SAGE-OTT "A"

Operated by TRITEX RESOURCES, L.L.C. (P-5 871161) in the THRIFTY, S. (CHAPPEL REEF) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 25583District 7BField 89784500OilCasinghead gasSaveExport
Value, all time
$177 k
Jan 1993 – Aug 2007
Value, last 12 filed months
$44 k
at the published price for each month
Months reported
176
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 64 leases and 70 wells, and the rule below applies to all of them.

Discovered
1983-06-06
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: ALLOCATION FORMULA EFFECTIVE 03/01/2005.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition397 bbl$17,758
Casinghead gasProduction22,314 Mcf$159,450
Total$177,208

5 Mcf of this lease's gas, across 5 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.7644, -99.1450. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.76443, -99.14500 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
2,582 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 2,582 ft.

Completions filed
Sep 2006
1 of 1 wells

1 well

42-0493519822,582 ftSep 2006Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (176)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

176 months

Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 2007255058.747.85$14,979
Apr 20070059.617.81$0
Mar 2007072656.927.30$5,301
Feb 2007052755.108.22$4,330
Jan 2007062650.306.73$4,211
Dec 2006055356.656.92$3,826
Nov 2006060854.207.62$4,631
Oct 2006066254.906.01$3,981
Sep 2006053960.085.04$2,715
Aug 2006054268.717.34$3,978
Jul 2006055869.376.34$3,539
Jun 2006020766.286.38$1,321
May 2006061466.016.42$3,945
Apr 2006053964.397.36$3,967
Mar 2006054956.707.08$3,889
Feb 2006040057.597.75$3,100
Jan 2006053660.598.93$4,788
Dec 2005056754.9413.42$7,607
Nov 2005053754.6910.59$5,686
Oct 2005046558.3413.80$6,415
Sep 2005017061.4512.08$2,053
Aug 2005061861.519.80$6,054
Jul 2005043855.697.84$3,436
Jun 2005060052.337.38$4,429
May 2005062045.226.65$4,124
Apr 2005061149.207.36$4,497
Mar 2005073350.377.15$5,245
Feb 2005027845.226.31$1,755
Jan 2005014443.166.32$910
Dec 2004067339.866.75$4,543
Nov 2004045645.286.33$2,887
Oct 2004046849.706.52$3,049
Sep 2004057743.245.28$3,049
Aug 2004022642.375.55$1,254
Jul 2004057138.286.08$3,474
Jun 2004072136.106.43$4,638
May 2004076937.486.49$4,994
Apr 2004052634.475.86$3,082
Mar 2004056334.365.53$3,113
Feb 2004076832.455.51$4,231
Jan 2004058332.036.30$3,673
Dec 2003061830.266.30$3,894
Nov 2003039728.804.60$1,824
Oct 2003041828.174.76$1,990
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 20010016.932.36$0
Nov 20010018.072.41$0
Oct 20010019.782.53$0
Sep 20010024.262.25$0
Aug 20010024.873.05$0
Jul 20010023.933.20$0
Jun 20010024.563.82$0
May 20010025.524.31$0
Apr 20010024.685.34$0
Mar 20010024.545.38$0
Feb 20010027.755.77$0
Jan 20010027.478.40$0
Dec 20000026.889.12$0
Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 20000031.875.19$0
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 20000029.304.40$0
May 20000027.263.68$0
Apr 20000024.513.12$0
Mar 20000028.422.86$0
Feb 20000027.622.73$0
Jan 20000025.272.48$0
Dec 19990024.282.42$0
Nov 19990023.192.43$0
Oct 19990020.982.80$0
Sep 19990021.752.62$0
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 19990015.942.36$0
May 19990015.792.32$0
Apr 19990015.102.21$0
Mar 199949012.471.84$611
Feb 1999009.981.82$0
Jan 19990010.381.90$0
Dec 1998009.201.77$0
Nov 19980010.892.19$0
Oct 19980012.421.97$0
Sep 19980012.592.08$0
Aug 19980011.301.91$0
Jul 19980011.742.24$0
Jun 19980011.242.24$0
May 19980012.622.21$0
Apr 19980013.042.51$0
Mar 19980012.802.31$0
Feb 19980013.952.30$0
Jan 19980014.702.15$0
Dec 19970016.322.41$0
Nov 19970018.193.09$0
Oct 19970019.253.15$0
Sep 19970117.742.95$3
Aug 19970117.862.55$3
Jul 19970117.582.25$2
Jun 19970017.242.26$0
May 19970118.972.31$2
Apr 19970117.882.08$2
Mar 19970118.951.94$2
Feb 19970120.492.21$2
Jan 19970123.483.54$4
Dec 19960123.32$0
Nov 19960021.97$0
Oct 199693023.31$2,168
Sep 19960022.22$0
Aug 19960020.26$0
Jul 19960119.55$0
Jun 19960018.73$0
May 19960119.43$0
Apr 19960121.51$0
Mar 19960019.38$0
Feb 19960016.98$0
Jan 19960017.07$0
Dec 19950017.19$0
Nov 19950016.00$0
Oct 19950015.43$0
Sep 19950016.18$0
Aug 19950015.92$0
Jul 19950015.24$0
Jun 19950016.41$0
May 19950017.56$0
Apr 19950017.73$0
Mar 19950016.44$0
Feb 19950016.58$0
Jan 19950015.92$0
Dec 19940015.03$0
Nov 19940015.90$0
Oct 19940015.58$0
Sep 19940015.29$0
Aug 19940016.13$0
Jul 19940017.56$0
Jun 19940017.09$0
May 19940015.88$0
Apr 19940014.14$0
Mar 19940012.46$0
Feb 19940012.50$0
Jan 19940012.66$0
Dec 19930012.33$0
Nov 19930014.49$0
Oct 19930015.85$0
Sep 19930115.03$0
Aug 19930015.66$0
Jul 19930015.46$0
Jun 19930016.79$0
May 19930017.68$0
Apr 19930018.05$0
Mar 19930018.14$0
Feb 19930017.90$0
Jan 19930016.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2007 — as filed, then multipliedworked
Oil                  255 bbl  × $ 58.74 =    $14,979
Casinghead gas         0 Mcf  × $  7.85 =         $0

────────────────────────────────────────────────────
Month total                                  $14,979

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/O/25583 is the state's own key, not one this site invented.