CRAWFORD, A. D.

Operated by CHOLLA PETROLEUM, INC. (P-5 150683) in the STRAWN, NW. (MARBLE FALLS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 27025District 7BField 86577200OilCasinghead gasSaveExport
Value, all time
$818 k
Sep 1993 – Mar 2006
Value, last 12 filed months
$6 k
at the published price for each month
Months reported
151
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 155 leases and 252 wells, and the rule below applies to all of them.

Discovered
1958-08-18
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1987-12-21.

The Commission's schedule remark for this field reads: ALLOWABLES FOR WELLS IN THIS FIELD (DAMEKI NYERI).

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition38,554 bbl$634,106
Casinghead gasProduction163,901 Mcf$184,297
Total$818,403

102,123 Mcf of this lease's gas, across 39 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (3)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.6447, -98.4807. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.4 miles.

32.64473, -98.48066 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
3 of 3 wells
With a plug date
100.0%
3 of 3 wells
Median depth
3,925 ft
3 wells filed one
Completion to plug
11.2 years
median over 3 wells

What the state filed about each well

On the RRC proration schedule
3100.0%
A plug date is filed
3100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
3100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 3,537 and 3,956 ft, median 3,925 ft, over the 3 wells that filed a depth.

Completions filed
Sep 1993 – Jun 1994
3 of 3 wells
Plug dates filed
Sep 1999 – Feb 2006
3 of 3 wells

Last completion to plug: a median of 11.2 years across the 3 wells that filed both dates, with the middle half between 8.3 years and 11.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

3 wells

42-3633426463,537 ftJun 1994Sep 1999Yes
42-3633422533,925 ftFeb 1994Apr 2005Yes
42-3633420713,956 ftSep 1993Feb 2006Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (151)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

151 months

Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 200517045.226.65$769
Apr 2005109049.207.36$5,363
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 2004209042.375.55$8,855
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 200408534.475.86$498
Mar 2004011634.365.53$642
Feb 2004011432.455.51$628
Jan 2004015732.036.30$989
Dec 2003013430.266.30$844
Nov 2003027728.804.60$1,273
Oct 2003047728.174.76$2,270
Sep 2003054526.314.75$2,588
Aug 2003052729.765.13$2,703
Jul 2003038929.415.17$2,011
Jun 2003026628.565.98$1,591
May 2003027326.595.97$1,631
Apr 2003025126.675.41$1,357
Mar 2003049031.146.10$2,987
Feb 2003071333.487.93$5,651
Jan 2003034530.315.58$1,926
Dec 2002051626.914.85$2,505
Nov 2002043124.664.14$1,783
Oct 2002027926.464.23$1,180
Sep 2002035727.443.64$1,298
Aug 2002036525.963.16$1,155
Jul 2002038424.583.06$1,176
Jun 2002050323.733.34$1,679
May 2002050924.663.58$1,824
Apr 2002077423.653.51$2,719
Mar 2002031922.003.10$990
Feb 2002068518.222.38$1,627
Jan 2002073917.172.38$1,756
Dec 2001076116.932.36$1,799
Nov 20010018.072.41$0
Oct 20010019.782.53$0
Sep 20010024.262.25$0
Aug 20010024.873.05$0
Jul 2001032523.933.20$1,039
Jun 2001017824.563.82$681
May 2001030625.524.31$1,318
Apr 2001031824.685.34$1,697
Mar 2001044624.545.38$2,398
Feb 2001023627.755.77$1,361
Jan 2001020027.478.40$1,680
Dec 2000027826.889.12$2,536
Nov 2000032032.215.66$1,811
Oct 2000031331.235.15$1,611
Sep 2000032031.875.19$1,660
Aug 200018131129.644.54$6,777
Jul 2000051728.534.09$2,114
Jun 2000043829.304.40$1,926
May 2000067227.263.68$2,473
Apr 2000084224.513.12$2,624
Mar 2000098828.422.86$2,825
Feb 2000017127.622.73$466
Jan 2000012825.272.48$318
Dec 1999028424.282.42$688
Nov 199915061223.192.43$4,968
Oct 199901,21920.982.80$3,418
Sep 199901,07221.752.62$2,807
Aug 199916687419.262.88$5,710
Jul 199903,12517.892.37$7,414
Jun 19993501,28715.942.36$8,619
May 199901,37715.792.32$3,196
Apr 1999095315.102.21$2,104
Mar 19995191,18512.471.84$8,650
Feb 199901,3919.981.82$2,529
Jan 199901,43810.381.90$2,732
Dec 19981721,3639.201.77$3,999
Nov 19985021,33310.892.19$8,380
Oct 1998087112.421.97$1,715
Sep 1998091212.592.08$1,899
Aug 19981731,26411.301.91$4,366
Jul 19981741,23211.742.24$4,799
Jun 19981691,56311.242.24$5,396
May 19981741,44812.622.21$5,391
Apr 199801,34113.042.51$3,360
Mar 199801,01812.802.31$2,351
Feb 199831283513.952.30$6,272
Jan 199801,09914.702.15$2,368
Dec 199701,61616.322.41$3,896
Nov 19971721,55618.193.09$7,934
Oct 199702,02419.253.15$6,375
Sep 19971721,34917.742.95$7,037
Aug 19971721,18617.862.55$6,102
Jul 19971741,07517.582.25$5,474
Jun 199729971617.242.26$6,771
May 199717381118.972.31$5,154
Apr 199752141817.882.08$10,186
Mar 1997078618.951.94$1,524
Feb 199749798720.492.21$12,361
Jan 19977011,07023.483.54$20,247
Dec 19967021,26223.32$16,371
Nov 199601,57021.97$0
Oct 19963611,98523.31$8,415
Sep 19963511,58922.22$7,799
Aug 19961761,34020.26$3,566
Jul 199635760219.55$6,979
Jun 199653681218.73$10,039
May 199686193219.43$16,729
Apr 19963541,23021.51$7,615
Mar 19961,0491,05919.38$20,330
Feb 19965331,16016.98$9,050
Jan 199670695317.07$12,051
Dec 19958741,42517.19$15,024
Nov 19955341,55916.00$8,544
Oct 19951752,87615.43$2,700
Sep 19956813,13816.18$11,019
Aug 19955183,06715.92$8,247
Jul 19955153,19715.24$7,849
Jun 19951,0533,44516.41$17,280
May 19955173,57217.56$9,079
Apr 19955372,93517.73$9,521
Mar 19951,0283,30116.44$16,900
Feb 19958733,15616.58$14,474
Jan 19956963,53615.92$11,080
Dec 19948783,75015.03$13,196
Nov 19948744,30115.90$13,897
Oct 19941,2164,78415.58$18,945
Sep 19941,2214,56915.29$18,669
Aug 19941,4024,67316.13$22,614
Jul 19941,2234,07917.56$21,476
Jun 19941,2393,26917.09$21,175
May 19941,7683,66515.88$28,076
Apr 19941,7813,74014.14$25,183
Mar 19942,6604,73412.46$33,144
Feb 19942,1223,89612.50$26,525
Jan 19941,2313,86512.66$15,584
Dec 19931731,94112.33$2,133
Nov 19935211,00614.49$7,549
Oct 1993015015.85$0
Sep 19930015.03$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2005 — as filed, then multipliedworked
Oil                   17 bbl  × $ 45.22 =       $769
Casinghead gas         0 Mcf  × $  6.65 =         $0

────────────────────────────────────────────────────
Month total                                     $769

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/O/27025 is the state's own key, not one this site invented.