SHAFFER

Operated by ANDERSON, JAMES K. INC. (P-5 22275) in the MALBETAN (FLIPPEN SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 23639District 7BField 56897700OilCasinghead gasSaveExport
Value, all time
$1.1 M
Jan 1993 – Feb 2007
Value, last 12 filed months
$0
at the published price for each month
Months reported
170
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 4 leases and 4 wells, and the rule below applies to all of them.

Discovered
1986-03-01
as the register files it
Field class
Oil
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition59,891 bbl$1,072,273
Casinghead gasProduction13,699 Mcf$13,726
Total$1,085,999

9,701 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.1894, -99.9769. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.18939, -99.97691 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
2,840 ft
1 wells filed one
Completion to plug
27.4 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 2,840 ft.

Completions filed
Dec 1978
1 of 1 wells
Plug dates filed
May 2006
1 of 1 wells

Last completion to plug: a median of 27.4 years across the 1 well that filed both dates, with the middle half between 27.4 years and 27.4 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4413128822,840 ftDec 1978May 2006Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (170)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

170 months

Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 2005151043.166.32$6,517
Dec 20040039.866.75$0
Nov 200403045.286.33$190
Oct 20041713049.706.52$8,694
Sep 200403043.245.28$159
Aug 200403042.375.55$167
Jul 20041643038.286.08$6,460
Jun 200403036.106.43$193
May 200403037.486.49$195
Apr 20041673034.475.86$5,932
Mar 200403034.365.53$166
Feb 200403032.455.51$165
Jan 20041673032.036.30$5,538
Dec 200303030.266.30$189
Nov 20031813028.804.60$5,351
Oct 200303028.174.76$143
Sep 200303026.314.75$142
Aug 20031813029.765.13$5,540
Jul 200303029.415.17$155
Jun 20031743028.565.98$5,149
May 200303026.595.97$179
Apr 20031783026.675.41$4,909
Mar 200303031.146.10$183
Feb 20031803033.487.93$6,264
Jan 200303030.315.58$167
Dec 20021793026.914.85$4,963
Nov 200203024.664.14$124
Oct 20021803026.464.23$4,890
Sep 200203027.443.64$109
Aug 20021803025.963.16$4,768
Jul 200203024.583.06$92
Jun 20021803023.733.34$4,372
May 20021583024.663.58$4,004
Apr 200203023.653.51$105
Mar 20021523022.003.10$3,437
Feb 20021723018.222.38$3,205
Jan 200203017.172.38$71
Dec 20011683016.932.36$2,915
Nov 20011813018.072.41$3,343
Oct 20011803019.782.53$3,636
Sep 200103024.262.25$68
Aug 20011593024.873.05$4,046
Jul 20011733023.933.20$4,236
Jun 20011753024.563.82$4,413
May 2001233025.524.31$716
Apr 20011803024.685.34$4,602
Mar 20011783024.545.38$4,529
Feb 20011643027.755.77$4,724
Jan 200103027.478.40$252
Dec 20001843026.889.12$5,220
Nov 20001803032.215.66$5,968
Oct 20001803031.235.15$5,776
Sep 20001813031.875.19$5,924
Aug 20001813029.644.54$5,501
Jul 20001803028.534.09$5,258
Jun 20001813029.304.40$5,435
May 20003413027.263.68$9,406
Apr 20001843024.513.12$4,603
Mar 20003213028.422.86$9,209
Feb 20003613027.622.73$10,053
Jan 20003683025.272.48$9,374
Dec 19993563024.282.42$8,716
Nov 19993683023.192.43$8,607
Oct 19993723020.982.80$7,889
Sep 19995183021.752.62$11,345
Aug 19993653019.262.88$7,116
Jul 19995393017.892.37$9,714
Jun 19993583015.942.36$5,777
May 19995273015.792.32$8,391
Apr 19993693015.102.21$5,638
Mar 19995373012.471.84$6,752
Feb 1999369309.981.82$3,737
Jan 19993653010.381.90$3,846
Dec 1998345309.201.77$3,227
Nov 19983713010.892.19$4,106
Oct 19983613012.421.97$4,543
Sep 19985433012.592.08$6,899
Aug 19983613011.301.91$4,137
Jul 19985343011.742.24$6,336
Jun 19985513011.242.24$6,260
May 19985403012.622.21$6,881
Apr 19985683013.042.51$7,482
Mar 19987113012.802.31$9,170
Feb 199854511213.952.30$7,860
Jan 199856711214.702.15$8,576
Dec 199757411216.322.41$9,638
Nov 199756811218.193.09$10,678
Oct 199756411219.253.15$11,210
Sep 199772211217.742.95$13,139
Aug 199754111217.862.55$9,948
Jul 199755211217.582.25$9,956
Jun 199755411217.242.26$9,804
May 199753711218.972.31$10,445
Apr 199772011217.882.08$13,107
Mar 199754011218.951.94$10,450
Feb 199758111220.492.21$12,152
Jan 199755011223.483.54$13,310
Dec 199655911223.32$13,036
Nov 199673611221.97$16,170
Oct 199653511223.31$12,471
Sep 199672311222.22$16,065
Aug 199656111220.26$11,366
Jul 199655511219.55$10,850
Jun 199655711218.73$10,433
May 199673911219.43$14,359
Apr 199636911221.51$7,937
Mar 199618911219.38$3,663
Feb 199655411216.98$9,407
Jan 199654111217.07$9,235
Dec 199572211217.19$12,411
Nov 199554511216.00$8,720
Oct 199571011215.43$10,955
Sep 199574811216.18$12,103
Aug 199555811215.92$8,883
Jul 199573611215.24$11,217
Jun 199572711216.41$11,930
May 199569511217.56$12,204
Apr 199556811217.73$10,071
Mar 199571311216.44$11,722
Feb 199575811216.58$12,568
Jan 199570811215.92$11,271
Dec 199475211215.03$11,303
Nov 199475311215.90$11,973
Oct 199473311215.58$11,420
Sep 199488811215.29$13,578
Aug 199492911216.13$14,985
Jul 199474133817.56$13,012
Jun 199474032617.09$12,647
May 199474233815.88$11,783
Apr 199475032114.14$10,605
Mar 199494233912.46$11,737
Feb 199470931312.50$8,863
Jan 199495134412.66$12,040
Dec 199374434512.33$9,174
Nov 199375633014.49$10,954
Oct 199393334115.85$14,788
Sep 199374733415.03$11,227
Aug 199373632815.66$11,526
Jul 199392334815.46$14,270
Jun 199374033716.79$12,425
May 199393635417.68$16,548
Apr 199393435218.05$16,859
Mar 199394136218.14$17,070
Feb 199374534017.90$13,336
Jan 199393936316.93$15,897

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2005 — as filed, then multipliedworked
Oil                  151 bbl  × $ 43.16 =     $6,517
Casinghead gas         0 Mcf  × $  6.32 =         $0

────────────────────────────────────────────────────
Month total                                   $6,517

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/O/23639 is the state's own key, not one this site invented.