COOPER, O. R.

Operated by DAYLIGHT PETROLEUM LLC (P-5 208171) in the WALKER-DAVIS (CONGL. 3960) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 28697District 7BField 94762332OilCasinghead gasSaveExport
Value, all time
$1.4 M
Nov 1999 – May 2026
Value, last 12 filed months
$22 k
at the published price for each month
Months reported
319
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 38 leases and 45 wells, and the rule below applies to all of them.

Discovered
1960-02-04
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1961-12-13.

The Commission's schedule remark for this field reads: NOT FIND DKT TO SET UP UNDER COUNTY REGULAR

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition8,932 bbl$416,264
Casinghead gasProduction203,941 Mcf$935,180
Total$1,351,444

Wells on this lease (2)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.8259, -98.7177. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.6 miles.

32.82585, -98.71772 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
50.0%
1 of 2 wells
With a plug date
50.0%
1 of 2 wells
Median depth
4,032 ft
2 wells filed one
Completion to plug
17 months
median over 1 well

What the state filed about each well

On the RRC proration schedule
150.0%
A plug date is filed
150.0%
BothOn the schedule and plugged. Neither fact cancels the other.
150.0%
NeitherNo plug date, and not on the schedule.
150.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 4,026 and 4,038 ft, median 4,032 ft, over the 2 wells that filed a depth.

Completions filed
Oct 1999 – Mar 2017
2 of 2 wells
Plug dates filed
Aug 2018
1 of 2 wells; 1 filed none

Last completion to plug: a median of 17 months across the 1 well that filed both dates, with the middle half between 17 months and 17 months. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

2 wells

42-4293518334,038 ftMar 2017Aug 2018Yes
42-4293577444,026 ftOct 1999

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (319)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

