BOWNE "2989"

Operated by VAN OPERATING, LTD. (P-5 881442) in the BOWNE (CADDO) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 29176District 7BField 10944400OilCasinghead gasSaveExport
Value, all time
$367 k
Jul 2002 – Oct 2018
Value, last 12 filed months
$9 k
at the published price for each month
Months reported
196
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 13 leases and 15 wells, and the rule below applies to all of them.

Discovered
1979-06-17
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1984-03-09.

The Commission's schedule remark for this field reads: RULES PERM.10/15/84 DOCKET 7B-83,159

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition2,989 bbl$169,707
Casinghead gasProduction29,292 Mcf$197,328
Total$367,035

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.4879, -99.1242. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.48789, -99.12420 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
4,083 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,083 ft.

Completions filed
Jan 2018
1 of 1 wells

1 well

42-0593223814,083 ftJan 2018Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (196)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

196 months

Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 2018156060.183.08$9,388
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 201701,12847.523.09$3,482
Aug 201703045.373.00$90
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 201502042.992.76$55
Aug 201501440.162.87$40
Jul 201501248.152.95$35
Jun 201501556.152.88$43
May 201503755.212.96$109
Apr 201502549.822.71$68
Mar 20150342.892.93$9
Feb 201502344.662.98$68
Jan 201501043.433.10$31
Dec 20141683454.693.59$9,310
Nov 201403070.464.25$128
Oct 201401178.303.90$43
Sep 201401286.164.05$49
Aug 201402389.394.04$93
Jul 20140396.564.18$13
Jun 20140798.164.74$33
May 201401094.734.73$47
Apr 201401595.944.81$72
Mar 20140095.895.06$0
Feb 201401097.406.19$62
Jan 20140590.404.86$24
Dec 201301191.824.35$48
Nov 201304588.853.74$168
Oct 20130097.423.78$0
Sep 201301104.113.72$4
Aug 201302104.253.52$7
Jul 2013015102.523.72$56
Jun 201301994.403.93$75
May 20130794.834.15$29
Apr 20130993.964.28$39
Mar 2013032993.623.91$1,287
Feb 20131651391.233.42$15,097
Jan 201302191.603.42$72
Dec 201201186.773.42$38
Nov 201205686.953.62$203
Oct 201201689.383.40$54
Sep 201201694.672.92$47
Aug 201201492.662.91$41
Jul 20120485.133.02$12
Jun 20120479.822.52$10
May 201201091.612.49$25
Apr 20120166101.652.00$331
Mar 20120168105.052.22$373
Feb 201217525101.102.57$17,757
Jan 201207198.092.73$194
Dec 201104696.873.24$149
Nov 201106895.723.31$225
Oct 201105984.983.65$215
Sep 201105783.623.99$227
Aug 2011010683.404.15$440
Jul 201109594.144.52$429
Jun 2011014992.904.64$691
May 201109198.134.40$401
Apr 2011092105.964.33$399
Mar 2011010596.364.06$426
Feb 201108385.644.18$347
Jan 20111705586.504.59$14,957
Dec 201004985.734.35$213
Nov 201001080.843.80$38
Oct 201001278.103.51$42
Sep 201001772.633.98$68
Aug 201003073.684.42$133
Jul 201006572.554.74$308
Jun 201005070.364.91$246
May 201003171.124.24$131
Apr 201004681.694.12$190
Mar 201001178.394.39$48
Feb 2010164273.585.44$12,078
Jan 20100574.365.96$30
Dec 20090571.445.48$27
Nov 20090174.593.75$4
Oct 20090272.544.11$8
Sep 20090165.543.06$3
Aug 20090767.423.22$23
Jul 200902561.133.46$87
Jun 200905166.163.90$199
May 200902454.743.93$94
Apr 200903146.773.59$111
Mar 20090042.144.06$0
Feb 20091705332.814.63$5,823
Jan 200904535.865.37$242
Dec 200803437.105.98$203
Nov 200803655.496.86$247
Oct 200801475.246.92$97
Sep 2008024101.767.88$189
Aug 2008024114.228.48$204
Jul 2008036131.0811.39$410
Jun 2008056131.3313.03$730
May 2008025123.1711.57$289
Apr 200802110.3110.45$21
Mar 200817250101.909.66$18,010
Feb 200803692.538.77$316
Jan 200803090.388.21$246
Dec 200704188.337.30$299
Nov 200703391.677.29$241
Oct 200705182.856.92$353
Sep 200707275.846.24$450
Aug 200708069.066.39$511
Jul 200703670.906.39$230
Jun 20071734162.007.55$11,035
May 200703758.747.85$290
Apr 200702259.617.81$172
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 200602354.207.62$175
Oct 2006165254.906.01$9,071
Sep 20060160.085.04$5
Aug 20060968.717.34$66
Jul 200605369.376.34$336
Jun 2006017266.286.38$1,098
May 2006010366.016.42$662
Apr 2006020464.397.36$1,502
Mar 200601656.707.08$113
Feb 200601057.597.75$78
Jan 200616617660.598.93$11,630
Dec 2005092754.9413.42$12,436
Nov 2005099154.6910.59$10,493
Oct 2005088858.3413.80$12,251
Sep 2005082061.4512.08$9,905
Aug 2005078361.519.80$7,671
Jul 2005077755.697.84$6,095
Jun 2005083152.337.38$6,134
May 2005093545.226.65$6,219
Apr 200516578949.207.36$13,925
Mar 2005094250.377.15$6,740
Feb 2005080745.226.31$5,094
Jan 2005095743.166.32$6,050
Dec 2004090539.866.75$6,110
Nov 2004077645.286.33$4,912
Oct 2004087749.706.52$5,714
Sep 200414687943.245.28$10,958
Aug 2004082742.375.55$4,590
Jul 2004059138.286.08$3,596
Jun 2004080336.106.43$5,166
May 2004089637.486.49$5,819
Apr 200416088234.475.86$10,682
Mar 2004073234.365.53$4,048
Feb 2004055432.455.51$3,052
Jan 2004012432.036.30$781
Dec 200316220730.266.30$6,207
Nov 200309928.804.60$455
Oct 2003024228.174.76$1,152
Sep 2003025126.314.75$1,192
Aug 200316938329.765.13$6,994
Jul 2003040029.415.17$2,068
Jun 2003035528.565.98$2,124
May 2003037126.595.97$2,216
Apr 200316520126.675.41$5,487
Mar 2003025531.146.10$1,554
Feb 2003020933.487.93$1,657
Jan 2003015230.315.58$848
Dec 200202326.914.85$112
Nov 200216720524.664.14$4,966
Oct 2002034426.464.23$1,455
Sep 2002034027.443.64$1,236
Aug 2002019525.963.16$617
Jul 20021112924.583.06$665

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2018 — as filed, then multipliedworked
Oil                  156 bbl  × $ 60.18 =     $9,388
Casinghead gas         0 Mcf  × $  3.08 =         $0

────────────────────────────────────────────────────
Month total                                   $9,388

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/O/29176 is the state's own key, not one this site invented.