STATE OF TEXAS

Operated by CC OIL & GAS (P-5 140617) in the STEPHENS COUNTY REGULAR field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 25462District 7BField 85948001Hydrogen sulphide fieldOilCasinghead gasSaveExport
Value, all time
$596 k
Jan 1993 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1,255 leases and 4,008 wells, and the rule below applies to all of them.

Discovered
1916-12-31
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: CLASS 4 W/DAILY 150 = 6000 TO 8000'

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition18,537 bbl$486,953
Casinghead gasProduction23,775 Mcf$109,177
Total$596,130

28 Mcf of this lease's gas, across 28 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.8731, -98.9830. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.87313, -98.98296 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,523 ft
1 wells filed one
Completion to plug
1 well filed both, dated out of order

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,523 ft.

Completions filed
Jul 1989
1 of 1 wells
Plug dates filed
Jun 1984
1 of 1 wells

Last completion to plug: no median is published. 1 well on this lease filed both dates, and on that one the last completion is dated after the plug date, so there is no interval to take a median of. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4293411314,523 ftJul 1989Jun 1984

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 2024190071.372.28$13,560
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 202001139.982.39$26
Jul 202001038.371.83$18
Jun 202006434.901.69$108
May 202009716.921.81$176
Apr 2020011514.751.80$208
Mar 2020010130.341.86$187
Feb 202008749.881.98$172
Jan 202009957.252.09$207
Dec 201907559.012.30$173
Nov 201907855.302.75$215
Oct 201908553.472.42$206
Sep 2019011055.052.66$292
Aug 2019010753.112.30$247
Jul 201906556.272.46$160
Jun 201909652.782.49$239
May 201907658.482.74$208
Apr 20191767562.632.75$11,229
Mar 201905756.803.06$175
Feb 201904650.852.79$128
Jan 201902446.033.23$77
Dec 201802746.594.19$113
Nov 201807552.934.24$318
Oct 2018012061.443.40$408
Sep 2018013359.543.11$413
Aug 2018013359.403.07$408
Jul 201809365.142.93$273
Jun 201804360.183.08$132
May 201801065.382.90$29
Apr 2018010363.842.90$299
Mar 201805861.222.79$162
Feb 201805661.782.77$155
Jan 201804162.874.01$164
Dec 201703857.272.92$111
Nov 201705755.423.12$178
Oct 201705449.292.98$161
Sep 201705347.523.09$164
Aug 201704945.373.00$147
Jul 201705743.873.09$176
Jun 201706442.493.09$198
May 201709445.373.26$307
Apr 2017011047.933.21$353
Mar 2017013246.772.98$394
Feb 20171659150.452.95$8,593
Jan 2017014349.413.42$489
Dec 2016014348.763.72$532
Nov 2016014942.492.64$394
Oct 2016016546.193.09$510
Sep 201609341.553.10$288
Aug 2016015041.442.92$439
Jul 2016017841.622.92$521
Jun 2016017045.352.69$457
May 2016015642.521.99$311
Apr 2016016236.561.99$323
Mar 2016010533.011.79$188
Feb 2016012726.472.06$262
Jan 201609527.352.36$225
Dec 201508432.362.00$168
Nov 2015011238.792.17$243
Oct 201504643.552.43$112
Sep 2015010642.992.76$292
Aug 2015013340.162.87$382
Jul 2015013548.152.95$398
Jun 2015014256.152.88$409
May 2015011255.212.96$331
Apr 2015013349.822.71$360
Mar 2015014142.892.93$414
Feb 2015010744.662.98$318
Jan 2015012343.433.10$381
Dec 2014013854.693.59$496
Nov 2014015070.464.25$638
Oct 201418819178.303.90$15,465
Sep 2014020086.164.05$809
Aug 2014018489.394.04$742
Jul 2014017796.564.18$740