319 months

May 20260141106.413.05$429
Apr 2026013698.932.87$390
Mar 2026010889.753.15$340
Feb 202603563.503.75$131
Jan 202601959.138.00$152
Dec 2025022956.664.41$1,011
Nov 2025017958.593.93$703
Oct 202510827959.383.30$7,335
Sep 2025030262.743.08$929
Aug 202511630363.933.01$8,329
Jul 2025028866.743.32$955
Jun 2025029366.483.13$917
May 2025029860.553.23$963
Apr 2025029262.363.54$1,035
Mar 2025021567.704.27$918
Feb 202511721170.884.34$9,209
Jan 2025029074.324.28$1,241
Dec 2024014968.993.12$465
Nov 2024028469.052.20$624
Oct 202411131071.372.28$8,629
Sep 2024026569.612.36$627
Aug 2024026375.632.06$543
Jul 2024031079.932.15$665
Jun 2024029978.082.63$788
May 202412156878.812.20$10,785
Apr 2024045684.451.66$757
Mar 2024040880.301.55$630
Feb 2024035076.091.78$624
Jan 202411036573.023.30$9,236
Dec 2023036571.262.61$953
Nov 2023029277.892.81$820
Oct 2023030685.443.09$945
Sep 202311038989.042.74$10,858
Aug 2023041880.522.67$1,117
Jul 2023037574.852.64$991
Jun 2023032568.962.26$734
May 2023031270.622.23$695
Apr 202310929078.122.24$9,164
Mar 2023031072.852.39$742
Feb 2023027375.112.47$673
Jan 2023043376.533.39$1,467
Dec 202211545076.415.73$11,365
Nov 2022032485.005.65$1,829
Oct 2022066887.185.86$3,917
Sep 202201,20084.888.16$9,796
Aug 20221121,20094.529.13$21,539
Jul 202201,148101.587.54$8,658
Jun 20220510115.097.98$4,068
May 20220527109.378.43$4,444
Apr 2022114260104.226.84$13,659
Mar 20220206108.885.08$1,046
Feb 2022027091.054.86$1,312
Jan 2022031081.844.54$1,407
Dec 202102,17071.323.90$8,461
Nov 202102,10077.435.24$10,997
Oct 20211152,05679.795.71$20,924
Sep 2021039069.865.35$2,087
Aug 2021040366.024.22$1,701
Jul 2021040370.783.98$1,605
Jun 2021039069.493.38$1,318
May 20210063.483.02$0
Apr 202111439060.362.76$7,957
Mar 2021040361.302.72$1,095
Feb 2021036457.805.55$2,019
Jan 2021040350.412.81$1,133
Dec 20201521,41644.642.68$10,574
Nov 2020050438.772.71$1,364
Oct 2020040336.972.48$999
Sep 2020039037.091.99$777
Aug 202001,21839.982.39$2,905
Jul 202002,17038.371.83$3,961
Jun 202001,69034.901.69$2,857
May 202002,10016.921.81$3,811
Apr 2020982,10014.751.80$5,235
Mar 202002,17030.341.86$4,028
Feb 202001,96049.881.98$3,882
Jan 202002,17057.252.09$4,546
Dec 201902,17059.012.30$5,000
Nov 201901,70055.302.75$4,676
Oct 2019331,20053.472.42$4,667
Sep 201917343555.052.66$10,680
Aug 2019039753.112.30$915
Jul 2019020956.272.46$514
Jun 2019019952.782.49$496
May 2019022658.482.74$619
Apr 2019020562.632.75$564
Mar 2019022356.803.06$683
Feb 20191838150.852.79$9,532
Jan 2019013746.033.23$442
Dec 2018021146.594.19$883
Nov 201816720052.934.24$9,687
Oct 2018020261.443.40$686
Sep 2018020759.543.11$643
Aug 2018020359.403.07$623
Jul 2018019965.142.93$583
Jun 2018019860.183.08$609
May 201817920365.382.90$12,292
Apr 2018020463.842.90$592
Mar 2018021361.222.79$594
Feb 2018018361.782.77$506
Jan 2018020862.874.01$834
Dec 201717619957.272.92$10,661
Nov 2017023055.423.12$717
Oct 2017017449.292.98$519
Sep 201705947.523.09$182
Aug 201704545.373.00$135
Jul 20171666543.873.09$7,483
Jun 201707442.493.09$228
May 201707645.373.26$248
Apr 201708347.933.21$267
Mar 201708846.772.98$263
Feb 20171649150.452.95$8,542
Jan 2017012149.413.42$414
Dec 2016010648.763.72$395
Nov 2016010642.492.64$280
Oct 2016012146.193.09$374
Sep 2016059541.553.10$1,845
Aug 2016043541.442.92$1,272
Jul 2016013941.622.92$406
Jun 2016012545.352.69$336
May 2016034842.521.99$693
Apr 2016064536.561.99$1,284
Mar 2016023333.011.79$418
Feb 201618623626.472.06$5,410
Jan 2016025527.352.36$603
Dec 2015027632.362.00$552
Nov 2015028138.792.17$609
Oct 2015027943.552.43$677
Sep 2015026542.992.76$731
Aug 2015028240.162.87$810
Jul 2015027948.152.95$822
Jun 201517826956.152.88$10,770
May 2015026555.212.96$783
Apr 2015026349.822.71$712
Mar 2015029042.892.93$851
Feb 2015028144.662.98$836
Jan 2015029743.433.10$921
Dec 2014028254.693.59$1,013
Nov 2014030470.464.25$1,293
Oct 2014030278.303.90$1,178
Sep 2014031086.164.05$1,254
Aug 2014031789.394.04$1,279
Jul 2014031096.564.18$1,296
Jun 2014031498.164.74$1,487
May 2014032994.734.73$1,555
Apr 2014032195.944.81$1,544
Mar 2014049095.895.06$2,478
Feb 20141723697.406.19$16,976
Jan 2014026690.404.86$1,293
Dec 2013029091.824.35$1,263
Nov 2013033288.853.74$1,241
Oct 2013028297.423.78$1,066
Sep 20130430104.113.72$1,599
Aug 20130328104.253.52$1,155
Jul 20130387102.523.72$1,439
Jun 2013031094.403.93$1,219
May 2013026094.834.15$1,079
Apr 2013032893.964.28$1,405
Mar 2013055593.623.91$2,172
Feb 2013031291.233.42$1,067
Jan 2013033491.603.42$1,142
Dec 2012039186.773.42$1,337
Nov 2012031886.953.62$1,153
Oct 2012027689.383.40$938
Sep 2012030594.672.92$890
Aug 2012027692.662.91$803
Jul 2012040985.133.02$1,236
Jun 2012033379.822.52$839
May 2012033891.612.49$841
Apr 20120353101.652.00$705
