Operated by BRAKA OPERATING, L.L.C. (P-5 88563) in the REB (MARBLE FALLS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 28542District 7BField 75095500OilCasinghead gasSaveExport
Value, all time
$274 k
Oct 1998 – Mar 2020
Value, last 12 filed months
$657
at the published price for each month
Months reported
258
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 431 leases and 525 wells, and the rule below applies to all of them.

Discovered
1982-03-12
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1986-01-01.

The Commission's schedule remark for this field reads: EFF. 09-10-84 PER DOCKET #7B-82,934

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition4,062 bbl$192,122
Casinghead gasProduction17,164 Mcf$81,600
Total$273,723

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.4140, -98.8584. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.41401, -98.85844 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
3,458 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 3,458 ft.

Completions filed
Apr 1995
1 of 1 wells

1 well

42-1333632813,458 ftApr 1995Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (258)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

258 months

Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 202001057.252.09$21
Dec 201901359.012.30$30
Nov 201902055.302.75$55
Oct 201902753.472.42$65
Sep 201903555.052.66$93
Aug 201903853.112.30$88
Jul 201903556.272.46$86
Jun 201901452.782.49$35
May 201903258.482.74$88
Apr 201903562.632.75$96
Mar 2019010756.803.06$328
Feb 201903850.852.79$106
Jan 20190646.033.23$19
Dec 201801646.594.19$67
Nov 201802752.934.24$114
Oct 201803261.443.40$109
Sep 201803459.543.11$106
Aug 201805459.403.07$166
Jul 201806765.142.93$196
Jun 201807360.183.08$225
May 201805265.382.90$151
Apr 201804963.842.90$142
Mar 201803161.222.79$86
Feb 20180061.782.77$0
Jan 201815062.874.01$943
Dec 201705657.272.92$164
Nov 201705255.423.12$162
Oct 201705849.292.98$173
Sep 201706547.523.09$201
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 2017010745.373.26$349
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170449.413.42$14
Dec 201601148.763.72$41
Nov 201642542.492.64$1,798
Oct 201601046.193.09$31
Sep 201601041.553.10$31
Aug 201601541.442.92$44
Jul 201601641.622.92$47
Jun 201601445.352.69$38
May 20160842.521.99$16
Apr 201602636.561.99$52
Mar 201603233.011.79$57
Feb 201602826.472.06$58
Jan 201601627.352.36$38
Dec 201502832.362.00$56
Nov 201502638.792.17$56
Oct 201503143.552.43$75
Sep 201503442.992.76$94
Aug 201502740.162.87$78
Jul 201503148.152.95$91
Jun 201503056.152.88$86
May 201503355.212.96$98
Apr 201503149.822.71$84
Mar 201502842.892.93$82
Feb 201502544.662.98$74
Jan 201501943.433.10$59
Dec 201403554.693.59$126
Nov 2014653270.464.25$4,716
Oct 201403978.303.90$152
Sep 201404386.164.05$174
Aug 201404289.394.04$169
Jul 201403896.564.18$159
Jun 201402898.164.74$133
May 201408294.734.73$388
Apr 201408095.944.81$385
Mar 201405795.895.06$288
Feb 201406997.406.19$427
Jan 2014644890.404.86$6,019
Dec 201304991.824.35$213
Nov 201307888.853.74$292
Oct 2013015597.423.78$586
Sep 20130102104.113.72$379
Aug 20130104104.253.52$366
Jul 2013090102.523.72$335
Jun 2013010894.403.93$425
May 2013012494.834.15$514
Apr 201302593.964.28$107
Mar 2013243793.623.91$2,392
Feb 201302291.233.42$75
Jan 201304291.603.42$144
Dec 20120086.773.42$0
Nov 2012203086.953.62$1,848
Oct 201207589.383.40$255
Sep 2012304794.672.92$2,977
Aug 201205992.662.91$172
Jul 201205085.133.02$151
Jun 2012204979.822.52$1,720
May 201208591.612.49$212
Apr 20124374101.652.00$4,519
Mar 2012074105.052.22$164
Feb 2012015101.102.57$39
Jan 201201398.092.73$36
Dec 201101196.873.24$36
Nov 201102195.723.31$70
Oct 2011525284.983.65$4,609
Sep 201104083.623.99$159
Aug 201106783.404.15$278
Jul 201106194.144.52$276
Jun 201105492.904.64$251
May 201105298.134.40$229
Apr 2011620105.964.33$6,570
Mar 201103096.364.06$122
Feb 201101085.644.18$42
Jan 201105786.504.59$262
Dec 201005685.734.35$243
Nov 201006480.843.80$243
Oct 201008078.103.51$281
Sep 201004672.633.98$183
Aug 20100773.684.42$31
Jul 201001872.554.74$85
Jun 201004370.364.91$211
May 201004471.124.24$186
