CAMP & PARKS

Operated by SOUTHWEST GAS SYSTEMS, INC. (P-5 806190) in the BROWN COUNTY REGULAR field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 21667District 7BField 12406001OilCasinghead gasSaveExport
Value, all time
$260 k
Jan 1993 – May 2026
Value, last 12 filed months
$10 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,213 leases and 2,962 wells, and the rule below applies to all of them.

Discovered
1917-12-31
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition765 bbl$32,261
Casinghead gasProduction66,703 Mcf$227,351
Total$259,612

13,745 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.8802, -99.0847. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.88019, -99.08473 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
2,558 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 2,558 ft.

Completions filed
Jan 1979
1 of 1 wells

1 well

42-0493175612,558 ftJan 1979

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 20260131106.413.05$399
Apr 2026016398.932.87$468
Mar 2026014389.753.15$450
Feb 2026013463.503.75$503
Jan 2026011259.138.00$896
Dec 2025015756.664.41$693
Nov 2025016958.593.93$664
Oct 2025015759.383.30$519
Sep 2025018662.743.08$572
Aug 2025016063.933.01$482
Jul 2025549866.743.32$3,929
Jun 2025011066.483.13$344
May 202508860.553.23$284
Apr 202508462.363.54$298
Mar 2025010867.704.27$461
Feb 202507370.884.34$317
Jan 202508874.324.28$377
Dec 2024010168.993.12$315
Nov 2024013669.052.20$299
Oct 2024012771.372.28$290
Sep 2024012669.612.36$298
Aug 2024011975.632.06$246
Jul 2024011779.932.15$251
Jun 2024011678.082.63$306
May 2024011778.812.20$257
Apr 2024011684.451.66$192
Mar 2024011280.301.55$173
Feb 2024011076.091.78$196
Jan 20240473.023.30$13
Dec 2023012071.262.61$313
Nov 2023011477.892.81$320
Oct 2023011285.443.09$346
Sep 2023010689.042.74$290
Aug 2023013580.522.67$361
Jul 2023014474.852.64$380
Jun 2023013368.962.26$300
May 2023013270.622.23$294
Apr 2023014078.122.24$313
Mar 2023010072.852.39$239
Feb 202305375.112.47$131
Jan 2023011576.533.39$390
Dec 2022011576.415.73$659
Nov 202209985.005.65$559
Oct 2022010787.185.86$627
Sep 2022010284.888.16$833
Aug 2022014494.529.13$1,314
Jul 20220141101.587.54$1,063
Jun 20220140115.097.98$1,117
May 20220149109.378.43$1,257
Apr 20220140104.226.84$957
Mar 20220149108.885.08$756
Feb 202209391.054.86$452
Jan 202209981.844.54$449
Dec 2021013371.323.90$519
Nov 2021014077.435.24$733
Oct 2021013679.795.71$777
Sep 2021014269.865.35$760
Aug 2021015766.024.22$663
Jul 2021014870.783.98$589
Jun 2021014969.493.38$504
May 2021015563.483.02$468
Apr 2021011460.362.76$314
Mar 2021013261.302.72$359
Feb 202109557.805.55$527
Jan 2021011850.412.81$332
Dec 2020010344.642.68$276
Nov 2020010638.772.71$287
Oct 2020014936.972.48$369
Sep 2020014037.091.99$279
Aug 2020014039.982.39$334
Jul 2020013138.371.83$239
Jun 2020012634.901.69$213
May 2020012316.921.81$223
Apr 202007114.751.80$128
