STOVER, DON "B"

Operated by MCCLYMOND, LTD. (P-5 541455) in the WILLIAMS (MARBLE FALLS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 22024District 7BField 97601600OilCasinghead gasSaveExport
Value, all time
$6 k
Jan 1993 – May 2003
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
125
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 33 leases and 38 wells, and the rule below applies to all of them.

Discovered
1984-06-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
660 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 1984-10-01.

The Commission's schedule remark for this field reads: NET GOR W/ FLD. RULES.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition318 bbl$5,951
Casinghead gasProduction22,494 Mcf$0
Total$5,951

22,494 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.0476, -99.0226. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.04757, -99.02258 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
3,220 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,220 ft.

Completions filed
May 1978
1 of 1 wells

1 well

42-0493168823,220 ftMay 1978Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (125)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

125 months

May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 200359031.146.10$1,837
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 20010016.932.36$0
Nov 20010018.072.41$0
Oct 20010019.782.53$0
Sep 20010024.262.25$0
Aug 20010024.873.05$0
Jul 20010023.933.20$0
Jun 20010024.563.82$0
May 20010025.524.31$0
Apr 20010024.685.34$0
Mar 20010024.545.38$0
Feb 20010027.755.77$0
Jan 20010027.478.40$0
Dec 20000026.889.12$0
Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 20000031.875.19$0
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 20000029.304.40$0
May 20000027.263.68$0
Apr 20000024.513.12$0
Mar 20000028.422.86$0
Feb 20000027.622.73$0
Jan 20000025.272.48$0
Dec 19990024.282.42$0
Nov 19990023.192.43$0
Oct 19990020.982.80$0
Sep 19990021.752.62$0
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 19990015.942.36$0
May 19990015.792.32$0
Apr 19990015.102.21$0
Mar 19990012.471.84$0
Feb 1999009.981.82$0
Jan 19990010.381.90$0
Dec 1998009.201.77$0
Nov 19980010.892.19$0
Oct 19980012.421.97$0
Sep 19980012.592.08$0
Aug 19980011.301.91$0
Jul 19980011.742.24$0
Jun 19980011.242.24$0
May 19980012.622.21$0
Apr 19980013.042.51$0
Mar 19980012.802.31$0
Feb 19980013.952.30$0
Jan 19980014.702.15$0
Dec 19970016.322.41$0
Nov 19970018.193.09$0
Oct 19970019.253.15$0
Sep 19970017.742.95$0
Aug 19970017.862.55$0
Jul 19970017.582.25$0
Jun 19970017.242.26$0
May 19970018.972.31$0
Apr 19970017.882.08$0
Mar 19970018.951.94$0
Feb 19970020.492.21$0
Jan 19970023.483.54$0
Dec 1996056023.32$0
Nov 1996046121.97$0
Oct 1996036423.31$0
Sep 1996037622.22$0
Aug 1996051520.26$0
Jul 1996055119.55$0
Jun 1996066818.73$0
May 1996061619.43$0
Apr 1996059921.51$0
Mar 1996065019.38$0
Feb 1996059016.98$0
Jan 1996059817.07$0
Dec 1995059717.19$0
Nov 199516960816.00$2,704
Oct 1995063415.43$0
Sep 1995060016.18$0
Aug 1995062415.92$0
Jul 1995060915.24$0
Jun 1995063716.41$0
May 1995063717.56$0
Apr 1995055317.73$0
Mar 1995054216.44$0
Feb 1995049216.58$0
Jan 1995070715.92$0
Dec 1994062615.03$0
Nov 1994062015.90$0
Oct 1994069415.58$0
Sep 1994054915.29$0
Aug 1994056216.13$0
Jul 1994052717.56$0
Jun 1994046517.09$0
May 1994048715.88$0
Apr 1994044214.14$0
Mar 1994043012.46$0
Feb 1994037212.50$0
Jan 1994032212.66$0
Dec 1993038012.33$0
Nov 1993037014.49$0
Oct 1993031715.85$0
Sep 1993017015.03$0
Aug 19939011715.66$1,409
Jul 1993012415.46$0
Jun 1993013716.79$0
May 1993026317.68$0
Apr 1993026218.05$0
Mar 1993021818.14$0
Feb 1993012817.90$0
Jan 1993012416.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2003 — as filed, then multipliedworked
Oil                   59 bbl  × $ 31.14 =     $1,837
Casinghead gas         0 Mcf  × $  6.10 =         $0

────────────────────────────────────────────────────
Month total                                   $1,837

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/O/22024 is the state's own key, not one this site invented.