Apr 20100081.694.12$0
Mar 201004678.394.39$202
Feb 201005773.585.44$310
Jan 201005174.365.96$304
Dec 200905371.445.48$291
Nov 2009705274.593.75$5,416
Oct 2009011372.544.11$464
Sep 2009011865.543.06$362
Aug 2009010267.423.22$328
Jul 2009011261.133.46$388
Jun 2009728466.163.90$5,091
May 200903854.743.93$149
Apr 200903546.773.59$126
Mar 200905942.144.06$239
Feb 200907732.814.63$357
Jan 200909635.865.37$516
Dec 20086514937.105.98$3,302
Nov 2008015155.496.86$1,036
Oct 2008014975.246.92$1,031
Sep 200858111101.767.88$6,776
Aug 2008098114.228.48$831
Jul 20086594131.0811.39$9,591
Jun 2008090131.3313.03$1,173
May 20080100123.1711.57$1,157
Apr 200861115110.3110.45$7,931
Mar 2008095101.909.66$918
Feb 200833992.538.77$3,132
Jan 200803290.388.21$263
Dec 200706188.337.30$445
Nov 2007882191.677.29$8,220
Oct 200705082.856.92$346
Sep 200705575.846.24$343
Aug 20071074769.066.39$7,690
Jul 200705270.906.39$332
Jun 200706962.007.55$521
May 200707858.747.85$612
Apr 2007868059.617.81$5,751
Mar 200707056.927.30$511
Feb 200707455.108.22$608
Jan 20071017650.306.73$5,592
Dec 2006334156.656.92$2,153
Nov 200606554.207.62$495
Oct 200604754.906.01$283
Sep 200605960.085.04$297
Aug 2006795268.717.34$5,810
Jul 200607269.376.34$457
Jun 2006614966.286.38$4,356
May 200608166.016.42$520
Apr 200607264.397.36$530
Mar 2006978456.707.08$6,095
Feb 200608957.597.75$690
Jan 200606060.598.93$536
Dec 2005836454.9413.42$5,419
Nov 200509554.6910.59$1,006
Oct 200507458.3413.80$1,021
Sep 200506061.4512.08$725
Aug 20051065861.519.80$7,088
Jul 200505355.697.84$416
Jun 200505652.337.38$413
May 200506045.226.65$399
Apr 2005515149.207.36$2,885
Mar 200504550.377.15$322
Feb 2005816045.226.31$4,042
Jan 200508743.166.32$550
Dec 200409739.866.75$655
Nov 2004797945.286.33$4,077
Oct 200409649.706.52$625
Sep 200408743.245.28$460
Aug 2004769642.375.55$3,753
Jul 200409138.286.08$554
Jun 200409636.106.43$618
May 2004549437.486.49$2,634
Apr 200409934.475.86$580
Mar 20048510434.365.53$3,496
Feb 2004010432.455.51$573
Jan 2004010032.036.30$630
Dec 20035810030.266.30$2,385
Nov 200309428.804.60$432
Oct 2003869528.174.76$2,875
Sep 200308926.314.75$423
Aug 200309829.765.13$503
Jul 2003899129.415.17$3,088
Jun 200309128.565.98$544
May 200309326.595.97$555
Apr 2003778326.675.41$2,502
Mar 200308131.146.10$494
Feb 200307533.487.93$594
Jan 2003958930.315.58$3,376
Dec 200209426.914.85$456
Nov 200208724.664.14$360
Oct 2002649426.464.23$2,091
Sep 200207827.443.64$284
Aug 2002587225.963.16$1,734
Jul 200209424.583.06$288
Jun 2002898523.733.34$2,396
May 2002010324.663.58$369
Apr 20021288823.653.51$3,336
Mar 2002010122.003.10$313
Feb 200207718.222.38$183
Jan 200208117.172.38$192
Dec 200104516.932.36$106
Nov 20014410218.072.41$1,040
Oct 20014510219.782.53$1,148
Sep 2001011124.262.25$250
Aug 20019211724.873.05$2,645
Jul 2001012923.933.20$412
Jun 2001013224.563.82$505
May 200110013425.524.31$3,129
Apr 2001011224.685.34$598
Mar 200109724.545.38$522
Feb 20017312627.755.77$2,752
Jan 2001011927.478.40$999
Dec 20007312226.889.12$3,075
Nov 2000012432.215.66$702
Oct 20006414031.235.15$2,719
Sep 2000855531.875.19$2,994
Aug 2000011329.644.54$513
Jul 2000012128.534.09$495
Jun 200007429.304.40$325
May 200008027.263.68$294
Apr 20004710024.513.12$1,464
Mar 2000012328.422.86$352
Feb 20009911827.622.73$3,056
Jan 2000013025.272.48$322
Dec 1999013524.282.42$327
Nov 19998412623.192.43$2,255
Oct 1999015320.982.80$429
Sep 19998511621.752.62$2,153
Aug 1999012919.262.88$371
Jul 1999013617.892.37$323
Jun 19997012415.942.36$1,409
May 1999013915.792.32$323
Apr 199916214015.102.21$2,755
Mar 1999016112.471.84$296
Feb 199901479.981.82$267
Jan 1999016210.381.90$308
Dec 1998671479.201.77$877
Nov 1998013210.892.19$289
Oct 1998012812.421.97$252

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2020 — as filed, then multipliedworked
Oil                    0 bbl  × $ 57.25 =         $0
Casinghead gas        10 Mcf  × $  2.09 =        $21

────────────────────────────────────────────────────
Month total                                      $21

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/O/28542 is the state's own key, not one this site invented.