Mar 2020010830.341.86$200
Feb 202009849.881.98$194
Jan 2020011757.252.09$245
Dec 2019011059.012.30$253
Nov 2019010355.302.75$283
Oct 2019013853.472.42$334
Sep 2019013755.052.66$364
Aug 2019015953.112.30$366
Jul 201908556.272.46$209
Jun 201909952.782.49$247
May 20197914758.482.74$5,023
Apr 2019012362.632.75$338
Mar 2019612256.803.06$714
Feb 2019011350.852.79$316
Jan 2019013346.033.23$429
Dec 2018010646.594.19$444
Nov 2018010052.934.24$424
Oct 2018017561.443.40$595
Sep 2018013159.543.11$407
Aug 2018012259.403.07$374
Jul 2018013465.142.93$393
Jun 2018014460.183.08$443
May 2018013465.382.90$389
Apr 2018012163.842.90$351
Mar 2018012161.222.79$337
Feb 2018012461.782.77$343
Jan 2018013662.874.01$545
Dec 2017011057.272.92$321
Nov 2017014055.423.12$437
Oct 2017012149.292.98$361
Sep 2017011947.523.09$367
Aug 2017013045.373.00$391
Jul 2017013243.873.09$408
Jun 2017011842.493.09$364
May 2017012145.373.26$395
Apr 2017012047.933.21$385
Mar 2017012746.772.98$379
Feb 2017010050.452.95$295
Jan 2017012449.413.42$424
Dec 201608948.763.72$331
Nov 2016011742.492.64$309
Oct 2016012046.193.09$371
Sep 2016010641.553.10$329
Aug 2016012541.442.92$366
Jul 2016013641.622.92$398
Jun 2016012245.352.69$328
May 2016012842.521.99$255
Apr 2016013236.561.99$263
Mar 2016012533.011.79$224
Feb 2016010526.472.06$217
Jan 201609727.352.36$229
Dec 201509932.362.00$198
Nov 201507138.792.17$154
Oct 201509843.552.43$238
Sep 2015012142.992.76$334
Aug 2015012140.162.87$348
Jul 2015012648.152.95$371
Jun 2015011856.152.88$340
May 2015012555.212.96$369
Apr 2015011949.822.71$322
Mar 2015011842.892.93$346
Feb 2015012844.662.98$381
Jan 20150043.433.10$0
Dec 2014013754.693.59$492
Nov 2014011270.464.25$476
Oct 2014013878.303.90$538
Sep 2014014486.164.05$583
Aug 2014014289.394.04$573
Jul 2014014796.564.18$614
Jun 2014014098.164.74$663
May 2014012594.734.73$591
Apr 2014015095.944.81$721
Mar 2014014795.895.06$743
Feb 2014010997.406.19$675
Jan 201408090.404.86$389
Dec 201309591.824.35$414
Nov 201308988.853.74$333
Oct 2013010597.423.78$397
Sep 20136283104.113.72$6,763
Aug 20130112104.253.52$395
Jul 20130106102.523.72$394
Jun 201307494.403.93$291
May 201309894.834.15$407
Apr 2013015793.964.28$672
Mar 2013013093.623.91$509
Feb 2013014891.233.42$506
Jan 2013015091.603.42$513
Dec 2012016386.773.42$557
Nov 2012018586.953.62$671
Oct 2012018689.383.40$632
Sep 2012018594.672.92$540
Aug 2012017592.662.91$509
Jul 2012021485.133.02$646
Jun 2012017779.822.52$446
May 2012017291.612.49$428
Apr 20120175101.652.00$349
Mar 20120179105.052.22$398
Feb 20120157101.102.57$404
Jan 2012011298.092.73$306
Dec 2011015896.873.24$512
Nov 2011016795.723.31$553
Oct 2011018084.983.65$657
Sep 2011018883.623.99$749
Aug 2011017783.404.15$734
Jul 2011019394.144.52$872
Jun 2011020192.904.64$933
May 2011019798.134.40$868
Apr 20110194105.964.33$841
Mar 2011020296.364.06$820
Feb 2011015785.644.18$656
Jan 2011021586.504.59$987
Dec 2010015485.734.35$670