Jun 2014018998.164.74$895
May 2014019594.734.73$922
Apr 2014018495.944.81$885
Mar 2014018995.895.06$956
Feb 2014016797.406.19$1,034
Jan 2014017290.404.86$836
Dec 2013015091.824.35$653
Nov 2013012388.853.74$460
Oct 2013015497.423.78$582
Sep 20130139104.113.72$517
Aug 2013182153104.253.52$19,512
Jul 2013090102.523.72$335
Jun 2013015294.403.93$598
May 2013025194.834.15$1,041
Apr 2013023493.964.28$1,002
Mar 2013022493.623.91$876
Feb 2013023791.233.42$811
Jan 2013026991.603.42$920
Dec 2012026286.773.42$896
Nov 2012029186.953.62$1,055
Oct 2012025989.383.40$881
Sep 201211916394.672.92$11,741
Aug 2012015392.662.91$445
Jul 2012016285.133.02$489
Jun 2012015179.822.52$380
May 2012013791.612.49$341
Apr 2012170130101.652.00$17,540
Mar 2012087105.052.22$193
Feb 2012084101.102.57$216
Jan 201208098.092.73$219
Dec 201108196.873.24$262
Nov 2011017895.723.31$589
Oct 2011017884.983.65$649
Sep 2011012283.623.99$486
Aug 201101483.404.15$58
Jul 201101394.144.52$59
Jun 201104092.904.64$186
May 2011018098.134.40$793
Apr 20110258105.964.33$1,118
Mar 2011028196.364.06$1,140
Feb 2011023585.644.18$982
Jan 2011027686.504.59$1,267
Dec 2010020185.734.35$874
Nov 201009480.843.80$357
Oct 2010010478.103.51$365
Sep 201009772.633.98$386
Aug 201004773.684.42$208
Jul 201009772.554.74$459
Jun 201009170.364.91$447
May 201016912871.124.24$12,561
Apr 2010013181.694.12$540
Mar 2010013478.394.39$588
Feb 2010011673.585.44$631
Jan 2010012974.365.96$769
Dec 2009011071.445.48$603
Nov 200908774.593.75$326
Oct 200909472.544.11$386
Sep 200904765.543.06$144
Aug 200905767.423.22$183
Jul 2009012961.133.46$447
Jun 2009011966.163.90$464
May 2009013554.743.93$530
Apr 2009014546.773.59$520
Mar 200916015842.144.06$7,384
Feb 2009015132.814.63$700
Jan 2009014035.865.37$752
Dec 2008017437.105.98$1,040
Nov 2008017755.496.86$1,214
Oct 2008010275.246.92$706
Sep 2008026101.767.88$205
Aug 2008010114.228.48$85
Jul 2008042131.0811.39$478
Jun 2008060131.3313.03$782
May 2008065123.1711.57$752
Apr 2008070110.3110.45$732
Mar 20080164101.909.66$1,585
Feb 2008018192.538.77$1,587
Jan 2008015390.388.21$1,255
Dec 200717219788.337.30$16,631
Nov 2007020791.677.29$1,509
Oct 2007019082.856.92$1,315
Sep 200709775.846.24$606
Aug 2007011769.066.39$747
Jul 2007019470.906.39$1,239
Jun 2007020162.007.55$1,517
May 2007020158.747.85$1,577
Apr 2007020659.617.81$1,608
Mar 2007019256.927.30$1,402
Feb 200716718555.108.22$10,722
Jan 2007021450.306.73$1,440
Dec 2006016956.656.92$1,169
Nov 2006021754.207.62$1,653
Oct 2006022054.906.01$1,323
Sep 2006021860.085.04$1,098
Aug 200614727068.717.34$12,082
Jul 2006025669.376.34$1,624
Jun 2006023366.286.38$1,487
May 2006024766.016.42$1,587
Apr 2006026064.397.36$1,914
Mar 200617325556.707.08$11,615
Feb 2006026557.597.75$2,054
Jan 2006029060.598.93$2,591
Dec 2005011354.9413.42$1,516
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 2005170061.4512.08$10,447
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 2004139039.866.75$5,541
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 2004142042.375.55$6,017
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 2004148037.486.49$5,547
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 2004152032.036.30$4,869
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 2003165026.314.75$4,341
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 2003138026.595.97$3,669
Apr 20030026.675.41$0
Mar 2003169031.146.10$5,263
