MIDDLETON FARM

Operated by WALSH RESOURCES, INC. (P-5 894500) in the TAYLOR COUNTY REGULAR field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 29628District 7BField 88520001OilCasinghead gasSaveExport
Value, all time
$821 k
Jul 2005 – Feb 2021
Value, last 12 filed months
$0
at the published price for each month
Months reported
188
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 717 leases and 1,491 wells, and the rule below applies to all of them.

Discovered
1929-12-31
as the register files it
Field class
Oil
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition11,590 bbl$817,210
Casinghead gasProduction743 Mcf$3,494
Total$820,704

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.1164, -99.9741. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.11637, -99.97414 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,740 ft
1 wells filed one
Completion to plug
15.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,740 ft.

Completions filed
Jul 2005
1 of 1 wells
Plug dates filed
Oct 2020
1 of 1 wells

Last completion to plug: a median of 15.3 years across the 1 well that filed both dates, with the middle half between 15.3 years and 15.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4413412714,740 ftJul 2005Oct 2020Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (188)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

188 months

Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 201976053.472.42$4,064
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180561.443.40$17
Sep 2018172559.543.11$10,256
Aug 20180559.403.07$15
Jul 20180565.142.93$15
Jun 20180560.183.08$15
May 2018170565.382.90$11,129
Apr 20180563.842.90$15
Mar 2018168561.222.79$10,299
Feb 20180561.782.77$14
Jan 2018166562.874.01$10,456
Dec 20170557.272.92$15
Nov 20170555.423.12$16
Oct 20170549.292.98$15
Sep 2017166547.523.09$7,904
Aug 20170545.373.00$15
Jul 20170543.873.09$15
Jun 2017169542.493.09$7,196
May 20170545.373.26$16
Apr 20170547.933.21$16
Mar 201784546.772.98$3,944
Feb 2017165550.452.95$8,339
Jan 20170549.413.42$17
Dec 20160548.763.72$19
Nov 2016170542.492.64$7,237
Oct 20160546.193.09$15
Sep 2016167541.553.10$6,954
Aug 20160541.442.92$15
Jul 2016166541.622.92$6,924
Jun 20160545.352.69$13
May 2016167542.521.99$7,111
Apr 20160536.561.99$10
Mar 20160533.011.79$9
Feb 2016167526.472.06$4,431
Jan 20160527.352.36$12
Dec 2015166532.362.00$5,382
Nov 20150538.792.17$11
Oct 2015161543.552.43$7,024
Sep 20150542.992.76$14
Aug 2015164540.162.87$6,601
Jul 20150548.152.95$15
Jun 2015167556.152.88$9,391
May 20150555.212.96$15
Apr 20150549.822.71$14
Mar 2015168542.892.93$7,220
Feb 20150544.662.98$15
Jan 2015171543.433.10$7,442
Dec 20140554.693.59$18
Nov 2014166570.464.25$11,718
Oct 20140578.303.90$20
Sep 2014164586.164.05$14,150
Aug 20140589.394.04$20
Jul 2014166596.564.18$16,050
Jun 20140598.164.74$24
May 2014164594.734.73$15,559
Apr 20140595.944.81$24
Mar 2014167595.895.06$16,039
Feb 20140597.406.19$31
Jan 20140590.404.86$24
Dec 2013168591.824.35$15,448
Nov 20130588.853.74$19
Oct 2013182597.423.78$17,749
Sep 20131675104.113.72$17,405
Aug 201305104.253.52$18
Jul 20131655102.523.72$16,934
Jun 20130594.403.93$20
May 2013156594.834.15$14,814
Apr 20130593.964.28$21
Mar 2013170593.623.91$15,935
Feb 20130591.233.42$17
Jan 20130591.603.42$17
Dec 2012165586.773.42$14,334
Nov 20120586.953.62$18
Oct 2012167589.383.40$14,943
Sep 2012172594.672.92$16,298
Aug 20120592.662.91$15
Jul 20120585.133.02$15
Jun 2012179579.822.52$14,300
May 20120591.612.49$12
Apr 20121775101.652.00$18,002
Mar 201205105.052.22$11
Feb 20121885101.102.57$19,020
Jan 20120598.092.73$14
Dec 2011190596.873.24$18,422
Nov 20110595.723.31$17
Oct 2011167584.983.65$14,210
Sep 2011182583.623.99$15,239
Aug 20110583.404.15$21
Jul 20110094.144.52$0
Jun 20110592.904.64$23
May 2011166598.134.40$16,312
Apr 201105105.964.33$22
Mar 20110596.364.06$20
Feb 20110085.644.18$0
Jan 20110586.504.59$23
Dec 2010172585.734.35$14,767
Nov 20100580.843.80$19
Oct 2010161578.103.51$12,592
Sep 20100572.633.98$20
Aug 2010177573.684.42$13,063
Jul 20100572.554.74$24
Jun 20100570.364.91$25
May 2010157571.124.24$11,187
Apr 20100581.694.12$21
Mar 2010184378.394.39$14,437
Feb 20100373.585.44$16
Jan 20100374.365.96$18
Dec 2009182371.445.48$13,019
Nov 20090374.593.75$11
Oct 2009188372.544.11$13,650
Sep 20090365.543.06$9
Aug 20090367.423.22$10
Jul 20090361.133.46$10
Jun 2009189366.163.90$12,516
May 20090354.743.93$12
Apr 2009151346.773.59$7,073
Mar 20090342.144.06$12
Feb 2009174332.814.63$5,723
Jan 2009185335.865.37$6,650
Dec 20080337.105.98$18
Nov 20080555.496.86$34
Oct 2008185575.246.92$13,954
Sep 20081875101.767.88$19,069
Aug 200805114.228.48$42
Jul 20081855131.0811.39$24,307
Jun 200805131.3313.03$65
May 200805123.1711.57$58
Apr 200800110.3110.45$0
Mar 200805101.909.66$48
Feb 2008184592.538.77$17,069
Jan 20080590.388.21$41
Dec 2007126588.337.30$11,166
Nov 20070591.677.29$36
Oct 2007181582.856.92$15,030
Sep 20070575.846.24$31
Aug 20070569.066.39$32
Jul 20070570.906.39$32
Jun 2007185562.007.55$11,508
May 20070558.747.85$39
Apr 2007186559.617.81$11,126
Mar 20070556.927.30$37
Feb 20070555.108.22$41
Jan 2007172550.306.73$8,685
Dec 20060556.656.92$35
Nov 2006170554.207.62$9,252
Oct 20060554.906.01$30
Sep 2006173560.085.04$10,419
Aug 20060568.717.34$37
Jul 2006150569.376.34$10,437
Jun 2006152566.286.38$10,106
May 20060566.016.42$32
Apr 2006162564.397.36$10,468
Mar 2006164556.707.08$9,334
Feb 20060557.597.75$39
Jan 20060560.598.93$45
Dec 20050554.9413.42$67
Nov 2005167554.6910.59$9,186
Oct 2005183558.3413.80$10,745
Sep 20050561.4512.08$60
Aug 20050061.519.80$0
Jul 20050055.697.84$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2019 — as filed, then multipliedworked
Oil                   76 bbl  × $ 53.47 =     $4,064
Casinghead gas         0 Mcf  × $  2.42 =         $0

────────────────────────────────────────────────────
Month total                                   $4,064

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 7B/O/29628 is the state's own key, not one this site invented.