Nov 2010016580.843.80$626
Oct 2010016278.103.51$568
Sep 2010018172.633.98$720
Aug 2010018673.684.42$822
Jul 2010017672.554.74$834
Jun 2010021070.364.91$1,031
May 2010014371.124.24$606
Apr 2010018281.694.12$750
Mar 2010017078.394.39$746
Feb 2010013773.585.44$746
Jan 20107117774.365.96$6,335
Dec 2009017471.445.48$954
Nov 2009017474.593.75$653
Oct 2009020172.544.11$826
Sep 2009018165.543.06$555
Aug 2009019567.423.22$628
Jul 2009015461.133.46$534
Jun 2009017866.163.90$693
May 2009018954.743.93$742
Apr 2009018046.773.59$646
Mar 2009021242.144.06$861
Feb 2009014032.814.63$649
Jan 2009013335.865.37$714
Dec 2008017537.105.98$1,046
Nov 2008017555.496.86$1,201
Oct 2008022875.246.92$1,578
Sep 20080205101.767.88$1,615
Aug 20080184114.228.48$1,561
Jul 2008089131.0811.39$1,014
Jun 20080193131.3313.03$2,515
May 20080199123.1711.57$2,303
Apr 20080163110.3110.45$1,704
Mar 20080178101.909.66$1,720
Feb 2008014392.538.77$1,254
Jan 2008017290.388.21$1,411
Dec 2007019688.337.30$1,431
Nov 2007016091.677.29$1,167
Oct 2007019282.856.92$1,329
Sep 2007016175.846.24$1,005
Aug 2007022369.066.39$1,425
Jul 2007019270.906.39$1,226
Jun 2007021062.007.55$1,585
May 2007017558.747.85$1,373
Apr 2007019359.617.81$1,506
Mar 20074619756.927.30$4,057
Feb 2007021055.108.22$1,725
Jan 2007019450.306.73$1,305
Dec 2006021056.656.92$1,453
Nov 2006021354.207.62$1,623
Oct 2006024954.906.01$1,497
Sep 2006018260.085.04$917
Aug 2006018368.717.34$1,343
Jul 2006012669.376.34$799
Jun 2006012566.286.38$798
May 2006015466.016.42$989
Apr 2006012664.397.36$927
Mar 2006011356.707.08$800
Feb 200608557.597.75$659
Jan 200609760.598.93$867
Dec 200509954.9413.42$1,328
Nov 2005013754.6910.59$1,451
Oct 2005013758.3413.80$1,890
Sep 2005014661.4512.08$1,764
Aug 2005015561.519.80$1,519
Jul 2005015255.697.84$1,192
Jun 2005014752.337.38$1,085
May 2005014345.226.65$951
Apr 2005012049.207.36$883
Mar 2005012450.377.15$887
Feb 2005011645.226.31$732
Jan 2005011543.166.32$727
Dec 2004010139.866.75$682
Nov 2004010845.286.33$684
Oct 2004016149.706.52$1,049
Sep 2004015543.245.28$819
Aug 2004019542.375.55$1,082
Jul 2004018438.286.08$1,119
Jun 2004021836.106.43$1,402
May 20043920837.486.49$2,813
Apr 2004020834.475.86$1,219
Mar 2004023334.365.53$1,289
Feb 2004017632.455.51$970
Jan 2004015032.036.30$945
Dec 2003014530.266.30$914
Nov 2003018028.804.60$827
Oct 2003020528.174.76$976
Sep 2003023526.314.75$1,116
Aug 2003021929.765.13$1,123
Jul 2003021329.415.17$1,101
Jun 2003022428.565.98$1,340
May 2003020626.595.97$1,230
Apr 2003021026.675.41$1,136
Mar 2003022431.146.10$1,366
Feb 2003020033.487.93$1,585
Jan 2003018230.315.58$1,016
Dec 2002015726.914.85$762
Nov 20028816424.664.14$2,849
Oct 2002018426.464.23$778
Sep 2002012727.443.64$462
Aug 2002017525.963.16$554
Jul 2002020924.583.06$640
Jun 2002022123.733.34$738
May 2002020924.663.58$749
Apr 2002014223.653.51$499
Mar 2002016022.003.10$496
Feb 2002018018.222.38$428
Jan 2002019617.172.38$466