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 200258026.464.23$1,535
Sep 2002130027.443.64$3,567
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 2002180023.733.34$4,271
May 20020024.663.58$0
Apr 20020023.653.51$0
Mar 2002134122.003.10$2,951
Feb 2002147118.222.38$2,681
Jan 20020117.172.38$2
Dec 20010116.932.36$2
Nov 20010118.072.41$2
Oct 2001185119.782.53$3,662
Sep 20010124.262.25$2
Aug 2001183124.873.05$4,554
Jul 2001172123.933.20$4,119
Jun 20010124.563.82$4
May 20010125.524.31$4
Apr 2001166124.685.34$4,102
Mar 2001183124.545.38$4,496
Feb 2001183127.755.77$5,084
Jan 2001180127.478.40$4,953
Dec 2000184126.889.12$4,955
Nov 20000132.215.66$6
Oct 2000302131.235.15$9,437
Sep 20000131.875.19$5
Aug 2000131129.644.54$3,887
Jul 2000116128.534.09$3,314
Jun 2000124129.304.40$3,638
May 2000123127.263.68$3,357
Apr 2000119124.513.12$2,920
Mar 2000124128.422.86$3,527
Feb 2000250127.622.73$6,908
Jan 20000125.272.48$2
Dec 1999174124.282.42$4,227
Nov 1999129123.192.43$2,994
Oct 1999136120.982.80$2,856
Sep 1999184121.752.62$4,005
Aug 1999141119.262.88$2,719
Jul 1999133117.892.37$2,382
Jun 1999178115.942.36$2,840
May 1999178115.792.32$2,813
Apr 19990115.102.21$2
Mar 19990112.471.84$2
Feb 1999019.981.82$2
Jan 1999105110.381.90$1,092
Dec 199812119.201.77$1,115
Nov 1998136110.892.19$1,483
Oct 1998131112.421.97$1,629
Sep 1998119112.592.08$1,500
Aug 1998176111.301.91$1,991
Jul 1998172111.742.24$2,022
Jun 19980011.242.24$0
May 1998135112.622.21$1,706
Apr 1998123113.042.51$1,606
Mar 1998141112.802.31$1,807
Feb 1998159113.952.30$2,220
Jan 1998183114.702.15$2,692
Dec 1997173116.322.41$2,826
Nov 19970118.193.09$3
Oct 1997178119.253.15$3,430
Sep 1997173117.742.95$3,072
Aug 1997177117.862.55$3,164
Jul 19970117.582.25$2
Jun 1997181117.242.26$3,123
May 1997173118.972.31$3,284
Apr 1997183117.882.08$3,274
Mar 1997179118.951.94$3,394
Feb 19970120.492.21$2
Jan 19970123.483.54$4
Dec 1996171123.32$3,988
Nov 1996185121.97$4,064
Oct 1996173123.31$4,033
Sep 19960122.22$0
Aug 1996165120.26$3,343
Jul 1996186119.55$3,636
Jun 1996182118.73$3,409
May 1996290019.43$5,635
Apr 19960021.51$0
Mar 19960019.38$0
Feb 1996341016.98$5,790
Jan 19960017.07$0
Dec 19950017.19$0
Nov 1995173016.00$2,768
Oct 1995177015.43$2,731
Sep 1995167016.18$2,702
Aug 1995171015.92$2,722
Jul 1995172015.24$2,621
Jun 1995174016.41$2,855
May 1995173017.56$3,038
Apr 1995175017.73$3,103
Mar 1995158016.44$2,598
Feb 1995171016.58$2,835
Jan 1995174015.92$2,770
Dec 19940015.03$0
Nov 1994169015.90$2,687
Oct 1994173015.58$2,695
Sep 1994177115.29$2,706
Aug 1994174116.13$2,807
Jul 1994104117.56$1,826
Jun 1994323117.09$5,520
May 19940115.88$0
Apr 1994170114.14$2,404
Mar 1994320112.46$3,987
Feb 1994160112.50$2,000
Jan 1994164112.66$2,076
Dec 1993171112.33$2,108
Nov 19930114.49$0
Oct 1993174115.85$2,758
Sep 1993170115.03$2,555
Aug 1993180115.66$2,819
Jul 1993182115.46$2,814
Jun 1993182116.79$3,056
May 1993186117.68$3,288
Apr 1993183118.05$3,303
Mar 1993154118.14$2,794
Feb 1993141117.90$2,524
Jan 1993156116.93$2,641

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2024 — as filed, then multipliedworked
Oil                  190 bbl  × $ 71.37 =    $13,560
Casinghead gas         0 Mcf  × $  2.28 =         $0

────────────────────────────────────────────────────
Month total                                  $13,560

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/O/25462 is the state's own key, not one this site invented.