HARVEY

Operated by SMITH PIPE OF ABILENE (P-5 794745) in the ALYSSE (CANYON) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 27209District 7BField 02174100OilCasinghead gasSaveExport
Value, all time
$58 k
May 1994 – Sep 2002
Value, last 12 filed months
$0
at the published price for each month
Months reported
101
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1 leases and 1 wells, and the rule below applies to all of them.

Discovered
1994-05-07
as the register files it
Field class
Oil
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition3,429 bbl$58,089
Casinghead gasProduction4,427 Mcf$28
Total$58,116

4,416 Mcf of this lease's gas, across 30 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.5874, -100.2038. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.58745, -100.20376 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,900 ft
1 wells filed one
Completion to plug
8.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,900 ft.

Completions filed
May 1994
1 of 1 wells
Plug dates filed
Aug 2002
1 of 1 wells

Last completion to plug: a median of 8.3 years across the 1 well that filed both dates, with the middle half between 8.3 years and 8.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-1513239625,900 ftMay 1994Aug 2002Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (101)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

101 months

Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 20010016.932.36$0
Nov 20010018.072.41$0
Oct 20010019.782.53$0
Sep 20010024.262.25$0
Aug 20010024.873.05$0
Jul 20010023.933.20$0
Jun 20010024.563.82$0
May 20010025.524.31$0
Apr 20010024.685.34$0
Mar 20010024.545.38$0
Feb 20010027.755.77$0
Jan 20010027.478.40$0
Dec 20000026.889.12$0
Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 20000031.875.19$0
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 20000029.304.40$0
May 20000027.263.68$0
Apr 20000024.513.12$0
Mar 20000028.422.86$0
Feb 20000027.622.73$0
Jan 20000025.272.48$0
Dec 19990024.282.42$0
Nov 19990023.192.43$0
Oct 19990020.982.80$0
Sep 19990021.752.62$0
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 19990015.942.36$0
May 19990015.792.32$0
Apr 19990015.102.21$0
Mar 19990012.471.84$0
Feb 1999009.981.82$0
Jan 19990010.381.90$0
Dec 1998009.201.77$0
Nov 19980010.892.19$0
Oct 19980012.421.97$0
Sep 19980012.592.08$0
Aug 19980011.301.91$0
Jul 19980011.742.24$0
Jun 19980011.242.24$0
May 19980012.622.21$0
Apr 19980013.042.51$0
Mar 19980012.802.31$0
Feb 19980013.952.30$0
Jan 19980014.702.15$0
Dec 199720116.322.41$329
Nov 199720018.193.09$364
Oct 199720119.253.15$388
Sep 199720117.742.95$358
Aug 199720117.862.55$360
Jul 199720117.582.25$354
Jun 199720117.242.26$347
May 199720118.972.31$382
Apr 199720117.882.08$360
Mar 199720118.951.94$381
Feb 199742120.492.21$863
Jan 199720123.483.54$473
Dec 199620123.32$466
Nov 1996166121.97$3,647
Oct 19960123.31$0
Sep 19960122.22$0
Aug 19960120.26$0
Jul 19960119.55$0
Jun 1996173118.73$3,240
May 19960119.43$0
Apr 19960121.51$0
Mar 19960019.38$0
Feb 19960016.98$0
Jan 1996024817.07$0
Dec 1995024817.19$0
Nov 199516624016.00$2,656
Oct 1995021715.43$0
Sep 1995021016.18$0
Aug 1995021715.92$0
Jul 199516721715.24$2,545
Jun 1995021016.41$0
May 1995021017.56$0
Apr 1995021017.73$0
Mar 199515321716.44$2,515
Feb 1995019616.58$0
Jan 199514721715.92$2,340
Dec 199413721015.03$2,059
Nov 199426021015.90$4,134
Oct 199412821815.58$1,994
Sep 199432622415.29$4,985
Aug 199427421716.13$4,420
Jul 199445221717.56$7,937
Jun 199459821017.09$10,220
May 199404415.88$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 1997 — as filed, then multipliedworked
Oil                   20 bbl  × $ 16.32 =       $326
Casinghead gas         1 Mcf  × $  2.41 =         $2

────────────────────────────────────────────────────
Month total                                     $329

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/O/27209 is the state's own key, not one this site invented.