.314.75$731
Aug 200303229.765.13$164
Jul 2003016029.415.17$827
Jun 2003033528.565.98$2,004
May 200303826.595.97$227
Apr 200303626.675.41$195
Mar 200303731.146.10$226
Feb 200303733.487.93$293
Jan 200304230.315.58$234
Dec 200204726.914.85$228
Nov 200204224.664.14$174
Oct 200204326.464.23$182
Sep 200204827.443.64$174
Aug 200205325.963.16$168
Jul 200205224.583.06$159
Jun 200205623.733.34$187
May 200207624.663.58$272
Apr 20020223.653.51$7
Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 200202817.172.38$67
Dec 200103416.932.36$80
Nov 200103418.072.41$82
Oct 200103519.782.53$89
Sep 200104024.262.25$90
Aug 200103924.873.05$119
Jul 200104023.933.20$128
Jun 200103424.563.82$130
May 200103525.524.31$151
Apr 200103724.685.34$197
Mar 200103624.545.38$194
Feb 200103327.755.77$190
Jan 200103927.478.40$328
Dec 200004126.889.12$374
Nov 200003632.215.66$204
Oct 200003331.235.15$170
Sep 200003531.875.19$182
Aug 200004229.644.54$191
Jul 200004228.534.09$172
Jun 200003429.304.40$150
May 200003627.263.68$132
Apr 200004124.513.12$128
Mar 200004028.422.86$114
Feb 200003827.622.73$104
Jan 200004425.272.48$109
Dec 199904824.282.42$116
Nov 199904623.192.43$112
Oct 199904220.982.80$118
Sep 199904221.752.62$110
Aug 199904219.262.88$121
Jul 199905017.892.37$119
Jun 199904115.942.36$97
May 199904515.792.32$104
Apr 199905015.102.21$110
Mar 199904912.471.84$90
Feb 19990459.981.82$82
Jan 199904810.381.90$91
Dec 19980559.201.77$98
Nov 199804810.892.19$105
Oct 199805412.421.97$106
Sep 199805312.592.08$110
Aug 199805611.301.91$107
Jul 199805911.742.24$132
Jun 199805811.242.24$130
May 199806212.622.21$137
Apr 199806213.042.51$155
Mar 199806312.802.31$145
Feb 199805913.952.30$136
Jan 199806514.702.15$140
Dec 199706516.322.41$157
Nov 199706518.193.09$201
Oct 199703319.253.15$104
Sep 199705617.742.95$165
Aug 199706517.862.55$166
Jul 199706917.582.25$155
Jun 199706017.242.26$135
May 199706118.972.31$141
Apr 199706117.882.08$127
Mar 199706518.951.94$126
Feb 199706320.492.21$139
Jan 199706823.483.54$241
Dec 199608323.32$0
Nov 199606521.97$0
Oct 199608523.31$0
Sep 199608322.22$0
Aug 199608520.26$0
Jul 199608319.55$0
Jun 199608118.73$0
May 199608619.43$0
Apr 199609121.51$0
Mar 1996010819.38$0
Feb 199608216.98$0
Jan 1996010817.07$0
Dec 1995011417.19$0
Nov 1995011316.00$0
Oct 1995011015.43$0
Sep 1995012216.18$0
Aug 199509615.92$0
Jul 199508315.24$0
Jun 199508016.41$0
May 199509017.56$0
Apr 199508817.73$0
Mar 199509616.44$0
Feb 199507616.58$0
Jan 199509615.92$0
Dec 199409415.03$0
Nov 199409415.90$0
Oct 1994010815.58$0
Sep 1994010915.29$0
Aug 1994011016.13$0
Jul 1994011417.56$0
Jun 1994010917.09$0
May 1994011815.88$0
Apr 1994011414.14$0
Mar 1994011912.46$0
Feb 1994010712.50$0
Jan 1994011812.66$0
Dec 1993012812.33$0
Nov 1993011714.49$0
Oct 1993012115.85$0
Sep 1993011415.03$0
Aug 1993012615.66$0
Jul 1993013115.46$0
Jun 1993012816.79$0
May 1993013617.68$0
Apr 1993013218.05$0
Mar 1993013718.14$0
Feb 1993013117.90$0
Jan 1993013116.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2007 — as filed, then multipliedworked
Condensate             0 bbl  × $ 75.84 =         $0
Gas                    1 Mcf  × $  6.24 =         $6

────────────────────────────────────────────────────
Month total                                       $6

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/G/93667 is the state's own key, not one this site invented.