Dec 2001027416.932.36$648
Nov 2001016618.072.41$399
Oct 2001011119.782.53$281
Sep 2001015424.262.25$347
Aug 2001014524.873.05$443
Jul 2001015723.933.20$502
Jun 2001010624.563.82$405
May 2001013325.524.31$573
Apr 2001017924.685.34$955
Mar 2001013924.545.38$747
Feb 2001015527.755.77$894
Jan 2001016427.478.40$1,377
Dec 20002715326.889.12$2,122
Nov 2000013032.215.66$736
Oct 2000016731.235.15$859
Sep 2000015931.875.19$825
Aug 2000016729.644.54$758
Jul 2000014928.534.09$609
Jun 2000015229.304.40$668
May 2000017627.263.68$648
Apr 2000017624.513.12$548
Mar 2000018728.422.86$535
Feb 2000015227.622.73$414
Jan 2000017825.272.48$442
Dec 199935024.282.42$850
Nov 19990023.192.43$0
Oct 19990020.982.80$0
Sep 1999017621.752.62$461
Aug 1999018919.262.88$543
Jul 1999015517.892.37$368
Jun 1999017315.942.36$409
May 1999019415.792.32$450
Apr 1999020215.102.21$446
Mar 1999021412.471.84$393
Feb 199901689.981.82$305
Jan 1999018010.381.90$342
Dec 199802029.201.77$358
Nov 1998020210.892.19$442
Oct 19985319512.421.97$1,042
Sep 1998019012.592.08$396
Aug 1998022111.301.91$422
Jul 19981122111.742.24$624
Jun 1998121811.242.24$499
May 1998019212.622.21$424
Apr 1998020513.042.51$514
Mar 1998014212.802.31$328
Feb 1998011713.952.30$269
Jan 1998020314.702.15$437
Dec 1997019816.322.41$477
Nov 1997020018.193.09$618
Oct 1997020019.253.15$630
Sep 1997022817.742.95$674
Aug 1997024617.862.55$628
Jul 1997026117.582.25$586
Jun 1997023017.242.26$519
May 1997027118.972.31$626
Apr 1997024617.882.08$512
Mar 1997024618.951.94$477
Feb 19972921020.492.21$1,057
Jan 1997022823.483.54$807
Dec 1996024323.32$0
Nov 1996023821.97$0
Oct 1996024523.31$0
Sep 1996027122.22$0
Aug 1996026820.26$0
Jul 1996028719.55$0
Jun 1996025018.73$0
May 1996029219.43$0
Apr 1996027621.51$0
Mar 1996028719.38$0
Feb 1996022016.98$0
Jan 1996024717.07$0
Dec 19954325617.19$739
Nov 1995024516.00$0
Oct 1995028615.43$0
Sep 1995921416.18$146
Aug 1995029315.92$0
Jul 1995028415.24$0
Jun 1995030516.41$0
May 1995328617.56$53
Apr 1995027717.73$0
Mar 1995030616.44$0
Feb 1995027816.58$0
Jan 1995029715.92$0
Dec 1994027715.03$0
Nov 1994030615.90$0
Oct 19945327515.58$826
Sep 1994029215.29$0
Aug 1994029716.13$0
Jul 1994034117.56$0
Jun 1994030717.09$0
May 19941129315.88$175
Apr 1994026914.14$0
Mar 1994031312.46$0
Feb 1994029012.50$0
Jan 1994033212.66$0
Dec 1993029512.33$0
Nov 1993029114.49$0
Oct 1993030115.85$0
Sep 1993025715.03$0
Aug 1993033915.66$0
Jul 1993031315.46$0
Jun 1993029016.79$0
May 1993030517.68$0
Apr 1993030718.05$0
Mar 1993032318.14$0
Feb 19934535617.90$806
Jan 1993032516.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Oil                    0 bbl  × $106.41 =         $0
Casinghead gas       131 Mcf  × $  3.05 =       $399

────────────────────────────────────────────────────
Month total                                     $399

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/O/21667 is the state's own key, not one this site invented.