Mar 20120375105.052.22$833
Feb 20120361101.102.57$928
Jan 2012038298.092.73$1,044
Dec 2011039696.873.24$1,283
Nov 2011045695.723.31$1,510
Oct 2011044184.983.65$1,609
Sep 2011023883.623.99$949
Aug 2011029383.404.15$1,216
Jul 2011034594.144.52$1,558
Jun 2011032692.904.64$1,513
May 2011038998.134.40$1,713
Apr 20110369105.964.33$1,599
Mar 201115341496.364.06$16,423
Feb 2011045185.644.18$1,885
Jan 2011045086.504.59$2,065
Dec 2010048985.734.35$2,126
Nov 2010036380.843.80$1,378
Oct 2010042878.103.51$1,502
Sep 2010053072.633.98$2,109
Aug 2010057873.684.42$2,554
Jul 2010059972.554.74$2,837
Jun 2010059970.364.91$2,941
May 2010060871.124.24$2,575
Apr 2010036581.694.12$1,505
Mar 2010044678.394.39$1,957
Feb 2010066173.585.44$3,597
Jan 2010033474.365.96$1,992
Dec 2009036171.445.48$1,980
Nov 2009044874.593.75$1,681
Oct 2009043372.544.11$1,780
Sep 2009038265.543.06$1,171
Aug 2009040767.423.22$1,310
Jul 2009041561.133.46$1,438
Jun 2009041866.163.90$1,628
May 2009043054.743.93$1,688
Apr 2009045146.773.59$1,618
Mar 2009032542.144.06$1,319
Feb 2009031432.814.63$1,455
Jan 2009032335.865.37$1,735
Dec 2008024037.105.98$1,435
Nov 2008055455.496.86$3,801
Oct 2008074075.246.92$5,122
Sep 20080547101.767.88$4,309
Aug 20080702114.228.48$5,955
Jul 20080712131.0811.39$8,109
Jun 2008151758131.3313.03$29,710
May 20080821123.1711.57$9,502
Apr 20080774110.3110.45$8,092
Mar 20080773101.909.66$7,470
Feb 2008071392.538.77$6,253
Jan 2008076290.388.21$6,253
Dec 2007059188.337.30$4,315
Nov 2007071391.677.29$5,199
Oct 2007076282.856.92$5,275
Sep 2007073575.846.24$4,589
Aug 2007076069.066.39$4,855
Jul 2007075270.906.39$4,804
Jun 200712088362.007.55$14,105
May 2007084758.747.85$6,646
Apr 2007074659.617.81$5,823
Mar 2007074956.927.30$5,469
Feb 2007057455.108.22$4,716
Jan 2007068550.306.73$4,608
Dec 2006083556.656.92$5,777
Nov 2006075754.207.62$5,766
Oct 2006062254.906.01$3,741
Sep 2006050160.085.04$2,524
Aug 2006050368.717.34$3,692
Jul 200616441469.376.34$14,003
Jun 2006049566.286.38$3,160
May 2006060466.016.42$3,881
Apr 2006047964.397.36$3,526
Mar 2006068556.707.08$4,852
Feb 20060057.597.75$0
Jan 2006054660.598.93$4,878
Dec 2005058554.9413.42$7,848
Nov 2005059454.6910.59$6,290
Oct 2005058958.3413.80$8,126
Sep 20059640761.4512.08$10,815
Aug 2005058161.519.80$5,692
Jul 2005071755.697.84$5,624
Jun 2005093852.337.38$6,923
May 2005083945.226.65$5,580
Apr 2005071749.207.36$5,277
Mar 200514074850.377.15$12,404
Feb 2005068845.226.31$4,343
Jan 2005076343.166.32$4,824
Dec 200416169439.866.75$11,103
Nov 2004071245.286.33$4,507
Oct 2004081449.706.52$5,303
Sep 200417481443.245.28$11,825
Aug 2004091942.375.55$5,101
Jul 2004073238.286.08$4,454
Jun 200415778236.106.43$10,698
May 2004091537.486.49$5,943
Apr 200416479434.475.86$10,305
Mar 2004077534.365.53$4,286
Feb 2004076132.455.51$4,193
Jan 20041691,12232.036.30$12,481
Dec 200301,66030.266.30$10,461
Nov 20031731,11328.804.60$10,097
Oct 200301,39928.174.76$6,659
Sep 200301,11526.314.75$5,296
Aug 200301,17229.765.13$6,012
Jul 20031621,20929.415.17$11,016
Jun 200301,07028.565.98$6,402
May 200301,09926.595.97$6,564
Apr 200301,07926.675.41$5,834
Mar 20031801,11731.146.10$12,414
Feb 2003084533.487.93$6,697
Jan 200315878830.315.58$9,188
Dec 2002092026.914.85$4,465
Nov 200214197324.664.14$7,502
Oct 200201,32726.464.23$5,612
Sep 2002087227.443.64$3,170
Aug 2002083425.963.16$2,639
Jul 20021671,77824.583.06$9,549
Jun 2002087223.733.34$2,911
May 2002018924.663.58$677
Apr 20021811,95023.653.51$11,130
Mar 2002661,10522.003.10$4,881
Feb 200201,04518.222.38$2,483
Jan 20021771,19717.172.38$5,883
Dec 200101,25716.932.36$2,972
Nov 200101,81918.072.41$4,376
Oct 20011691,61719.782.53$7,432
Sep 200101,61724.262.25$3,640
Aug 200102,46024.873.05$7,511
Jul 20011641,79623.933.20$9,666
Jun 200101,72424.563.82$6,593
May 20011572,12525.524.31$13,160
Apr 200102,00624.685.34$10,703
Mar 200115483624.545.38$8,274
Feb 20011821,11027.755.77$11,452
Jan 200101,83927.478.40$15,445
Dec 20001911,72226.889.12$20,843
Nov 200001,34832.215.66$7,627
Oct 20001721,86831.235.15$14,983
Sep 200002,10631.875.19$10,923
Aug 20001681,95429.644.54$13,852
Jul 20000028.534.09$0
Jun 20001801,85929.304.40$13,448
May 200002,02127.263.68$7,437
Apr 20001452,13024.513.12$10,191
Mar 20001802,10328.422.86$11,130
Feb 20001761,91927.622.73$10,093
Jan 20001752,17225.272.48$9,810
Dec 19991661,41224.282.42$7,453
Nov 199901,78023.192.43$4,333

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Oil                    0 bbl  × $106.41 =         $0
Casinghead gas       141 Mcf  × $  3.05 =       $429

────────────────────────────────────────────────────
Month total                                     $429

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/O/28697 is the state's own key, not one this site invented.